Request for Proposal -Kenneth Avenue, Boyd, Melvin, & Vale Dr Transmission Line Replacement Project
Project Information
- Bid Title
- Request for Proposal -Kenneth Avenue, Boyd, Melvin, & Vale Dr Transmission Line Replacement Project
- Issuing Agency
- Carmichael Water District
- Location
- California
- Published Date
- Nov 19, 2025
- Closing Date
- Dec 23, 2025
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Title: Request for Proposal -Kenneth Avenue, Boyd, Melvin, & Vale Dr Transmission Line Replacement Project
Category: Water Line Project Status: Open Bid Recipient: gregn@carmichaelwd.org; engineering@carmichaelwd.org Description: General Information: The Carmichael Water District (District) is an Irrigation District, founded in 1916, operating under the State of California Water Code. The District provides domestic water to an estimated service area population of 37,897 customers via approximately 11,800 water service connections in Sacramento County.
The Carmichael Water District Garfield Transmission Line Replacement Project is within Carmichael, CA. The project includes a section of water transmission line on Kenneth Avenue at Carmichael Way, Boyd and Melvin Drives, and Vale Drive. Along Kenneth Avenue and Carmichael Way approximately 2,700-feet of new ductile iron pipe will be installed. As well as, 4 new fire hydrant installations, 32 metered service reconnections, and 3 tie-in connections to the existing water system. The Boyd and Melvin Drives portion includes approximately 1200-feet of new ductile iron water main. This portion also includes 47 metered service reconnections, 2 new fire hydrant installations, and 2 tie-in connections to the existing water system. The Vale Drive portion will include about 1000-feet of new DIP, 23 metered service reconnections, and 1 new fire hydrant.
Purpose of RFP:The purpose of this Request for Proposal (RFP) is for the District to retain professional engineering services for water line replacement projects as described in the scope of services.
Proposals will be reviewed and chosen based on the criteria described in the RFP. The District reserves the right to reject any or all proposals, and select a proposal in the best interests of the District. If a Professional Services Agreement is to be awarded, the District will award the Agreement to the firm selected by the Carmichael Water District review committee.
Proposals addressed to Carmichael Water District Attention Greg Norris, Engineering Manager will be received at the Carmichael Water District, 7837 Fair Oaks Boulevard, Carmichael, California 95608 on Tuesday, December 23, 2025 until 12:00 p.m. Proposals received after 12:00 p.m. will not be accepted and will be returned unopened.
See RFP PDF for project details and requirements.Publication Date/Time: 11/19/2025 12:00 AM Closing Date/Time: 12/23/2025 12:00 PM Submittal Information: See RFP PDF Contact Person: Greg Norris, Engineering Manager
7837 Fair Oaks Blvd,
Carmichael, CA 95608
(916) 483-2452Related Documents: Request For Proposal - Garfield Transmission Line Replacement Project
Public Notice to Contractors - Garfield Ave Transmission Line Replacement Project
RFP - Garfield Ave TLRP Addendum No. 1
CWD-Garfield Ave TRP RFP Addendum 2
CWD-Garfield Ave TRP RFP Addendum No. 3 rev
CWD-Public_Notice_to_Contractors-Kenneth_Ave_TRP
RFP - Kenneth Ave, Melvin, Boyd, Vale Dr TLR Design
- Attachment Preview
-
CARMICHAEL WATER DISTRICTREQUEST FOR PROPOSALDESIGN FOR THE GARFIELD AVENUE TRANSMISSION LINE REPLACEMENTPROJECT1) GENERAL INFORMATIONThe Carmichael Water District (District) is an Irrigation District, founded in 1916,operating under the State of California Water Code. The District provides domesticwater to an estimated service area population of 41,193 customers via approximately11,757 water service connections in Sacramento County.2) PURPOSE OF RFPThe purpose of this Request for Proposal (RFP) is for the District to retain professionalengineering services for water line replacement projects as described in the scope ofservices.3) SCOPE OF SERVICESa) Project Management and Administrationi) This service will include project management activities including monthlyinvoicing, project status updates, meetings, and design review at 60%, 90%,100%, specifications review, and additional completion milestones.ii) This service will also include quality assurance/quality control of the workproducts and submittals from the Consultant.b) Surveyingi) Perform in-field topographic survey of all existing surface features, gravitystructures, and visible utilities over the Sacramento County right-of-way.ii) Perform record research to locate recorded maps, utility easements, surveys,monumentation, and other records as necessary to determine parcel lineswithin the project.iii) As needed at the request of the District, Consultant will coordinate with theirSurveying sub-consultant and property owners of the project to provide thepreliminary title reports (PTRs), easement exhibits, plats, and legaldescriptions for potential easement acquisitions on the District’s behalf asneeded.c) Design Servicesi) Utility Coordination – Consultant to prepare