WD26003D LOCAL STREET RESURFACING PROGRAM FISCAL YEAR 2025-26 SB1 - MILL AND OVERLAY

Project Information

Bid Title
WD26003D LOCAL STREET RESURFACING PROGRAM FISCAL YEAR 2025-26 SB1 - MILL AND OVERLAY
Issuing Agency
City of Stockton
Location
California
Published Date
May 13, 2026
Closing Date
May 21, 2026
Government Level
State & Local
Status
Closed
Ref. #
WD26003D
Original Source
Join to Access Full Details
Project Description
General Information
Due Date: May 21, 2026
Opening Time: 2:00 P.M.
Published Date: April 23, 2026
Last Updated: May 13, 2026
Bid Orientation: N/A
Description: LOCAL STREET RESURFACING PROGRAM FISCAL YEAR  2025-26 SB1 - MILL AND OVERLAY, PROJECT NO. WD26003D
The project scope includes milling the existing asphalt pavement and overlaying with a new asphalt layer, installing ADA curb ramps, adjusting utilities, removing and reinstalling new striping.
N/A
Related Links
Description: URL:
Insurance Requirements link
Construction/Demolition/Recycling Plan/Report link
Local Business Preference link
Local Employment Ordinance link
Prevailing Wage Rates link
Contacts
Role: Name: Phone: Email:
Project Manager Adriana Garibay (209) 937-7298 Adriana.Garibay@stocktonca.gov
Plan Holders List Katrina Tavares (209) 937-8676 Katrina.Tavares@stocktonca.gov
Questions & Answers
Document: Questions & Answers UPDATED 5/13/2026
Document: Letter of Clarification No. 1 UPDATED 5/12/2026
Document: Letter of Clarification No. 2 UPDATED 5/13/2026
Submittals
Document:
Plan Holder's List UPDATED 5/12/2026
Document: Plan Holder's List
Notice
Document: Notice Inviting Bids
Document: Notice to Contractors UPDATED 5/13/2026
Specifications
Document: Special Provisions
Document: Bid Forms UPDATED 5/13/2026
Plans, Attachments & Agendas
Document: Instructions to Bidders
Document:

Attachment A - Street List and Quantity UPDATED 5/13/2026

Document: Attachment B - Project Map

Last Update :
Attachment Preview
DATED: May 13, 2026
QUESTIONS - ANSWERS - CLARIFICATIONS
CITY OF STOCKTON
LOCAL STREET RESURFACING PROGRAM FISCAL YEAR 2025-26 SB1 – MILL
AND OVERLAY
CITY PROJECT NO.: WD26003D
DEADLINES FOR QUESTIONS: Thursday, May 14, 2026, 3:00 p.m.
1. The bid forms only contain a line for the Base Bid Total and not a separate line for
the Bid Alternate Total, where should the total for the Bid Alternate be included?
Answer:
The basis of contract award will be the lower bidder for the Base Bid. It is the City’s
sole discretion to add, or not add, the Alternative Bid(s) to the Base Bid contract.
In the line labeled “Base Bid”, only include the total costs for bid items #1-21. For
the Bid Alternate section complete the columns labeled “Unit Price” and “Total
Price”.
2. Please review the Pavement Repair Bid Item quantity. The quantity sheet
reflects 1,080 sy, but bid item #16 reflects 2,000 sy. Please provide information on
the street location where the additional quantity will be placed.
Answer:
Please refer to LOC #2 and the revised Attachment A - Street List and Quantity
document.
3. Quality Control – A quality control program is shown in section 19 but there is no
bid item for it as in previous projects. Is there going to be a separate bid item for
quality control.
Answer:
Full compensation for conforming to the requirements of section 19 shall be
considered included in the prices paid for the various contract items of work
involved, and no additional compensation will be allowed.
City of Stockton
Public Works Department
Page 1 of 2
DATED: May 13, 2026
4. Are you going to have some kind quantity for number of repair locations for this
project.
Answer:
Refer to the revised Attachment A - Street List and Quantity document.
5. Are you going to provide a repair detail for this project specifying whether repairs
will be conducted before or after roadway milling.
Answer:
There is no repair detail for this project. Typically, pavement repairs are completed
before roadway milling.
6. Speed hump removal and replacement. Per the quantity sheet provided by the City
of Stockton it looks like the removal of the speed humps will be done with roadway
milling, can you confirm, or are the speed hump locations stand alone not within the
roadway milling areas.
Answer:
Please refer to section 9 – Payment, page 27 of the Special Provisions.
Speed Hump Removal and Replacement is paid per each. It includes removal and
disposal of existing speed hump, installation of speed hump on new pavement,
complete in place, as indicated in these special provision, specified in the Standard
Plans and Specifications, and as directed by the Engineer, and no additional
compensation will be allowed. The speed humps are located within the pavement
limits.
City of Stockton
Public Works Department
Page 2 of 2
Commodity Codes
  • NAICS 237310Highway, Street, and Bridge Construction
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.

Government Bids

Empower Your Bidding Strategy

Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.

  • Access an extensive database of bids, including comprehensive local and state opportunities.
  • Receive customized alerts for the bids that matter most to your business.
  • Explore detailed specifications to ensure precise and competitive submissions.
  • Gain a competitive edge with up-to-date information and exclusive opportunities.

See Also

EXT MOH | Sunnydale Phase 4 I...

EXT MOH | Sunnydale Phase 4 Infra (Demo & Abtmnt) Format : Sell

City and County of San Francisco

Bid Due: 7/27/2026

Galileo Academy of Science an...

Invitatin for bids: Galileo Academy of Science and Technology, Bay Street - Elevator

San Francisco Unified School District

Bid Due: 8/11/2026