EVERGREEN HVAC REMOVAL AND REPLACEMENT
Project Information
- Bid Title
- EVERGREEN HVAC REMOVAL AND REPLACEMENT
- Issuing Agency
- City of Lake Stevens
- Location
- Washington
- Published Date
- Feb 19, 2026
- Closing Date
- Mar 5, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- 26003
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Number: 26003
Bid Title: EVERGREEN HVAC REMOVAL AND REPLACEMENT
Category: Invitation to Bid Status: Open Description: The City of Lake Stevens is seeking bids from a qualified contractor to includes the removal and replacement of existing HVAC units serving a 7,200 square foot commercial building at 10519 20 th Street SE. The contractor shall provide all labor, materials, equipment, and supervision necessary to perform the work, including disconnection, removal and disposal of the existing HVAC system in accordance with applicable environmental regulations, and procurement and installation of the new HVAC system as specified in these bid documents. All work shall comply with these bid documents and current local, state, and federal codes, as well as manufacturer installation requirements.
The contractor shall a plan for city approval that coordinates all work to minimize disruption to building occupants and operations prior to the start of onsite work. This includes scheduling shutdowns, protecting existing finishes and equipment, and maintaining temporary heating, cooling, or ventilation as required. The scope also includes testing, balancing, and commissioning of the new HVAC systems to verify proper operation, airflow, and performance. Any deficiencies identified during startup shall be corrected before substantial completion.
The contractor shall apply for required permits/permits including, but not limited to L&I electrical permits and city-issued mechanical permits. City-issued permits fees will be directly billed to the city’s Public Works Department, other permit fees are the responsibly of the contractor to pay as part of the lump sum bid item.
Upon completion, the contractor shall provide as-built documentation, equipment submittals, warranties, and operation and maintenance manuals. The contractor shall also provide owner training on the operation and maintenance of the new HVAC systems. Final acceptance will be contingent upon successful inspection, commissioning, and demonstration that the systems are fully operational and meet the performance criteria outlined in the bid documents.
This project is a bid as in accordance with the MRSC Small Works Roster process and the city’s procurement policy; all bids outside of those parameters shall be deemed unresponsive. The estimate for this project is $280,000.00. The contract will be awarded to the lowest responsive bidder, but the city reserves the right to reject any and all bids.
Project Location:
10519 20 TH ST SE
Lake Stevens, WA 98258Site Walk Through:
An optional site walk for interested Contractors is on Thursday, February 26, 2026, starting promptly at 9:00 A.M at 10519 20 th ST SE, Lake Stevens, WA 98258. These buildings require an authorized City-employee escort – please arrive on time and plan accordingly. Please do not enter the facilities outside of the scheduled walkthrough to prevent disturbances to the commercial tenants.
BID INSTRUCTIONS & SUBMITTAL
Bids must be received by the City by 3:00 PM on March 5, 2026, at City Hall located at 1812 Main Street, PO Box 257, Lake Stevens, WA 98258, or emailed to the Public Works Administrative Assistant, Natasha Houghtaling, For security reasons, you must enable JavaScript to view this E-mail address.. Bids received after the deadline are considered non-responsive and will not be considered.Bid for “EVERGREEN HVAC REMOVAL AND REPLACEMENT” must include all work and materials necessary for completion of the work, including, but not limited to,
- Mobilization and Demobilization
- Procurement and Installation of new high-efficiency HVAC units
- Removal and Proper Disposal of existing HVAC equipment
- Materials, Equipment, Tools, and Labor required for installation
- Traffic Control and Site Safety Measures
- Delivery and Handling Costs
- Insurance and Bonding as required by law
- Construction Administration and Project Management
- Electrical Work (disconnect switches, conduit, wiring)
- Ducting and Air Distribution (reuse existing ductwork, test and balance systems, duct leak remediation per code, or replace as documented in these bid documents and plans)
- Controls and Integration (install smoke detectors, connect to fire alarm systems if required by code)
- Commissioning of equipment and controls, including outside air economizer per code
Documentation and Closeout (commissioning logs, as-built drawings, manufacturer contact info, warranties)
To be considered responsive, bids must be submitted with a completed Statement of Bidder’s Qualification, List of Subcontractors, and a signed Bid Proposal Form, including Acknowledgment of Receipt of Addenda, if any.
