John Day Fish Pump Rehabilitation
Project Information
- Bid Title
- John Day Fish Pump Rehabilitation
- Issuing Agency
- DEPT OF DEFENSE
- Location
- Oregon
- Published Date
- Apr 8, 2026
- Closing Date
- May 8, 2026
- Government Level
- Federal
- Status
- Closed
- Ref. #
- W9127N26BA001
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Set Aside
- Total Small Business Set-Aside (FAR 19.5)
- Project Description
-
FollowJohn Day Fish Pump RehabilitationActiveContract OpportunityNotice IDW9127N26BA001Related NoticeW9127N26BA001Department/Ind. AgencyDEPT OF DEFENSESub-tierDEPT OF THE ARMYMajor CommandUS ARMY CORPS OF ENGINEERSSub CommandENGINEER DIVISION NORTHWESTERNSub Command 2ENDIST PORTLANDOfficeW071 ENDIST PORTLANDGeneral InformationLooking for contract opportunity help?
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Solicitation (Original)
- Original Published Date: Apr 08, 2026 01:09 pm PDT
- Original Date Offers Due: May 08, 2026 01:00 pm PDT
- Inactive Policy: 15 days after date offers due
- Original Inactive Date: May 23, 2026
-
Initiative:
- None
Classification- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: Z2KA - REPAIR OR ALTERATION OF DAMS
-
NAICS Code:
- 237990 - Other Heavy and Civil Engineering Construction
-
Place of Performance:
Rufus , ORUSA
DescriptionThe U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for the John Day Fish Pump Rehabilitation at John Day Dam, Oregon. The proposed project will be a Total Small Business Set-Aside, firm-fixed price (FFP) contract.
Background: Prior work on fish pump No.3 included replacement of the lower pump shaft, true-up machining of the upper pump shaft, true-up machining of the upper and lower bearing mounting flanges and spigot bores on the cover plate and diffuser, and true-up machining of the diffuser extension cone. The propeller itself had its blade tips built up with weld and re-machined a proper clearance (nominally 1/8" radial clearance) to the pit liner. In addition, the propeller center bores were true-up machined for proper fit (0.004-0.006" clearance) to the new lower shaft. The upper and lower bearings were fitted with greaseless bearing liners and the shafts existing stainless bearing journals were replaced with spares originally manufactured by Worthington Pump. work will be replicated for pump No.2 and possible pump No.1 and No. 3.
Purpose: The project will include the removal, refurbishment, and replacement of major components of Fish Pump Units 1, 2 and 3, including but not limited to shafts, bearings, bearing brackets, and right-angle drive gearboxes. Work will require field disassembly of existing equipment, transport of components for off-site shop repair, precision machining, fabrication of replacement parts, and final reinstallation and alignment to manufacturer specifications.
The following information represents the project objectives:
- Removal and replacement of damaged pump shafts and bearings.
- Repair-by-replacement of approximately 1000 horsepower class power transmission and reduction gearbox.
- Precision machining (true-up) of shafts, bearing housings, and diffuser components.
- Installation of greaseless bearing liners and replacement of stainless-steel bearing journals.
- On-site reassembly, shaft alignment, gearbox installation, and system balancing.
- Testing of the completed pump unit(s) to verify functional performance.
- Delivery of updated operation and maintenance manuals, drawings, and spare parts.
Attachments/LinksContact InformationHistoryContracting Office Address- KO CONTRACTING DIVISION 333 SW FIRST AVE
- PORTLAND , OR 97204-3495
- USA
Primary Point of Contact- Kristel Flores
- Kristel.M.Flores@usace.army.mil
Secondary Point of Contact- Cory Pfenning
- cory.r.pfenning@usace.army.mil
- Apr 08, 2026 01:09 pm PDTSolicitation (Original)
- Mar 11, 2026 08:55 pm PDT Presolicitation (Original)
- Commodity Codes
-
- FSC ZMaintenance, Repair or Alteration of Real Property
- NAICS 237990Other Heavy and Civil Engineering Construction
- Related bids
-
Feb 9, 2026 [Presolicitation (Original)] John Day Fish Rehabilitation Apr 9, 2026 [Solicitation (Updated)] John Day Fish Pump Rehabilitation Apr 22, 2026 [Solicitation (Updated)] John Day Fish Pump Rehabilitation May 1, 2026 [Solicitation (Updated)] John Day Fish Pump Rehabilitation May 4, 2026 [Solicitation (Updated)] John Day Fish Pump Rehabilitation May 6, 2026 [Solicitation (Updated)] John Day Fish Pump Rehabilitation May 12, 2026 [Solicitation (Updated)] John Day Fish Pump Rehabilitation May 21, 2026 [Solicitation (Updated)] John Day Fish Pump Rehabilitation Jun 16, 2026 [Solicitation (Updated)] John Day Fish Pump Rehabilitation
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Willamette NF, MF 26-1 Willam...
Follow Willamette NF, MF 26-1 Willamette Complex North Suppression Repair Road Maintenance Active
Federal Agency
Bid Due: 7/07/2026
John Day Fish Pump Rehabilita...
Follow John Day Fish Pump Rehabilitation Active Contract Opportunity Notice ID W9127N26BA031 Related
DEPT OF DEFENSE
Bid Due: 7/17/2026