2027-004 Downtown Improvements Project - Phase V

Project Information

Bid Title
2027-004 Downtown Improvements Project - Phase V
Issuing Agency
Commonwealth of Massachusetts
Location
Massachusetts
Published Date
Jul 22, 2026
Closing Date
Aug 5, 2026
Government Level
State & Local
Status
Closed
Ref. #
BD-27-1441-COG01-COG01-131618
Original Source
Join to Access Full Details
Project Description
Header Information
Bid Number:
BD-27-1441-COG01-COG01-131618
Description:
2027-004 Downtown Improvements Project - Phase V
Bid Opening Date:
08/05/2026 03:00:00 PM
Purchaser:
Joshua Cormier
Organization:
City of Gardner
Department:
COG01 - Purchasing
Location:
COG01 - Purchasing
Fiscal Year:
27
Type Code: Allow Electronic Quote:

No
Alternate Id:
2027-004
Required Date:
07/22/2026

Available Date
:
07/22/2026 09:55:23 AM
Info Contact: Bid Type:
OPEN
Informal Bid Flag:

No
Purchase Method:
Open Market
Pre Bid Conference:
July 29, 2026 at 10:00 AM
Bulletin Desc:
The project includes furnishing all labor, equipment and materials required to complete the Downtown Improvements Project Phase V. The project includes, but is not limited to, demolition of existing sidewalks, curbing and wheelchair ramps, removal of existing crosswalk pavement markings, new concrete sidewalk, granite curbing, wheelchair ramps, crosswalk reconfiguration, installation of pedestrian crosswalk posts and associated electrical wiring and conduits, loam and seed, and other work.
Ship-to Address:
Joshua Cormier
95 Pleasant Street Rm 217
Gardner, MA 01440
US
Email: jcormier@gardner-ma.gov
Phone: (978) 632-0426
FAX: (978) 632-9320
Bill-to Address:
Joshua Cormier
95 Pleasant Street Rm 217
Gardner, MA 01440
US
Email: jcormier@gardner-ma.gov
Phone: (978) 632-0426
FAX: (978) 632-9320
Print Format:
Bid Print

File Attachments:
2027-004 Bid Specifications.pdf
2027-004 Bid Drawings.pdf

Form Attachments:
Required Quote Attachments
Desired Attachment Name Description
Item Information

Item # 1:

(

72-10

-
33

)



The project includes furnishing all labor, equipment and materials required to complete the Downtown Improvements Project Phase V. The project includes, but is not limited to, demolition of existing sidewalks, curbing and wheelchair ramps, removal of existing crosswalk pavement markings, new concrete sidewalk, granite curbing, wheelchair ramps, crosswalk reconfiguration, installation of pedestrian crosswalk posts and associated electrical wiring and conduits, loam and seed, and other work, appurtenances, and incidental items as set forth in the contract documents.

U N S P S C Code:
72-10-33
Infrastructure maintenance and repair services

Qty Unit Cost UOM Total Discount Amt. Total Cost

1.0




EA - Each








Manufacturer:

Brand:

Model:

Make:

Packaging:


Commodity Codes
  • NAICS 236220Commercial and Institutional Building Construction
  • NAICS 541611Administrative Management and General Management Consulting Services
  • NAICS 541620Environmental Consulting Services
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.

Government Bids

Empower Your Bidding Strategy

Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.

  • Access an extensive database of bids, including comprehensive local and state opportunities.
  • Receive customized alerts for the bids that matter most to your business.
  • Explore detailed specifications to ensure precise and competitive submissions.
  • Gain a competitive edge with up-to-date information and exclusive opportunities.

See Also

AD Project #202610700 Bristol...

Header Information Bid Number: BD-27-1019-DCP06-OOL01-131801 Description: AD Project #202610700 Bristol Community College, Taunton

Commonwealth of Massachusetts

Bid Due: 9/10/2026

Wayland High School Wastewate...

Wayland High School Wastewater Treatment & Disposal Improvements Project Manager: Daniel Roop Project

Tighe & Bond

Bid Due: 8/27/2026