BID PROCESS
The City will open bids after the bid closing date and time. A bid tabulation will be posted by the close of business on March 12, 2026. The contract will be awarded to the lowest responsive bidder. Non-responsive bidders will not be considered. The City reserves the right to reject any and all bids.
PREVAILING WAGES
The Contractor shall comply with applicable prevailing wage requirements of the Washington State Department of Labor & Industries, as set forth in Chapter 39.12 RCW and Chapter 296-127 WAC . The Contractor shall document compliance with said requirements and shall file with the City appropriate affidavits, certificates, and/or statements of compliance with the State prevailing wage requirements. The Washington State Prevailing Wage Rates for Public Works Contracts, Snohomish County, incorporated in this bid document, have been established by the Department of Labor & Industries. The Contractor shall also ensure that any subcontractors or agents of the Contractor shall comply with the prevailing wage and documentation requirements as set forth herein.The date of effective prevailing wage rates is the bid date for this project. Contractor, including subcontractors, must file intent(s) and affidavit(s) of wages paid with the Washington State Department of Labor & Industries. Prevailing wage rates may be downloaded here: https://www.lni.wa.gov/licensing-permits/public-works-projects/prevailing-wage-rates/
PROJECT SPECIFICATIONS
See the attached Small Works Roster Contract and the project plans.INQUIRES
Questions regarding this Request for Bids must be directed to:Curtis Clifton
Public Works Operations Manager
For security reasons, you must enable JavaScript to view this E-mail address.
425.622.9452Publication Date/Time: 2/19/2026 12:00 AM Closing Date/Time: 3/5/2026 3:00 PM Contact Person: Curtis Clifton
Public Works Operations Manager
cclifton@lakestevenswa.gov
425.622.9452
Related Documents: - Attachment Preview
-
ABBREVIATIONAAVABVACADAFFAFSAHUALALTALUMAPAPPROXAVGDESCRIPTIONAUTOMATIC AIR VENTABOVEAIR CONDITIONING UNITACCESS DOORABOVE FINISHED FLOORAIR FLOW STATIONAIR HANDLING UNITACOUSTICAL LININGALTERNATEALUMINUMACCESS PANELAPPROXIMATEAVERAGEBBBBDDBFCBFPBGBHPBLDGBLWBOBBODBOPBSMTBTUBVELECTRIC BASEBOARD HEATERBOILERBACK DRAFT DAMPERBELOW FINISHED CEILINGBACKFLOW PREVENTORBLAST GATEBREAK HORSEPOWERBUILDINGBELOWBOTTOM OF BEAMBOTTOM OF DUCTBOTTOM OF PIPEBASEMENTBRITISH THERMAL UNITBUTTERFLY VALVECCAPCBVCCCDCFCFHCFMCFUCHWPCHWRCHWSCICLCLGCMUCOCOLCOMPCONCCONDCONNCONTCONTRCPCTCTFCWRCWSCUCUHCVCVBCWPCHILLERCAPACITYCIRCUIT