Annual Contract for Tree Removal and Maintenance
Project Information
- Bid Title
- Annual Contract for Tree Removal and Maintenance
- Issuing Agency
- Mobile Water Service System(MAWSS)
- Location
- Alabama
- Published Date
- Mar 13, 2026
- Closing Date
- Apr 10, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- IFB 26-019
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Annual Contract for Tree Removal and Maintenance
-
Contract or Solicitation Number IFB 26-019
-
Solicitation Description
A Mandatory Pre-Bid Meeting will be held prior to the bid opening at 9:00 am on March 31, 2026 in the Operations Center Board room located in the East Visitor Entrance at 4725 Moffett Rd., Mobile, AL. 36618.
-
Opening Date April 10th 2026
-
Contact Corey McCoy (251) 404-2275 or cmccoy@mawss.com
-
Solicitation Document(s)
ifb-26-019-tree-removal-&-maint..pdf
-
- Attachment Preview
-
Joyce Sawyer, Buyer II(251) 694-3110 Officejasawyer@mawss.comMobile Area Water andSewer System4725 Moffett RoadMobile, AL 36618-2236PO Box 180249Mobile, AL 36618-0249INVITATION FOR BIDMarch 13, 2026INVITATION FOR BID NUMBERNAME OF BIDBIDS WILL BE RECEIVED ATMANDATORY PRE-BID MEETINGIFB 26-019Annual Contract for Tree Removal and MaintenanceMAWSS Bid BoxEast Visitor Entrance4725 Moffett RoadMobile, AL 36618If sending bids by UPS/Fed Ex, deliver to the Warehouse:1610 Shelton Beach Rd. Ext., Mobile, AL 366189:00 am on March 31, 2026 in the Board Room located at 4725 Moffett RoadBID OPENING DATEApril 10, 2026BID OPENING TIME10:30 am Central TimeAWARD WILL BE MADE BYTotal CostCONTRACT PERIODMATERIAL DELIVERED TOADDITIONAL INFORMATION CONTACT5/1/26 through 4/30/27 with two possible 1-year extension optionsMAWSS Easement Maintenance Dept1610 Shelton Beach Road Ext.Mobile, AL 36618Corey McCoy (251) 404-2275 or cmccoy@mawss.comAPPLICABLE SDP POLICY17-01Sealed bids must be in the Purchasing Department no later than the time specified in order to be considered. Submissionsreceived after the deadline will not be considered. Envelopes must bear the name of the supplier, company address and thewords “IFB 26-019 Tree Removal & Maintenance” or “IFB 26-019 NO QUOTE.” Facsimile or email bids will not be accepted.All bids must be submitted on the attached forms or your bid will be disqualified. Bidder shall furnish all the informationrequired by the solicitation. The bidder’s name must be typed or printed on the bid sheet and signed by the bidder orappropriate authorized executive officer of the bidder’s company. Bidders must initial any changes or erasures. Bidders shouldretain a copy of bids for their records.Bidders shall acknowledge receipt of all addenda to this solicitation by signing and returning each addendum or by identifyingthe addendum number and the date on the bid form. Failure to acknowledge receipt of any addendum by a bidder will resultin rejection of the bid if MAWSS determines that the addendum contains information that materially changes the requirements.All bids shall be quoted FOB Destination, freight prepaid with no additional charges. Unless otherwise specified in the bid, allprices will be on a firm-fixed price basis and are not subject to adjustments based on costs incurred. MAWSS reserves the rightto reject any or all bids submitted, to waive any informality in any bid or in the bid process, or to terminate the bid process atany time, if deemed by MAWSS to be in MAWSS’s best interest.A Purchase Order and this “Invitation for Bid” with “Specifications,” “Conditions,” “Bid Form,” signed by the successful bidder’sauthorized representative, and all attached drawings and other documents furnished by MAWSS to the bidders with theInvitation for Bid in order to illustrate the contract requirements, will constitute a contract for the goods and/or services to bepurchased.IFB 26-019 Tree Removal & Maintenance – Annual ContractPage 1 of 16IFB 26-019 TREE REMOVAL & MAINTENANCECONDITIONSThe Board of Water and Sewer Commissioners of the City of Mobile will accept bids for Tree Removal & Maintenance AnnualContract in our Purchasing Department Bid Box located at the East Visitor Entrance at 4725 Moffett Road, Mobile, AL. 36618no later than 10:30 a.m. local time on April 10, 2026. Bids will be opened immediately after bid closing time in the OperationsCenter Board room located at the East Visitor Entrance. Award will be by Total Cost. The bidder offers and agrees, if this bidis accepted, to furnish the items as defined in the specifications for the unit price set opposite each item. Pricing shall be FOBMobile, Alabama. All items shall be delivered to our Easement Maintenance Dept. located at 1610 Shelton Beach Road Ext. orto the job site as needed.A Mandatory Pre-Bid Meeting will be held between representatives of Contractor and representatives of MAWSS prior to thebid opening. The pre-bid meeting is scheduled for 9:00 am on March 31, 2026 in