1234 S. ELM ST - DEMOLITION
Project Information
- Bid Title
- 1234 S. ELM ST - DEMOLITION
- Issuing Agency
- City of Jackson
- Location
- Michigan
- Published Date
- Jan 2, 2025
- Closing Date
- Jan 9, 2025
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Project ID:
Title: 1234 S. ELM ST - DEMOLITION
Addenda: 0
Release Date: 12/27/2024
Due Date: 1/9/2025
OverviewPost InformationPosted At:Fri, Dec 27, 2024 1:39 PMSealed Bid Process:Yes (Bids Sealed / Pricing Sealed)Private Bid:NoSummaryORDERED DEMOLITION OF 1234 S. Elm Street, Jackson, MI. Quotes are due on or before Thursday, January 9, 2025, by 9:00 AM. Demolition services to include:
- Hazardous materials must be abated in accordance with MIOSHA and DEQ regulations and the attached Pre-Demolition Compliance Survey assessment.
- Compact all clean backfill material with a hoe-pack or vibrating roller compactor.
- Remove 1 curb(s) cut(s) and entry approach(s). (Saw cut- S 12’ lineal feet of approach for work to remove access to 1234 S. Elm)
- Install 40 lineal feet of curb and gutter to remove access to 1234 S. Elm and restore double wide approach to N. property leading to garage doors
- Remove and replace 12 lineal feet of cracked, heaved and broken public sidewalks. (raise grade through walk to allow to cover tree roots and provide positive slope to ROW area)
- See enclosed water and sewer service records for approximate location and any special instructions for shared services. If no service card is provided it is the contractor’s responsibility to ensure that neighboring water and sewer services are operational at the conclusion of the demolition.
- Trees/shrubs: Remove trees to N along neighboring building. Cut flush to grade and cover with topsoil. Remove 5 marked trees to NW corner and cut all small trees and brush along W fence line flush to grade and cover with topsoil. Remove all overgrowth and brush from W and SW corners of property for clean lines. Plant 1- 2 ½” caliper maple street tree to E and S ROW areas centered on yard dimension each side.
- Miscellaneous: Remove dog pen to NW, asphalt drive and remove S 12’ of triple wide driveway approach and saw cut and install curbing to remove curb access to 1234 S. Elm St and to flare to N. driveway leading to overhead entry doors to N. building.
This will be a winter work demolition project with 70% billable upon completion of all demolitions, tree and brush removals, removal of all listed debris and providing a quality bladed winter grade completed no later than March 28th, 2025. Final completion to bill remaining 30% for concrete, final grade/topsoil/seed/straw then completed no later than May 22, 2025.
TimelineRelease Project Date:December 27, 2024Proposal Submission Deadline:January 9, 2025, 9:00am - Commodity Codes
-
- NAICS 238910Site Preparation Contractors
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
West Park Bandshell Demolitio...
due date & time bid description bid # primary contact status July 9,
City of Ann Arbor
Bid Due: 7/09/2026
West Park Bandshell Demolition
due date & time bid description bid # primary contact status July 9,
City of Ann Arbor
Bid Due: 7/09/2026