BALANCING VALVECOOLING COILCEILING DIFFUSERCEILING FANCUBIC FEET PER HOURCUBIC FEET PER MINUTECHEMICAL FEED UNITCHILLED WATER PUMPCHILLD WATER RETURNCHILLED WATER SUPPLYCAST IRONCENTERLINECEILINGCONCRETE MANSORY UNITCLEANOUTCOLUMNCOMPRESSORCONCRETECONDENSATECONNECTIONCONTINUATIONCONTRACTORCONDENSATE PUMPCOOLING TOWERCOOLING TOWER FILTERCONDENSER WATER RETURNCONDENSER WATER SUPPLYCONDENSING UNITCABINET UNIT HEATERAUTOMATIC CONTROL VALVECONSTANT VOLUME BOXCONDENSER WATER PUMPABBREVIATIONDAMPDBDCDETDIADIAGDIFFDISCHDIVDNDWGDXDESCRIPTIONDAMPERDRY BULBDUST COLLECTORDETAILDIAMETERDIAGRAMDIFFERENTIALDISCHARGEDIVISIONDOWNDRAWINGDIRECT EXPANSIONEAEATECEDHEFEFFEJELELECENTEQUIPEQUIVERCERVESPETEUHEWTEXISTEXPANEXTEACHENTERING AIR TEMPERATUREELECTRICAL CONTRACTORELECTRIC DUCT HEATEREXHAUST FANEFFICIENCYEXPANSION JOINTELEVATIONELECTRICENTERINGEQUIPMENTEQUIVALENTENERGY RECLAIM COILENERGY RECOVERY UNITEXTERNAL STATIC PRESSUREEXPANSION TANKELECTRIC UNIT HEATERENTERING WATER TEMPERATUREEXISTINGEXPANSIONEXTERNALFFAFCFCUFCVFDF/DFINFLFLAFLEXFLRFMFOPFPFPMFPSFRICTF/S/DFTFTRFVFILTERFREE AREAFLEXIBLE CONNECTIONFAN COIL UNITFLOW CONTROL VALVEFLOOR DRAINFIRE DAMPERFINISHEDFLANGEDFULL LOAD AMPSFLEXIBLEFLOORFLOW METERFUEL OIL PUMPFIRE PROTECTIONFEET PER MINUTEFEET PER SECONDFRICTIONCOMBINATION FIRE SMOKE DAMPERFEETFINNED TUBE RADIATORFACE VELOCITYGAGALGALVGCGPHGPMGRDGRS/LBGAUGEGALLONSGALVANIZEDGENERAL CONTRACTORGALLONS PER HOURGALLONS PER MINUTEGRILLE/REGISTER/DIFFUSERGRAINS PER POUNDNOTE:ALL ABBREVIATIONS AND SYMBOLS MAY NOT APPEAR ON THE DRAWINGS FORTHIS PROJECT.ABBREVIATIONHHBHCHDHEHPHRHRUHTHTRHVHWCHWPHWRHWSHXHZABBREVIATIONSDESCRIPTIONHUMIDIFIERHOSE BIBBHEATING COILHEADHEAT EXCHANGERHEAT PUMP OR HORSE POWERHOURHEAT RECOVERY UNITHEIGHTHEATERHEATING AND VENTILATION UNITHOT WATER CIRCULATIONHOT WATER PUMPHEATING WATER RETURNHEATING WATER SUPPLYHEAT EXCHANGERHERTZIDINTERNAL DIAMETERININCHESINCLINCLUDING/INCLUDEDINTINTERNALINVINVERTIRHINFARED HEATERKWKILOWATTLATLBSLBS/HRLFLRALVGLWTLEAVING AIR TEMPERATUREPOUNDSPOUNDS PER HOURLINEAR FEETLOCK ROTOR AMPSLEAVINGLEAVING WATER TEMPERATUREMAVMAXMBHMCMCAMEDMFRMHMINMISCMXBMTDMDMUAMANUAL AIR VENTMAXIMUMTHOUSANDS OF BTU PER HOURMECHANICAL CONTRACTORMINIMUM CIRCUIT AMPACITYMEDIUMMANUFACTURERMANHOLEMINIMUMMISCELLANEOUSMIXING BOXMOUNTEDMOTORIZED DAMPERMAKE-UP AIR UNITNEGNEGATIVENICNOT IN CONTRACTNTSNOT TO SCALEOAOUTSIDE AIROATOUTSIDE AIR TEMPERATUREOBDOPPOSED BLADE DAMPERODOUTSIDE DIAMETEROCON CENTEROCCOCCUPIEDORDOVERFLOW ROOF DRAINOVOUTLET VELOCITYABBREVIATIONPP-BFP-CP-CFP-CHP-COP-ERP-FOPBDPERFPHPNEUPRESSPRVPSPSIPSIGPTPTACDESCRIPTIONPUMPPUMP-BOILER