Eastside Treatment Plant UV Replacement
Project Information
- Bid Title
- Eastside Treatment Plant UV Replacement
- Issuing Agency
- City of Bremerton
- Location
- Washington
- Published Date
- Feb 18, 2026
- Closing Date
- Mar 17, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Title: Eastside Treatment Plant UV Replacement
Category: Public Works & Utilities Status: Open Description: The WORK to be completed includes, but is not limited to, demolition, removal of existing treatment equipment, electrical controls, panels, and related appurtenances, modification of the existing concrete channel and related structures, installation of owner furnished ultraviolet (UV) equipment, installation of owner furnished electrical panels, motor control centers, breakers and related electrical equipment, control modification to existing equipment, structural modifications to the existing building roof, siding, and systems including louvers, testing, startup, and commissioning of the new treatment plant all in accordance with the Contract Plans, these Contract Provisions including the Technical Specifications, and the Standard Specifications.
This work must be completed in the summer dry season window while the plant is offline. If work extends past the Completion of Work date noted in this section, Contractor will be subject to liquidated damage as described in these specifications.
This project is funded, in part, by the Washington State Department of Ecology. Neither the State of Washington nor any of its departments or employees are, or shall be, a party to any contract or any subcontract resulting from the solicitation of bids.
The Successful bidder will be required to conform to the wage requirements prescribed by the federal Davis-Bacon and Relate Acts which requires that all laborers and mechanics employed by contractors and subcontractors performing on contracts funded in whole or in part by SRF appropriations in excess of $2000 pay their laborers and mechanics not less than the prevailing wage rates and fringe benefits, and determined by the Secretary of Labor, for corresponding classes of laborers and mechanics employed on similar projects in the area.
The proposed UV system and Motor Control Center (MCC) breakers have been pre-purchased by the Owner. The scope of supply of the owner furnished equipment is covered in Appendix A. The pre-purchased equipment will be delivered to the WWTP at 2500 Stephenson Avenue, Bremerton, WA by end of May 2026. The Contractor shall include provisions in their bid to transport and store such package and install the unit and associated work per contract documents.
Engineer's estimate range for this project is $2.3 - $2.8 million.
Publication Date/Time: 2/18/2026 12:00 AM Closing Date/Time: 3/17/2026 11:00 AM Contact Person: David Powell, PE, Phone: 360-473-5268, Email: david.powell@ci.bremerton.wa.us Related Documents: - Attachment Preview
- To access this preview, please sign up here.
- Commodity Codes
-
- NAICS 221320Sewage Treatment Facilities
- NAICS 237110Water and Sewer Line and Related Structures Construction
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Follow SILVER CYANIDE Active Contract Opportunity Notice ID SPMYM226Q7957 Related Notice Department/Ind. Agency
DEPT OF DEFENSE
Bid Due: 8/25/2026
Activated Powder Carbon, As N...
Number ITB 6521-26 Title Activated Powder Carbon, As Needed Over 5-Year Period Available
City of Spokane
Bid Due: 9/22/2026