and distribute utilitycoordination letters to all known utility companies within the Project area fornotification and to identify potential conflicts. This should be done at thebeginning of the design phase. Consultant will discuss any conflicts with therespective utility and design relocations and realignments to address theconflicts.Request For ProposalDesign Services for The Garfield Avenue Transmission Line Replacement ProjectPage 1ii) Field Investigation and Potholing – Consultant to provide a detailed utility listand map following the 60% design submittal of potential utility conflicts. TheConsultant will identify, prepare, coordinate with, and submit documentation(with the District’s approval and signature) to all relevant agencies to acquirethe necessary pothole permits and approvals to perform the project work. TheDistrict will be responsible for the associated fees.iii) The District will perform in-field potholing of the conflicts and provide theConsultant with the data to refine the 90% and final design submittal.iv) Consultant to provide 60%, 90%, and final (100%) design drawings.Drawings are to be plotted at a scale of 1” = 40’ horizontal, and 1”= 4’ verticalplan and profiles and appropriately scaled details. Drawings are to include,but not limited to:(1) Project Cover Page with Signature block for District(2) Abbreviations, Symbols, and General Notes(3) Abandonment Plan(4) Metered Services List and Reconnection Notes(5) Pavement Restoration Limits(6) Plan and Profile Sheets with detailing State Water Resources ControlBoard (Division of Drinking Water) Separation Waiver Conditions(7) District Standard Details(8) Tie-In Details(9) Other Project Specific Detailsv) Technical Specifications – Consultant will utilize the District’s standards andamend to provide specific project details and any additional technicalspecifications and special provisions not already covered and compile, alongwith plans and contractor forms, into the Contract Documents for bidding theproject.vi) Consultant will develop and provide engineer cost estimates at the 60%, 90%,and final design completion levels.vii) Consultant’s deliverables for Design Services include, but are not limited to:(1) At 60% Submittal – Electronic PDF version of half-sized sets of plans(11x17), , Electronic PDF version of Engineer’s Opinion of ProbableConstruction Cost (EOPCC), Electronic PDF version of half-sizedplans for Field Investigative Potholing (if requested by District)(2) At 90% Submittal –Electronic PDF version of half-sized sets of plans(11x17), , Electronic PDF version of Engineer’s Opinion of ProbableConstruction Cost (EOPCC), and -Electronic PDF version ofspecifications(3) At 100% Submittal –Electronic PDF version (stamped) set of plans,Electronic PDF version of Engineer’s Opinion of ProbableConstruction Cost (EOPCC), and specificationsd) Permitting, Coordination, and Environmental Documentationi) Consultant will identify, prepare, coordinate with, and submit documentation(with the District’s approval and signature) to all relevant agencies to acquireRequest For ProposalDesign Services for The Garfield Avenue Transmission Line Replacement ProjectPage 2the necessary permits and approvals to perform the project work. The Districtwill be responsible for the associated fees.ii) The typical associated agencies are, but not limited to:(1) Sacramento County Encroachment Permit (Investigative Pot Holing)(2) Sacramento Dept of Transportation (Traffic Control Plans)(3) State Water Resources Control Board (Division of Drinking Water)(4) Sacramento Metro Fire District Coordinationiii) Environmental Documentation – Provided the District pursues and requiresan Initial Study/Mitigated Negative Declaration, the Consultant will work andcoordinate with the District’s environmental firm, to develop and submit forapproval the necessary environmental documentation. For Projects that areCategorically Exempt, the District will file the CEQA Exemption.iv) Consultant will work with the District to prepare exhibits and/or memos tofacilitate design and construction of the project. These exhibits and memosare used for resolving issues, clarifications, or negotiating with other entities(County, private property owners, or otherwise).e) Bidding Servicesi) Consultant will coordinate with plan clearing houses for printing anddistribution of project plans, specifications, addenda, etc.ii) Consultant will conduct pre-bid meeting with site visit for prospectivecontractors and coordinate with the District on the date, location, and topicsdiscussed for the meeting.iii) Addendum – Consultant will prepare any addenda per District direction andwill coordinate with plan clearing houses for posting.iv) Conformed Plans and Specifications – Consultant will prepare conformedplans and specifications incorporating all addenda, and inquiries during thebidding period, and provide District with three (3) full sized (ANSI D 22 x 34inches) set of plans, and electronic PDF version of the complete set ofconformed plans and specifications following the bid open.v) Consultant will conduct bid opening with prospective contractors andcoordinate with the District on the date, and location.vi) Consultant will review the submitted bids for completeness andresponsiveness, check all references, and provide the District an Engineer’sRecommendation for Award.f) Engineering Services During Constructioni) Consultant will review submittals (Typical 20 submittals) and resubmittals.