FEEDPUMP-CONDENSER WATERPUMP-CHEMICAL FEEDPUMP-CHILLED WATERPUMP-CONDENSATEPUMP-ENERGY RECLAIMPUMP-FUEL OILPARALLEL BLADE DAMPERPERFORATEDPREHEAT COIL OR PHASEPNEUMATICPRESSUREPRESSURE REDUCING VALVEPRESSURE SWITCHPOUNDS PER SQUARE INCHPOUNDS PER SQUARE INCH GAUGEPRESSURE TRANSMITTERPACKAGED TERMINAL AIR CONDITIONERQTYQUANTITYR-#RAFRAHRCFRCPRDREQDRETRFRFGRHRHCRLARMRPMRTURVRETURN AIR GRILLERETURN AIR FANRADIANT HEATERRECIRCULATION FANREFLECTED CEILING PLANROOF DRAINREQUIREDRETURNRETURN FAN OR RELIEF FANREFRIGERATION UNITRELATIVE HUMIDITYREHEAT COILRATED LOAD AMPSROOMREVOLUTIONS PER MINUTEROOF TOP UNITRELIEF VALVES-#SASCHSCHEMSDSEFSFSPSPECSQSRVSSSTSTDSTMSTPSTRUCTSUPSYSSUPPLY DIFFUSERSUPPLY AIRSCHEDULESCHEMATICSMOKE DAMPERSMOKE EXHAUST FANSUPPLY FANSTATIC PRESSURESPECIFICATIONSQUARESAFETY RELIEF VALVESTAINLESS STEELSTORAGE TANKSTANDARDSTEAMSOUND TRAPSTRUCTURE OR STRUCTURALSUPPLYSYSTEMABBREVIATIONTDHTEMPTFTGTSPTTTUTYPDESCRIPTIONTOTAL DYNAMIC HEADTEMPERATURETRANSFER FANTRANSFER GRILLETOTAL STATIC PRESSURETEMPERATURE TRANSMITTERTERMINAL UNITTYPICALUCUNOCCUHUNDERCUTUNOCCUPIEDUNIT HEATERWFWBWCWGW/OWPDWTDW/WATER FILTERWET BULBWATER COLUMNWATER GAUGEWITHOUTWATER PRESSURE DROPWATER TEMPERATURE DROPWITHVVOLTSVAVALVEVAVVARIABLE AIR VOLUME UNITVBVACUUM BREAKERVDVOLUME DAMPERVELVELOCITYVTRVENT THRU ROOFGENERALEXISTING EQUIPMENT TO REMAINEXISTING EQUIPMENT TO BE REMOVEDEXISTING EQUIPMENT TO BE RELOCATEDRELOCATED EXISTING EQUIPMENTROUNDOVALSQUARE FEETHVAC REFERENCE SYMBOLSAHU-01XXTYPXXXXX1EQUIPMENT IDENTITY(SEE EQUIPMENT ABBREVIATIONLIST AND SCHEDULES)EQUIPMENT NUMBERINDICATES DETAIL, PLAN, SECTION, AND/ORDIAGRAM(APPLIES ONLY WHERE INDICATEDON DRAWINGS)INDICATES DRAWING ON WHICHDETAIL APPEARSINDICATES TYPICAL DETAIL(APPLIES TO ALL CONTRACTDRAWINGS)INDICATES DRAWING ON WHICHDETAIL APPEARSINDICATES SECTION NUMBERINDICATES ON WHICH DRAWINGSECTION APPEARSINDICATES REVISION & NUMBERLOCATION POINT FORCOORDINATION BETWEEN FLOORPLANS & PIPING DIAGRAMS(NUMBER)CONNECT NEW TO EXISTINGTERMINATION POINT OF DEMOLITIONCONNECT TO MANUFACTURER'SPREPIPED CONNECTIONPOINT OF BEAM PENETRATIONPREPURCHASED EQUIPMENTKEYED NOTE NUMBERMECHANICAL SYMBOLSMOTORIZEDDAMPERAIR DEVICE TOBE REMOVEDBACKDRAFT DAMPERSUPPLY AIRUCUNDERCUT DOORRETURN OR EXHAUST AIRDLDOOR LOWER (FREE AREAOUTSIDE AIRREQUIRED INDICATED INSQUARE FEET)FFIRE DAMPERCOILSMOKE DETECTORLOUVERTTRANSFERTHERMOSTAT WITH HUMIDISTATTHERMOSTATHUMIDISTATDUCTWORK SYMBOLSDOUBLE LINEEXISTING EQUIPMENT OR DUCTWORKTO BE REMOVED.EXISTING DUCTWORK TO REMAINNEW DUCTWORKSINGLE LINEMANUAL VOLUME DAMPER (MVD)MOTOR