NE 122nd Avenue Improvements for Water and Sewer
Project Information
- Bid Title
- NE 122nd Avenue Improvements for Water and Sewer
- Issuing Agency
- City of Vancouver
- Location
- Washington
- Published Date
- Jun 18, 2025
- Closing Date
- Jul 8, 2025
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- ITB 25-30
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Project: NE 122nd Avenue Improvements for Water and SewerRef. #: ITB 25-30Type: ITBStatus:OpenOpen Date: Jun 18th 2025, 10:00 AM PDTQuestions Due Date: Jun 26th 2025, 5:00 PM PDTContact Information: Julie Denton, julie.denton@cityofvancouver.usClose Date: Jul 8th 2025, 11:00 AM PDT
Project Description: The Contractor shall furnish and install approximately 3,018 linear feet of 8-inch ductile iron water main, 70 LF of 6-inch ductile iron water main, 30 linear feet of 4-inch ductile iron water main, fire hydrants, and other appurtenances as shown on the Plans and specified herein.
The Contractor shall also furnish and install approximately 400 lineal feet of 8-inch C900 and 362 lineal feet of 8-inch PVC gravity sewer main. The sewer will be installed within the existing City of Vancouver right-of-way, including all laterals, manholes, and all appurtenances as shown on the plans and specified herein.
The Contractor shall restore the existing pavement where trenching takes place as specified herein, and grind and replace the existing pavement outside of the trench areas where shown on the plans and specified herein.
This project was previously bid in December of 2024 but withdrawn prior to award due to concerns over ground water in this area. The plans have been revised to install the northern
portion of the sanitary sewer as C900 pipe allowing for less cover and the sewer to be installed shallower. With these adjustments the Contractor is still encouraged to perform the northern portion of the sewer work in late August or September and complete it prior to the beginning of October to minimize the possibility of encountering ground water.
The Contract Work shall be Physically Complete within 70 Working Days from the Notice to Proceed.
Engineer's Estimate - $1,300,000
- Commodity Codes
-
- NAICS 237110Water and Sewer Line and Related Structures Construction
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Construction of Systemic Safe...
Project Name Deadline Project Info Request for Bids: Construction of Systemic Safety Pedestrian
Covington city
Bid Due: 7/16/2026
RFP 2026- 2028 Road Maintenan...
Bid Title: RFP 2026- 2028 Road Maintenance RFB Category: Tribal Employment Rights Ordinance
Quinault Indian Nation
Bid Due: 7/09/2026