- Project Description
-
The City of Spanish Fort has the following open bids:
?
Spanish Fort Center Pickleball Complex Addendum 1
January 14, 2025
Addendum #1
To: All Bidders
From: Nick Combs
Date: January 14, 2025
RE: Spanish Fort Center Pickleball Complex
GeneralA copy of the following addendum can be found by clicking here .
? The project shall be completed in 120 calendar days following a 15 day Notice to Proceed Period.
? Contractor shall coordinate with the City of Spanish Fort to relocate exercise equipment from
within the project footprint.
? Access to the park shall be maintained at all times.
? Contractor shall coordinate court surface color options with the City and Engineer prior to
placement.
? The contractor shall be responsible for repairing/replacing any damaged asphalt and/or concrete
within the staging area and/or along the haul route.
? This project is being re-bid in an effort to reduce construction costs and includes the following
revisions from the originally bid project plans and specifications:
o Asphalt base replaced Post-Tension Concrete Slab
o Acrytech Standard Sport Surfacing System for asphalt courts required in lieu of
Picklemaster Five Layer Cushion System.
o The new fence heights are 8’ and 4’
o Reduced tables and seating
o Revised the Shade Sail Structure
? Superior Shade, back-to-back square cantilever umbrella shade, is approved as an alternate to
USA- Shade product specified.
? Putterman Net Posts and netting will be allowed as a substitute
? Ball Fabrics: Extreme Windscreen will be allowed as a substitute
? Light Pole Depot Direct Burial Pole will be allowed as a substitute
? Medina Power ARL LED Area Light will be allowed as a substitute
? RAB Bullhorn Bracket will be allowed as a substitute
? RAB LED luminaire A17-3T375 will be allowed as a substitute
? RAB Lighting PTR6-07-20WT light pole will be allowed as a substitute
? The Instructions to Bidders Article 8: Bid Security Section 8.01 is hereby amended as follows: A
Bid must be accompanied by Bid security made payable to Owner in an amount of 5 percent of
Bidder’s maximum Bid price (determined by adding the base bid and all alternates), but in no
event exceeding $10,000, and in the form of a certified check, bank money order, or a Bid bond
(on the form included in the Bidding Documents) issued by a surety meeting the requirements
of Paragraphs 6.01 and 6.02 of the General Conditions.RFI Response Log
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Design and Construction Servi...
Follow Design and Construction Services for the FY26 National Roofing Program (NRP) Project
DEPT OF DEFENSE
Bid Due: 8/26/2026
RFP - Fort Bathroom Improvements
RFP - Fort Bathroom Improvements REQUEST FOR BID Sealed Bids will be received
town of Dauphin Island
Bid Due: 9/08/2026