OPERATED DAMPER (MOD)ADACCESS DOORADADRADIUS ELBOW (R=1.5)VANED ELBOWBRANCH DUCT TAKE-OFFDRRISE OR DROP DIRECTION OFAIR FLOWFLEXIBLE CONNECTION (FXC)SIZECFM/BLOWDIFFUSERCEILING RETURN/EXHAUSTREGISTER (R) OR GRILLE (G)DRSIZECFM/BLOWNUMBERCFMSIZENUMBERCFMSIZESUPPLY AIR GRILLE (G) OR SUPPLYAIR REGISTER (R)RETURN AND/OR EXHAUST AIRGRILLE (G) OR REGISTER (R)INTERNALLY LINED DUCTNUMBERCFMSIZENUMBERCFMSIZEM0.0M0.1M0.2M0.3M0.4M1.0M1.1M1.2M1.3M2.0M2.1M2.2M3.0M3.1M3.2M3.3M3.4M3.5M3.6M3.7M4.0DRAWING INDEXLEGENDS AND ABBREVIATIONSSPECIFICATIONSSPECIFICATIONSSCHEDULESSCHEDULESFIRST FLOOR HVAC DEMO PLANENLARGED FIRST FLOOR HVAC DEMO PLANENLARGED SECOND FLOOR HVAC DEMO PLANFIRST FLOOR PIPING DEMO PLANFIRST FLOOR HVAC PLANENLARGED FIRST FLOOR HVAC PLANENLARGED SECOND FLOOR HVAC PLANDETAILSDETAILSDETAILSVRV PIPING & WIRING DIAGRAMSSECTIONSSECTIONSSECTIONS3D VIEWCONTROLSMÁSOFBEWASHNI NC SE SSRIEOG4NI 8SA2T6LE4REEND G I16 2026REVISIONS.BID SET. CIT OF LA E STEVENS.EVERGREEN BUILDING1051 20TH ST SELA E STEVENS WASHINGTON....NH24 36N2026.01.16.LEGENDS ANDABBREVIATIONS.M0.0SPECIFICATIONSGENERAL REQUIREMENTSSUBMISSION OF PROPOSAL DIRECTLY OR INDIRECTLY IN CONNECTION WITH THIS WORKSHALL IMPLY THAT THE BIDDER HAS EXAMINED THE CONTRACT DOCUMENTS AND JOBSITE UNDER WHICH THEY WILL BE OBLIGATED TO OPERATE SHOULD THEY BE AWARDEDTHE WORK UNDER THIS CONTRACT. NO EXTRA CHARGE WILL BE ALLOWED FOR FAILUREOF ANY BIDDER TO EXAMINE THE SITE PRIOR TO BID. ANY DISCREPANCIES SHALL BEBROUGHT FORTH PRIOR TO THE SUBMISSION OF BIDS.IN SUBMITTING THEIR BID THE CONTRACTOR ACKNOWLEDGES THEY SUFFICIENTLYREVIEWED AND UNDERSTAND THE SCOPE OF WORK, INCLUDING ALL ITEMS REQUIREDBY GOOD PRACTICE TO PROVIDE COMPLETE AND OPERATIONAL SYSTEMS, WHETHERSPECIFIED OR NOT.DO NOT SCALE THIS DRAWING FOR EXACT DIMENSIONS. VERIFY ALL FIGURES,CONDITIONS, AND DIMENSIONS AT THE JOB SITE.THE CONTRACTORS ARE RESPONSIBLE TO PROVIDE ALL LABOR AND MATERIALS ASREQUIRED WITHIN THE CONTRACT DOCUMENTS, APPLICABLE CODES ANDMANUFACTURERS REQUIREMENTS FOR A COMPLETE AND OPERATIONAL SYSTEM.THE CONTRACTOR SHALL MAINTAIN THE PROJECT SCHEDULE AS OUTLINED IN THECONTRACT DOCUMENTS. THIS INCLUDES ORDERING OF EQUIPMENT. ANY LONG LEADITEMS ARE TO BE IDENTIFIED AND SUBMITTED TO ARCHITECT/ENGINEER FOR EXPEDITEDREVIEW. LEAD TIME ISSUES ARE NOT ACCEPTABLE REASON FOR SUBMISSION OFALTERNATE PRODUCTS UNLESS APPROVED BY ARCHITECT/ENGINEER.CLEAN THE JOB SITE DAILY AND REMOVE FROM THE PREMISES ANY DIRT AND DEBRISCAUSED BY THE PERFORMANCE OF THE WORK INCLUDED IN THIS CONTRACT.USE OF THE OWNER'S ELEVATORS AND BUILDING CORRIDORS FOR HANDLING