the Operations Center Board room locatedat the East Visitor Entrance at 4725 Moffett Road, Mobile, AL. 36618.A General Contractor’s license is required if the total bid amount is over $100,000. In addition, the bidders would be requiredto possess a minimum of MU-s: ROW Maintenance or SC: ROW. Please include copy of license.Bidder understands that his/her bid shall be good and may not be withdrawn for a period of sixty (60) calendar days after thescheduled closing time for receiving bids.There are no guaranteed quantities of tree services that will be purchased for this contract. Bidder understands and agreesthat quantities will be purchased by MAWSS on an “as needed” basis. MAWSS shall not be committed to the purchase of apre-established minimum quantity for any one item.A bidder may not modify its bid after bid opening. Errors in the extension of unit prices stated in a bid or in multiplication,division, addition or subtraction in a bid may be corrected by the MAWSS Purchasing Buyer prior to award. In such cases, unitprices shall not be changed.It is the responsibility of the bidder to determine prior to the bid opening whether any amendment, additions, deletions orchanges of any type have been made to this Invitation for Bid, Conditions, Specifications, Bid Form or any other bid documents.Bid documents and any amendments made to this bid will be posted on our website at www.mawss.com.A copy of the SDP (Supplier Diversity Program) policy that applies to this Invitation For Bid can be furnished upon request. It is theresponsibility of the bidder to read and make efforts to meet the goals of this policy. Please contact the Supplier Diversity Department atsupplier.diversity@mawss.com for any questions regarding ths policy. Bidders MUST acknowledge receipt of this policy by submitting theSDP Policy Acknowledgement and the Subcontracting Plan/Good Faith Effort form with the bid proposal, regardless if using a DiverseContractor/Supplier or not. Contractors are required to use Contractors/Suppliers only in the areas for which the Contractors/Suppliers arecertified.Invoicing Requirements: MAWSS requires additional information for all work performed and services provided. On the vendor’sinvoice for payment should be a detailed listing of work performed, services provided, dates completed, locations involved,and any other pertinent information needed to verify the work and/or services were completed in accordance to the bid specs.This additional information can be supplied in the form of detailed invoices, work orders, checklists or any other documentsused to track the work performed or services provided but details must be included on the actual invoice. A copy of the invoiceand these additional details must be sent to the “ADDITIONAL INFORMATION CONTACT” found on Page 1 of the bid documentsand a copy emailed to Accounts Payable at AcctsPayable@mawss.com.END OF CONDITIONSIFB 26-019 Tree Removal & Maintenance – Annual ContractPage 2 of 16IFB 26-019 TREE REMOVAL & MAINTENANCEGENERAL SPECIFICATIONS• Contractors submitting bids must have all the applicable City, County, and State Licenses. A General Contractor’slicense is required if the total bid amount is over $100,000. In addition, the bidders would be required to possess aminimum of MU-s: ROW Maintenance or SC: ROW. Please include copy of license.• All bid requirements listed in the Board of Water and Sewer Commissioners Standard Specifications must be compliedwith.• The completed bid forms must be submitted in a sealed envelope to the Purchasing Department located at 4725Moffett Road, Mobile, Alabama. The envelope should be clearly marked, “IFB 26-019 TREE REMOVAL ANDMAINTENANCE”.• The Board of Water and Sewer Commissioners of the City of Mobile retain the right to reject any and all bids.• Bids will be considered only from Contractors with experience in related type work with a proven record of customersatisfaction. The bidder must submit, as part of the bid document, a list of at least four (4) customers where similarwork has been performed within the last two (2) years. The following information must be included:1. Name and address of customer2. Contact Person and telephone number3. Description of work performedThe bidder shall have adequate personnel to complete the required work in the time allowed by Mobile Area Water& Sewer System as well as the proper equipment, or access to, including but not limited to, a bucket truck, a stumpgrinding machine, and a tree climber.• All field personnel working on this project shall wear company ID Badges or uniforms displaying the company name.All vehicles used by the Contractor shall have a sign or logo displayed on the outside of the vehicle.• The bidder shall have a designated on-site Safety Officer who will be responsible for ensuring that all aspects of thisproject are conducted in a safe manner.