HVAC Equipment Renovation
Project Information
- Bid Title
- HVAC Equipment Renovation
- Issuing Agency
- Guilford County Schools
- Location
- North Carolina
- Published Date
- Mar 20, 2026
- Closing Date
- Mar 26, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- 6816
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
QuoteID Description Bids Closed Scope of Work 6816HVAC Equipment Renovation Southwest Guilford High School HVAC Equipment Renovation03/26/2026 - Attachment Preview
-
PROJECT NAME:MEETING TYPE:DATE:SOUTHWEST GUILFORD HIGH SCHOOL GYMHVAC RENOVATION #6816PRE-BID MEETING MINUTES-ADDENDUM #1MARCH 17, 20261) Introductions2) Single Prime Project: Mechanical3) Sign-In Sheet: Must sign in before you leave. (the sign-in sheet will be included with addendum)4) MWBE Participation: Documentation of participation and Good Faith Effort is required with the bid.Documents are included in the bid package. MWBE Goal 12.46%5) Conduct/Safety: Professional conduct required. No firearms, weapons, drugs, alcohol, tobaccoproducts, e-cigarettes, etc. Prime contractor shall have background check of all people to access thesite and confirm they are not registered sex offender. Contractor shall store this information and beable to provide to the Owner upon request.6) Owner Special Events/Needs: Must coordinate with staff 3 days in advance: possible events requiringparking lot, drives, etc.7) Schedule:• BID RECIEVING: Sealed Bids will be received by the Guilford County School System until 2:00PM on March 26th, 2026 at 714 Green Valley Road, Greensboro, NC 27408, Room 2A.o Allow extra time for Parking and Check-In,NO BIDS ACCEPTED AFTER 2PM• Sales Tax – Include in bid- must submit monthly sales tax forms.• 5% Bid Bond Required.• 100% Performance, Labor and Material Payment Bonds• Insurance-Required.• Contingency Allowance: $25,000• Transformer Allowance: $30,000• INCLUDE $30,000.00 IN THE BASE BID FOR TRANSFORMER REWORK ASDETERMINED BY UTILITY PROVIDER. THE OWNER AND/OR ENGINEERWILL PROVIDE WRITTEN APPROVAL TO USE ANY ALLOWANCE FUNDS. ACHANGE ORDER WILL BE ISSUED FOR THE USE OF AND/OR CREDITCHANGE ORDER WILL BE ISSUED FOR RETURN OF UNUSED FUNDS TO THEOWNER. CONTRACTORS FAILING TO HAVE WRITTEN AUTHORIZATIONFROM THE OWNER AND/OR ENGINEER FOR THE USE OF ALLOWANCEFUNDS PRIOR TO BEGINNING THE ADDITIONAL WORK COULD RESULT INTHE USE OF THE ALLOWANCE FUNDS NOT BEING APPROVED.• ALL unused (approved) funds shall be returned to Owner by change order credit- Owner/Engmust approve in writing.• Bid Alternates:o Project will have 2 alternates as follows:MECHANICAL ALTERNATE - M1 -ADDPROVIDE A PRICE FOR THE INCLUSION OF ALL WORK ASSOCIATED WITH THEREMOVAL AND REPLACEMENT OF PACKAGE ROOFTOP UNITS RTU-2(E) AND RTU-3(E). INCLUDE ALL PORTIONS OF WORK ASSOCIATED WITH REMOVAL ANDREPLACEMENT OF RTU-2(E) AND RTU-3(E).MECHANCIAL ALTERNATE - M2 -ADDPROVIDE A PRICE FOR THE INCLUSION OF ALL WORK ASSOCIATED WITH THEREMOVAL AND REPLACEMENT OF PACKAGE ROOFTOP UNITS RTU-5(E)/ERV-5(E)AND RTU-6(E)/ERV-6(E). INCLUDE ALL PORTIONS OF WORK ASSOCIATED WITHREMOVAL AND REPLACEMENT OF RTU-5(E)/ERV-5(E) AND RTU-6(E)/ERV-6(E).• Notice To Proceed- After Board of Ed Meeting, if approved.• April Meeting (4-14-26)• All equipment must be fully operational by August 1st 2026 and project completeby August 15th 2026. Note: If system cannot be operational by August 15th 2026due to equipment lead time, submit schedule to the owner for review and approval.• (if required by schedule) During the Summer Break of 2026, the facility maybe operated with only four (4) industrial portable dehumidifiers (seespecifications below).• (if required by schedule) Four (4) industrial portable dehumidifiers shall beprovided and placed within the Gym/facility during construction.Dehumidifiers shall be in operation during all ERV work. It will be theresponsibility of the M.C. to maintain the Dehumidifiers during constructionincluding filter cleaning/replacement, condensate pump maintenance, andcondensate tubing to an acceptable discharge location. If an acceptabledischarge location is not available, the contractor shall empty bucket daily.• At the completion of construction, the Dehumidifiers are to be removedfrom the project site. The Owner does not want to retain.• Industrial Portable Dehumidifier to be (or equal);o Daytono Model:55HE56 70 pints per dayo R410-a refrigerant Continuous Draino 115v 60 hertz 5.5 ampo Corded (10 G min)o Condensate pumpPage 2 of 3• Fire alarm system must be operable @ unoccupied time, if not perform fire watchwhenever off.• Portable toilet facilities shall be provided by contractor.• Coordinate laydown and portable toilet locations with owner during pre-construction meeting.8) Liquidated damages: $250/day and public disgrace and banned from future projects if fail to perform.9) Utility/Water/HVAC Interruption: Must schedule in advance with the school. (3-Day Minimum notice)10) Permits and Liens: Contractor to procure.11) Patch and paint to match.• Walls and/or floors left exposed after new unit ventilator installation are to be repaired orpainted to match existing color/finish.12) The MC shall be responsible for all control wiring integration for his equipment. New equipmentcontrols shall be upgraded and integrated into the existing controls system including graphics.Alerton controls are existing.Contact Kevin Heywood with Hoffman Building Technologies.336-317-5065kevin.heywood@hbtech.com.13) Notes:••••Contractors must wear uniforms (shirts, hats, etc.) plus ID badge while working oncampus. The lead person shall check in at the office each day.Work may take place in the mechanical room and other mechanical/electrical roomsduring normal school hours, provided they do not disturb the operation of the school.Testing days will be announced well in advance. NO work may occur during the testingtimes.E-procurement contractors must pay any associated fees. This project does NOT requiree-procurement.14) Pre-Bid Meeting Notes:• School to be un-occupied during summer.Last Student Day 6-12-2026Last Staff Day 6-17-2026• Existing ceiling tiles are to be remove and reinstalled where required to access aboveceiling work. Contractor may elect to provide new ceiling tiles, if new tiles are provided theentire room must be replaced.15) Approved Manufacturers:• Ruskin RRS (UERV) will be allowed as an equal for ERV-5 and ERV-6 (Semco)Chris R. Stroupe, PERCMPage 3 of 3
- Commodity Codes
-
- NAICS 238220Plumbing, Heating, and Air-Conditioning Contractors
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Fabrication Lab HVAC Renovati...
Institution NC School of Science and Math Institution URL for Additional Information about
North Carolina State University
Bid Due: 7/07/2026
DSS Chiller, Cooling Tower, a...
Bid Number: FB26251 Bid Title: DSS Chiller, Cooling Tower, and Boiler Replacement Category:
City of Winston-Salem
Bid Due: 7/07/2026