OF THEOWNER AND REMOVED EQUIPMENT AND MATERIALS SHALL BE AT THE DIRECTION OFTHE OWNER AND SHALL BE COORDINATED WITH HIS OPERATIONS.THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE SAFEKEEPING OF OWN PROPERTYON THE JOB SITE. OWNER ASSUMES NO RESPONSIBILITY FOR PROTECTION OFPROPERTIES AGAINST FIRE, THEFT AND ENVIRONMENTAL CONDITIONS.THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING A SAFE JOBSITE PERAPPLICABLE LAWS AND INDUSTRY PRACTICES.WHERE USED, THE TERM "PROVIDE" SHALL MEAN "FURNISH AND INSTALL".CONTRACTOR SHALL BE RESPONSIBLE FOR WORKMEN'S IDENTIFICATION AND BADGING,SAFETY AND FIRE PROTECTION, CONTRACTOR'S LIABILITY INSURANCE, BARRICADES,WARNING SIGNS, TRASH REMOVAL, CUTTING AND PATCHING.CONTRACTOR SHALL BE RESPONSIBLE FOR ALL SHIPPING, RIGGING, HANDLING ANDPROTECTION OF MATERIALS.CONTRACTOR SHALL PROVIDE LABOR TO RECEIVE, UNLOAD, STORE, PROTECT ANDTRANSFER TO POINT OF INSTALLATION, OWNER FURNISHED ITEMS.CONTRACTOR SHALL PROVIDE ALL EQUIPMENT AND ACCESSORIES AS SPECIFIED ORSCHEDULE IN THE CONTRACT DOCUMENTS. CONTRACTOR SHALL COORDINATE WITHEQUIPMENT SUPPLIER TO VERIFY MODELS, FEATURES, ACCESSORIES AND CAPACITIES.CONTRACTOR SHALL INFORM ENGINEER OF ANY DISCREPANCIES PRIOR TO BIDDING.ALL ELECTRICAL EQUIPMENT AND COMPONENTS SHALL BE UL LISTED.CODE COMPLIANCEALL WORK SHALL CONFORM TO ALL STATE AND LOCAL CODES, RULES ANDREGULATIONS AND ORDINANCES:· ALL APPLICABLE INDUSTRIAL SAFETY AND HEALTH LAWS AND REGULATIONS· LOCAL UTILITY CODES/REQUIREMENTS· LOCAL MECHANICAL, PLUMBING, ENERGY, FIRE AND BUILDING CODES· 2021 INTERNATIONAL BUILDING CODE WITH STATEWIDE AMENDMENTS (IBC)· 2021 INTERNATIONAL EXISTING BUILDING CODE WITH STATEWIDE AMENDMENTS(IEBC)· 2021 INTERNATIONAL FIRE CODE WITH STATEWIDE AMENDMENTS (IFC)· 2021 INTERNATIONAL MECHANICAL CODE WITH STATEWIDE AMENDMENTS (IMC)· 2021 UNIFORM PLUMBING CODE WITH STATEWIDE AMENDMENTS (UPC)· 2021 WASHINGTON STATE ENERGY CODE (WSEC)· 2021 INTERNATIONAL FUEL GAS CODE (IFGC)· APPLICABLE NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) AND AMERICANPETROLEUM INSTITUTE (API) INDUSTRY CODES· ICC/ANSI A117.1-09, ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES, WITHSTATEWIDE AMENDMENTS· UNDERWRITERS' LABORATORIES· NATIONAL ELECTRICAL CODE (NFPA 70) WITH STATEWIDE AMENDMENTSPERMITSCONTRACTOR SHALL SECURE AND PAY ALL FEES AND PERMITS PERTAINING TO THECONTRACT.SUBSTITUTIONSCONTRACT SHALL SUBMIT PRODUCT SUBSTITUTIONS DURING THE BID PERIOD FORPRIOR APPROVAL BY THE ARCHITECT/ENGINEER. CONTRACTOR SHALL BE RESPONSIBLEFOR THE SUBSTITUTE BEING EQUAL TO THE BASIS OF DESIGN PRODUCT. ANY