• The bidder shall provide an emergency telephone number where a company representative can be reached twenty-four hours a day for the duration of the contract.• No work shall be permitted on Saturday, Sunday, or Holidays unless approved in advance by MAWSS. Work will beperformed from 7 a.m. to 7 p.m. during Daylight Savings Time and 7 a.m. to 5 p.m. during Standard Time.• During the routine course of work by the Contractor’s personnel, should they encounter a manhole overflow or seeevidence of recent sewer overflow at a manhole or encounter a sewer overflow from a broken Sewer Line, thisinformation should be reported immediately to the MAWSS project representative. Also, the Contractor is to reportany wash-out or water line problem immediately to the MAWSS Project representative.• Site visitation to review the locations of the work is encouraged and can be arranged by contacting MAWSSEasement/ROW Maintenance Supervisor, Corey McCoy, at (251) 404-2275.• Background checks will be done on successful bidders.• After awarding this bid, but prior to any work being performed, a mandatory preconstruction meeting will be heldbetween the bidder and representatives of the Mobile Area Water & Sewer System. The purpose of the meeting willbe to review all matters concerning the project.IFB 26-019 Tree Removal & Maintenance – Annual ContractPage 3 of 16IFB 26-019 TREE REMOVAL & MAINTENANCEGENERAL SPECIFICATIONS (Cont’d)• Contractor agrees to pay and satisfy all claims arising from the work performed for Board under this contract andagrees to permit no liens of any kind to be filed by the Contractor’s subcontractors, laborers, mechanics, furnisher ofsupplies, machinery, equipment, or other persons who may be entitled to file a lien against the property. Contractoragrees to protect Board from all claims and liens and indemnify Board for any costs incurred with any claims and liens.In the event that a lien or claim may be recorded against the property, then all costs, including attorney’s fees andexpenses, incurred by Board, in defending, removing, and satisfying the lien or claim, shall be at the expense ofContractor. The cost may be paid by Board by using funds due Contractor.• Contractor shall indemnify Board and hold Board harmless from all liability for death or injury to the Contractor’sofficers, agents, representatives, or employees, any subcontractors or agents, representatives, or employees of anysubcontractors, invitees, third parties of any nature whatsoever, or employees of third parties, occurring or arising outof the work performed, unless such claim arises from the sole negligence of Board. This responsibility shall include,but not limited to, injuries or death caused in whole or part by any machinery, materials, or equipment belonging toBoard used by Contractor in the performance of the work. Contractor shall indemnify and hold Board harmless fromdamage to any property, including Board’s property, arising out of work performed, Contractor shall pay all costs,including but not limited to interest and attorney’s fees, incurred by Board in defending the litigation.• Contractor shall comply with all applicable federal, state, municipal, and local laws, and executive order, and allapplicable rules, orders, regulations, and requirements of all governmental agencies, departments, or bureaus.Nothing contained herein shall prevent Contractor from contesting with the appropriate governmental body thevalidity of such law, rule, order, regulation, or requirement that Contractor has not complied therewith. Contractorshall furnish Board with proof of its compliance with the aforesaid laws, rules, orders, regulations or requirements asBoard may reasonably request. Contractor shall indemnify and hold Board harmless from all loss, costs, expenses,fines, penalties, and damage resulting in any way from Contractor’s failure or neglect to comply with the provisions ofthe Article.• During the progress of the work, if Contractor should become bankrupt, refuse or neglect to supply a sufficiency ofmaterial or of workmen, or cause any unreasonable neglect or suspension of work or fail to refuse to follow the plansand specifications or fail to comply with any part of this Contract, Board shall have the right to take possession of thepremises and immediately terminate the Contract. All claims of Contractor shall cease, and Board shall complete thework after giving forty-eight (48) hours’ notice directed to contractor at the address stated in this Contract.• The cost of completing the work and all expenses including but not limited to attorney’s fees, incident to this Contractshall be borne by Contractor, and Board reserves the right to seek reimbursement from Contractor for all such costsand expenses. Board shall not be liable to Contractor in any way for the manner in which the work was completed.Board’s action in completing the work shall not be construed as a substitute or a waiver of any legal rights Board hasagainst Contractor.