IFB 26-27-TO Pump Station 33 Maintenance Improvements - Addendum 2
Project Information
- Bid Title
- IFB 26-27-TO Pump Station 33 Maintenance Improvements - Addendum 2
- Issuing Agency
- County of Spotsylvania
- Location
- Virginia
- Published Date
- Feb 13, 2026
- Closing Date
- Mar 4, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
- IFB 26-27-TO Pump Station 33 Maintenance Improvements - Addendum 2
- Attachment Preview
-
Finance | Procurement Division8800 Courthouse Road | Spotsylvania, VA 22553Phone: 540-507-7596Addendum No. 2IFB No. 26-27-TOPump Station 33 Maintenance ImprovementsFebruary 13, 2026This Addendum is issued in accordance with the IFB Terms & Conditions and is intended to provideadditional information and clarification to Respondents.This Addendum consists of two (2) items which are listed below and is an integral part of the IFB to whichit is attached, and is incorporated therein and made part thereof by this reference.Item 1 – Questions and Answers1. Please confirm the existing grade/top of slab around building is approximately El. 202.ANSWER: The existing grade/top of the slab associated with both buildings is approximatelyelevation 203. Elevations provided are approximate and bidders are responsible for verifying fieldconditions prior to bid.2. What is the elevation of the bottom of the wet well?ANSWER: The bottom of the wet well was not directly surveyed, but the measured aspects ofthe construction are highly consistent with the design documents. The design documents indicatea bottom of wet well to be 175.27, or approximately 27.7 feet deep relative to the top of slab.Bidders shall rely on the contract documents and perform their own due diligence regardingdepths and field conditions.3. Please provide more details regarding the existing buildings construction. Specifically, for thebuildings to be relocated and the one to have its roof removed/replaced.ANSWER: The building to be relocated is a Smith Midland precast concrete structure that hasconstruction typical to such structures in 2002. The walls are held to the slab with metal anchorangles as well as bonding adhesive, as is the walls to each other, as well as the roof to the walls.While there have been small alterations to the Smith Midland buildings over the years, theprinciples of construction remain similar today to what exists at this location.4. Will the County remove any chemicals from the tanks prior to demolition? If no, please providetype of chemicals and approximate quantity remaining.ANSWER: The tanks have been emptied. There still may be residual Bioxide chemical insidethe tanks. Any residual chemical shall be disposed of in accordance with applicableenvironmental regulations and facility requirements.Addendum 2IFB 26-27-TO | Page 1 of 35. Please provide more information and details regarding the ABBA pump that is shown on Sheet 8to be on the dry well floor.ANSWER: Additional information on the ABBA pump and associated installation can beobtained from the Pump Supplier. In this case, the ABBA Authorized Supplier is SealingMaintenance and Products. See Attachment A - ABBA Parts SMP Quick Reference Guide foryour reference. This reference is provided for informational purposes only.6. Notes 26 and 27 call for a Bubbler Pump and a Muffin Monster Hydraulic Pump and ControlPanel. Please provide specs and detail on this equipment.ANSWER: The bubbler pump and Muffin Monster hydraulic pump as well as the associatedcontrols for both existing and active systems within the house is being removed/relocated. Thecontract does not require purchase/replacement of either feature. The contract requires theexisting control panel be appropriately located/affixed to a permanent base and that each of thesefeatures is protected from the elements within a fiberglass enclosure as described in the plans.7. Is there a set of specifications for the job or just notes on the plans?ANSWER: See Attachment K – Technical Specifications. If there are any specific items notalready covered in the published specifications or sufficiently controlled/detailed in theconstruction documents, please respond with a follow-up question so these items can be clarified.8. Does the Engineer have a concept for moving the existing brick and concrete building?ANSWER: There is no information related to the relocation of the existing building in theconstruction documents. The Owner intends to move the building from the existing location to apreviously prepared slab within the site in accordance with the bid documents. The intent is toutilize the existing walls, roof, and door systems, have unused openings appropriatelyparged/filled, re-use the existing metal anchor angles if in good condition, and have all newhardware/bolts/washers used in the reinstallation. The Contractor shall be responsible for allmeans and methods associated with relocation of the structure and for ensuring the structuralintegrity of the building during and after relocation. A relocation