COSTSFOR THE SUBSTITUTION SHALL BE COVERED BY THE CONTRACTOR.PROJECT COORDINATIONTHE CONTRACTOR SHALL COORDINATE THEIR WORK WITH ALL OTHER TRADES PRIORTO FABRICATION, PURCHASE AND/OR INSTALLATION OF ALL WORK.CONTRACTOR SHALL COORDINATE INSTALLATION OF EQUIPMENT AND SYSTEMS WITHOTHER TRADES INCLUDING INTERFERENCES WITH STRUCTURE, LIGHTING, ETC AS WELLAS REQUIRED MAINTENANCE CLEARANCES.CONTRACTOR SHALL VISIT THE SITE AND VERIFY ALL DIMENSIONS IN THE FIELD, ANDSHALL ADVISE THE ARCHITECT/ENGINEER AND THE OWNER OF ANY DISCREPANCIESBEFORE PERFORMING THE WORK.CONTRACTOR SHALL PROVIDE EQUIPMENT AND MATERIAL SUBMITTALS FOR ALLPRODUCTS TO BE USED ON THE PROJECT FOR ARCHITECT/ENGINEER APPROVAL.CONTRACTOR SHALL PROVIDE SHOP DRAWINGS AS INDICATED.CONTRACTOR SHALL COORDINATE ELECTRICAL CLEARANCE REQUIREMENTS WITHOTHER TRADES PER NEC.CONTRACTOR SHALL COORDINATE WITH ELECTRICAL CONTRACTOR FOR LOCATION ANDWIRING OF HVAC EQUIPMENT.CONTRACTOR SHALL COORDINATE INSTALLATION OF ROOF FLASHING PERTAINING TOTHEIR WORK.EXISTING BUILDINGS AND CONDITIONSPRIOR TO SUBMITTING BID, THE CONTRACTOR SHALL CONDUCT A SITE VISIT TO REVIEWEXISTING CONDITIONS TO DETERMINE IMPACTS ON EXECUTION OF WORK DETAILED INTHE CONTRACT DOCUMENTS. IN SUBMITTING THEIR BID THE CONTRACTORACKNOWLEDGES THEY SUFFICIENTLY REVIEWED AND UNDERSTAND THE SCOPE OFWORK, INCLUDING ALL ITEMS REQUIRED BY GOOD PRACTICE TO PROVIDE COMPLETEAND OPERATIONAL SYSTEMS, WHETHER SPECIFIED OR NOT.CONTRACTOR SHALL VERIFY DIMENSIONS AND EXISTING CONDITIONS PRIOR TOPROCEEDING WITH ANY WORK. WHERE DISCREPANCIES OCCUR BETWEEN THESEDOCUMENTS AND EXISTING CONDITIONS, THE DISCREPANCY SHALL BE REPORTED TOTHE OWNER AND/OR ENGINEER FOR EXPEDITING AND RESOLVE.ALL SHUT DOWNS OF EXISTING SYSTEMS SHALL BE SCHEDULED AND APPROVED BY THEOWNER PRIOR TO COMMENCING WITH WORK.NO PIPING, EQUIPMENT, ETC. SHALL BE REMOVED, DISCONNECTED OR SHUT DOWNWITHOUT PRIOR REVIEW WITH THE OWNER AND/OR ENGINEER TO CONFIRM THAT AREASTO REMAIN IN OPERATION WILL NOT BE AFFECTED. IF ANY AREAS NOT WITHIN THESCOPE OF WORK ARE AFFECTED BY ANY SHUTDOWN, REMOVAL OR DISCONNECTION,SUFFICIENT ADVANCE NOTICE MUST BE GIVEN TO THE OWNER INDICATING WHICHAREAS WILL BE AFFECTED, WHEN THE PROPOSED SHUTDOWN WILL OCCUR, AND FORHOW LONG A PERIOD OF TIME.EXISTING MATERIALS THAT ARE REMOVED SHALL NOT BE REUSED IN NEW SYSTEMS,EXCEPT WHERE INDICATED AS BEING RELOCATED.ALL EXISTING INSULATION FOR DUCTWORK AND PIPING PERTAINING TO THIS WORKSHALL BE PATCHED AND/OR REPLACED AS REQUIRED TO MAINTAIN VAPOR BARRIER.CONTRACTOR SHALL INSPECT THE EXISTING DUCTWORK FOR DEFECTS AND REPORT