• In the event that the Board must undertake litigation for breach of this agreement, Contractor will pay all attorney’sfees, expenses, and costs incurred by Board in filing suit or otherwise attempting to enforce this agreement. In theevent Board is sued, upon any claim or lien arising out of the work, Contractor shall pay all costs and expenses,including but not limited to attorney fees and interest, incurred by Board in defending the litigation, unless such claimarises from the sole negligence of Board.• Contractor shall purchase and maintain during the life of the Contract, Statutory Workman’s Compensation asrequired by the Workman’s Compensation Law of the State of Alabama for all employees involved with this work andEmployer’s Liability Insurance. Each subcontractor shall similarly provide coverage for its employees. A Certificate ofIssuance stating coverage must be filed with Board prior to start of work.IFB 26-019 Tree Removal & Maintenance – Annual ContractPage 4 of 16IFB 26-019 TREE REMOVAL & MAINTENANCEGENERAL SPECIFICATIONS (Cont’d)• Contractor shall secure and maintain insurance providing protection from claims for personal injury, including death,property damage or destruction, including any loss of use resulting there from, and claims which relate to, result from,arise out of, or are connected with the negligent performance of services, products, or equipment, which are providedpursuant to this agreement. Contractor shall carry during the term of this agreement, and until after the completionof removal of equipment, comprehensive general liability insurance with a commercial general liability endorsementhaving a minimum limit of liability of $500,000.00, with a combined limit for bodily injury (including loss of life) and/orproperty damage for any one occurrence, and excess/umbrella coverage in the amount of at least $1,000,000.00.Contractor shall name Board as an additional insured under its liability policies and shall require its insurancecompanies to give at least 30 days’ written notice of termination or cancellation of policies to Board. Certificates ofsuch insurance shall be delivered to Board prior to commencement of the Work. All insurance required by this sectionmust be placed with insurance companies authorized to do business in the State of Alabama.• This Contract merges and supersedes all prior representations and agreements between Owner and Contractor andconstitutes the entire contract between them concerning the work. This contract may not be modified or amendedexcept by written agreement of both parties.• All notices required to be sent under the terms of this contract, or otherwise sent in connection with the Work, shallbe sent to the parties by certified or registered mail at the address listed below, or to such other addresses as theparties may from time to time designate in writing.Board Contact Person: Bud McCrory, Director, P.O. Box 180249, Mobile, Alabama, 36618-2236Contractor Contact Person: Corey McCoy• No additional compensation or money shall be due by Board to Contractor for extra work or expenses, unless a priorestimate has been submitted by Contractor and Board has previously accepted, in writing, the estimate, and issued aPurchase Order number agreeing in writing to pay same.• The parties agree that all services performed pursuant to this agreement are performed by Contractor as anindependent contractor, and Contractor and its employees will not be considered employees of Board for any purpose.It is understood that Contractor is not nor will be an agent or an employee of the Board in any respect.• This contract and all terms thereof shall be construed in accordance with the laws of the State of Alabama.• NOTE: Once the contract is awarded, the Contractor is responsible for coordinating the scheduled work withMAWSS’ Easement/ROW Maintenance Supervisor.• Two (2) copies of pay estimates for work completed may be submitted at the end of each month. An INVOICE shouldbe emailed to acctspayable@mawss.com, and a RECEIPT should be emailed to cmccoy@mawss.com, or mailed toCorey McCoy, MAWSS, 4725 Moffett Road, Mobile, AL 36618. All work itemized on the pay estimate must becompleted and inspected before payment is approved.END OF GENERAL SPECIFICATIONSIFB 26-019 Tree Removal & Maintenance – Annual ContractPage 5 of 16
- Commodity Codes
-
- NAICS 561730Landscaping Services
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
ENGR-North Al.- Remove Tree a...
Sourcing Project Number: SRC0000034400 Solicitation Label: ENGR-North Al.- Remove Tree and Grind Stump
State Government of Alabama
Bid Due: 7/07/2026
ENGR-Hamilton - Tree Removal ...
Sourcing Project Number: SRC0000034438 Solicitation Label: ENGR-Hamilton - Tree Removal Service Status: Open
State Government of Alabama
Bid Due: 7/10/2026