Spanish Fort Center Pickleball Complex Addendum 1
Project Information
- Bid Title
- Spanish Fort Center Pickleball Complex Addendum 1
- Issuing Agency
- Spanish Fort city
- Location
- Alabama
- Published Date
- Jan 15, 2025
- Closing Date
- Jan 16, 2025
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
The City of Spanish Fort has the following open bids:
?
Spanish Fort Center Pickleball Complex Addendum 1
January 14, 2025
Addendum #1
To: All Bidders
From: Nick Combs
Date: January 14, 2025
RE: Spanish Fort Center Pickleball Complex
GeneralA copy of the following addendum can be found by clicking here .
? The project shall be completed in 120 calendar days following a 15 day Notice to Proceed Period.
? Contractor shall coordinate with the City of Spanish Fort to relocate exercise equipment from
within the project footprint.
? Access to the park shall be maintained at all times.
? Contractor shall coordinate court surface color options with the City and Engineer prior to
placement.
? The contractor shall be responsible for repairing/replacing any damaged asphalt and/or concrete
within the staging area and/or along the haul route.
? This project is being re-bid in an effort to reduce construction costs and includes the following
revisions from the originally bid project plans and specifications:
o Asphalt base replaced Post-Tension Concrete Slab
o Acrytech Standard Sport Surfacing System for asphalt courts required in lieu of
Picklemaster Five Layer Cushion System.
o The new fence heights are 8’ and 4’
o Reduced tables and seating
o Revised the Shade Sail Structure
? Superior Shade, back-to-back square cantilever umbrella shade, is approved as an alternate to
USA- Shade product specified.
? Putterman Net Posts and netting will be allowed as a substitute
? Ball Fabrics: Extreme Windscreen will be allowed as a substitute
? Light Pole Depot Direct Burial Pole will be allowed as a substitute
? Medina Power ARL LED Area Light will be allowed as a substitute
? RAB Bullhorn Bracket will be allowed as a substitute
? RAB LED luminaire A17-3T375 will be allowed as a substitute
? RAB Lighting PTR6-07-20WT light pole will be allowed as a substitute
? The Instructions to Bidders Article 8: Bid Security Section 8.01 is hereby amended as follows: A
Bid must be accompanied by Bid security made payable to Owner in an amount of 5 percent of
Bidder’s maximum Bid price (determined by adding the base bid and all alternates), but in no
event exceeding $10,000, and in the form of a certified check, bank money order, or a Bid bond
(on the form included in the Bidding Documents) issued by a surety meeting the requirements
of Paragraphs 6.01 and 6.02 of the General Conditions.RFI Response Log
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
117th ARW Alert Pad Crack Rep...
Follow 117th ARW Alert Pad Crack Repairs Active Contract Opportunity Notice ID W50S6M26QA013
DEPT OF DEFENSE
Bid Due: 7/30/2026
27-30" Maintenance Dredging w...
Follow 27-30" Maintenance Dredging within the Geographical Boundaries of USACE Mobile District Active
DEPT OF DEFENSE
Bid Due: 7/09/2026