(Typical 5 resubmittals).ii) Consultant will review and respond to RFIs. (Typical 3 RFIs)iii) In-Field Construction Meetings (Typical 3).Request For ProposalDesign Services for The Garfield Avenue Transmission Line Replacement ProjectPage 3iv) Consultant will prepare and work with the District on design changes,exhibits, and submittals during construction due to in-field conflicts or changeorder conflicts.v) Consultant will review change orders and provide recommendations to theDistrict.vi) Consultant will review and prepare as-built record drawings based on theDistrict’s field records. Consultant will deliver to the District the as-builtdrawings in both PDF and CAD files.vii) Consultant will review the District prepared construction documentation inaccordance with the State Water Resources Control Board waiver conditions,verification forms, and provide letter acknowledging compliance with StateWater Resources Control Board waiver conditions.4) MINIMUM PROPOSAL REQUIREMENTThe proposal should provide a straight forward, concise description of your firm’scapabilities to satisfy the requirements of this project. The proposal shall include thefollowing minimum information.a) Title Pagei) Show the RFP subject, name of the firm, local address, telephone number,email of a contact person and date of the proposal.b) Table of Contentsi) The table of contents of the proposal should include a clear and completeidentification of the materials submitted by section and page number:c) Transmittal Letteri) Please limit the transmittal letter to one page and include the followinginformation:(1) A brief statement of understanding of the scope of services to beperformed.(2) A commitment to perform the services within the time periodspecified within the proposal.(3) The name of the persons authorized to represent the proposing firm,their title, address, and telephone number.d) Introductioni) The proposal shall contain an introductory description of the scope of workand an overview of your firm’s understanding of the services to be provided.e) Qualificationsi) The proposal shall provide the information described in Section 5) of theRequest for Proposal (RFP) entitled “Consultant Team Qualifications andReferences” as listed below.Request For ProposalDesign Services for The Garfield Avenue Transmission Line Replacement ProjectPage 4f) Scope of Servicesi) Provide, in detail, your approach to accomplish this work as described inSection 3) of this RFP entitled “Scope of Services”.g) Proposal Endorsementi) The proposal shall contain a statement that the firm has the capability andavailable resources to perform the work. The statement shall also indicatethat the proposal is valid for 90 days and shall be signed by an officerauthorized to bind the firm to the statement.h) Example of Similar Worki) Submit a sample of Documents prepared by the team members in your firmwho will be assigned to this project, of similar projects completed within thelast five years within the state of California.i) Project Costsi) Provide estimated team project hours by individual, cost, schedule, and billingrate schedule for the project team.5) CONSULTANT TEAM QUALIFICATIONS AND REFERENCESa) Name and type of firm, address, telephone and email addresses.b) Experience and qualifications of firm in performing similar Mainline Design.i) Location and year firm was established.ii) Names of principal-in-charge and their experience.iii) Experience and names of key personnel to be assigned to this project andlength of employment with the firm.iv) Hourly billing rate for all personnel to be assigned to the project.c) Demonstration of ability to complete similar projects on schedule and withinbudget.d) Show original budgets and deadlines, as well as final project fees and completiondates for referenced projects.e) Provide a description of in-house quality control assurance program that will beapplied to this project. Identify senior staff that will perform quality control andquality assurance reviews.f) Provide the following information from three references associated with similarprojects your firm completed within the last five years.i) Project titleii) Date of project completioniii) Name of agency or firm and mail addressRequest For ProposalDesign Services for The Garfield Avenue Transmission Line Replacement ProjectPage 5
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
- NAICS 237110Water and Sewer Line and Related Structures Construction
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Follow Castle Creek Bridge Repair Active Contract Opportunity Notice ID 127EAW26Q0039 Related Notice
AGRICULTURE, DEPARTMENT OF
Bid Due: 7/08/2026
Pavement repair, drainage, MG...
Pavement repair, drainage, MGS, Mod lighting systems and TMS.Details Event ID 04-1W7104 Format/Type:
State Government of California
Bid Due: 8/04/2026