plan shall be submitted forreview prior to execution of the work. If there is a specific question related to this relocationbeyond this clarification, please respond with a follow-up question so these items can be furtherclarified.9. Can the tanks in the odor control building be cut up and removed through the door? If so, can thebuilding remain in place?ANSWER: Yes, the fiberglass tanks may be cut up to allow for easy removal. Theodor control building may remain in place if the equipment is removed through the door.Item 2 – Pre-Bid Attendees1. Earl Knapp, Maverick Construction2. Keith Oster, SDI3. Lisa Bailey, Spotsylvania CountyAttachments:Attachment A – ABBA Parts SMP Quick Reference GuideAddendum 2IFB 26-27-TO | Page 2 of 3Respondents shall acknowledge receipt of this Addendum with Bid submission.Vendor NameDateSignatureTitleAddendum 2IFB 26-27-TO | Page 3 of 3ATTACHMENT A QUICK REFERENCE GUIDEABBA’s FM-INTERCHANGE SERIESparts, assemblies and pumps to fit or replace existing Fairbanks Morse®* replaces 5410vertical*replaces 5420horizontal* replaces 5430built-togetherABBA manufactures ALL replacement parts, drop in rotating assemblies and complete replacement pumps to fit all sizes and models* replaces 5440close coupled2800/5800Horizontal Splitase(not shown)ABBA manufactures replacement partsand rotating assemblies* replaces 5710/5740vertical* replaces 5720horizontal* replaces2410/2420/2440vertical or horizontalABBA manufactures most replacement impellers, wear parts, rotating assemblies and complete pumps* replaces 5430MTsubmersibletangential discharge / pull up(not shown)* replaces 5430MV & MVKSubmersiblecenterline discharge, pull-up* replaces 5430WDdry-pit submersibletangential discharge* replaces 5430Wsubmersibletangential discharge / base mount(not shown)ABBA manufactures all replacement impellers, volutes, pump end components, rotating assemblies and complete replacement pumpsABBA manufactures all replacement impellers and most volutes, guide rail brackets, rotating assemblies and complete pumpsFor over 30 years our parts have proven to perform and last as well or better than the OEM.AURORA, FAIRBANKS MORSE, and VTSH are the trademarks of Pentair Flow Technologies, LLC or its affiliates. Pentair Flow Technologies, LLC has not approved, sponsored, or endorsed ABBA or its products and is not affiliated withABBA. NOTE: ALL OEM NAMES, REGISTERED TRADE MARKS, NUMBERS, SYMBOLS AND DESCRIPTIONS ARE FOR REFERENCE PURPOSES ONLY. IT IS NOT IMPLIED THAT ANY PART LISTED IS THE PRODUCT OF THEOEM. ABBA PARTS AND SERVICE IS NOT A DISTRIBUTOR OR AGENT FOR, NOR AFFILIATED IN ANY WAY WITH THE REFERENCED OEM.QUICK REFERENCE GUIDEABBA’s AC-INTERCHANGE SERIESparts, assemblies and pumps to fit or replace existing Allis Chalmers* replaces NSWmodel 100/150* replaces NSWVmodel 200/250* replaces NSWVmodel 300/350* replaces NSWVmodel 4008000/9000 Axially-SplitHorizontal Splitase(not shown)ABBA manufactures replacement partsand rotating assemblies* replaces NSYmodel 100/150* replaces NSYVmodel 200/250* replaces NSYVmodel 300/350ABBA manufactures ALL replacement parts, drop in rotating assemblies and complete replacement pumps to fit all sizes and modelsparts, assemblies and pumps to fit or replace existing:Worthington Flowserveparts, assemblies and pumps to fit or replace existing:Smith & Loveless* replaces MN seriesMN-horizontalMNZ-bottom suction, flex dr shaftMNF-bottom suction, HRMBMNC-combo base/elbow, HRMBMNV-combo base/elbow, flex dr shaft(not shown)* replaces MF seriescenterline voluteMFV-vertical, flex dr shaftMF-horizontal end suctionMFC-vertical , HRMB* replaces Vacuum PrimedNon-Clogsizes/models 4B2B through 8D4D(not shown)*replaces FloodedSuction, Non-Clogsizes/models 4B2 through 10D6ABBA manufactures replacement parts, drop in rotating assemblies and complete replacement pumps to fit most sizes and models.AURORA, FAIRBANKS MORSE, and VTSH are the trademarks of Pentair Flow Technologies, LLC or its affiliates. Pentair Flow Technologies, LLC has not approved, sponsored, or endorsed ABBA or its products and is not affiliated withABBA. NOTE: ALL OEM NAMES, REGISTERED TRADE MARKS, NUMBERS, SYMBOLS AND DESCRIPTIONS ARE FOR REFERENCE PURPOSES ONLY. IT IS NOT IMPLIED THAT ANY PART LISTED IS THE PRODUCT OF THEOEM. ABBA PARTS AND SERVICE IS NOT A DISTRIBUTOR OR AGENT FOR, NOR AFFILIATED IN ANY WAY WITH THE REFERENCED OEM.Ronnie Hollins(804) 334-4835r.hollins@comcast.net
- Commodity Codes
-
- NAICS 237110Water and Sewer Line and Related Structures Construction
- NAICS 237990Other Heavy and Civil Engineering Construction
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Quick Quote PW-2027-010 - Com...
Quick Quote PW-2027-010 - Compressor Maintenance Status: Open QQ 123567 Town of Purcellville
State Government of Virginia
Bid Due: 7/13/2026
RFP GMU-CM0428-26 Air Compres...
RFP GMU-CM0428-26 Air Compressor Maintenance and R... Status: Open RFP 123130 George Mason
State Government of Virginia
Bid Due: 7/21/2026