TOTHE ARCHITECT/ENGINEER AND THE OWNER ANY DEFICIENCIES PRIOR TO PERFORMINGANY WORK. CONTRACTOR SHALL CLEAN ALL EXISTING DUCTWORK, GRILLES,REGISTERS AND DIFFUSERS PRIOR TO INSTALLING THE NEW WORK.RESTORATION OF EXISTING SYSTEMS, DEVICES, FINISHES, ETC. DAMAGED OR ALTEREDBY NEW WORK TO ACCEPTABLE CONDITION AS DETERMINED BY THE OWNER,ARCHITECT AND/OR ENGINEER.ISOLATE AND DRAIN EXISTING PIPING SYSTEM AS REQUIRED TO ACCOMMODATEINSTALLATION OF THE NEW WORK.SUCCESSFULLY PRESSURE TEST ALL REROUTED PIPING SYSTEMS. TEST SHALL BEPERFORMED AT NORMAL SYSTEM OPERATING PRESSURES. REPAIR AND RETEST ASREQUIRED UNTIL SYSTEMS PROVE TIGHT.ALL WORK SHALL BE PERFORMED IN A CLEAN AND WORKMANLIKE MANNER. CARE SHALLBE EXERCISED TO MINIMIZE ANY INCONVENIENCE OR DISTURBANCE TO OTHER AREASOF THE BUILDING WHICH ARE TO REMAIN IN OPERATION. ISOLATE WORK AREAS BYMEANS OF TEMPORARY PARTITIONS AND/OR TARPS TO DEEP DUST AND DIRT WITHINTHE CONSTRUCTION AREA.EXECUTION AND QUALITYALL EQUIPMENT SHALL BE INSTALLED IN STRICT COMPLIANCE WITH THEMANUFACTURER'S WRITTEN INSTRUCTIONS. THE CONTRACTOR SHALL PROVIDE ALLHANGERS AND SUPPORTS REQUIRED FOR A COMPLETE INSTALLATION.PROVIDE ALL NECESSARY TEMPORARY OR PERMANENT CAPS OR PLUGS FORDUCTWORK AND PIPING. DO NOT LEAVE PIPING OPEN ENDED.WHERE CONDUIT, CABLES, DUCTWORK OR PIPING PASSES THROUGH SMOKE/FIRERATED FLOORS OR WALLS, THE SLEEVES SHALL BE COMPLETELY SEALED WITH A FIRESTOP MATERIAL THAT IS UL LISTED AND ACCEPTED BY THE BUILDING DEPARTMENT ANDFIRE DEPARTMENT AS BEING SUITABLE FOR THIS SERVICE SUCH AS DOW CORNINGCORP., SILICONE ELASTOMER, DOW CORNING 3-6548 SILICONE RTV FOAM, ORAPPROVED EQUAL. THIS MATERIAL SHALL BE INSTALLED IN ACCORDANCE WITH THEREQUIREMENTS OF THE MANUFACTURER TO MAINTAIN THE RATING OF THEPENETRATED WALL OR FLOOR.CONTRACTOR SHALL BE RESPONSIBLE FOR ALL SLEEVING, CUTTING, CORING ANDPATCHING AS IT RELATES TO HIS WORK.CONTRACTOR SHALL BE RESPONSIBLE FOR ALL BEAM PENETRATIONS AS IT RELATES TOHIS WORK. CONTRACTOR SHALL SUBMIT SIZE AND LOCATION TO THE STRUCTURALENGINEER FOR REVIEW AND DETAIL.DRAWINGS INDICATED DIAGRAMMATICALLY THE EXTENT, GENERAL CHARACTER ANDLOCATION OF THE WORK INCLUDED. OFFSETS AND/OR CHANGES IN ELEVATION OFPIPING AND DUCTWORK DUE TO STRUCTURAL OR OTHER INTERFERENCES SHALL BEPROVIDED WITHOUT EXTRA COST.SEAL ALL PENETRATIONS THROUGH BUILDING ENVELOPE WEATHER TIGHT WITH LONGLIFE CAULK/SEALANT RATED FOR THE ENVIRONMENT.SEAL ALL SLEEVE PENETRATIONS THROUGH FLOORS WITHIN BUILDING WATER TIGHT.UNLESS NOTED OTHERWISE ALL EQUIPMENT, DUCTWORK, CONDUIT, PIPING ANDASSOCIATED ACCESSORIES ARE TO BE CONCEALED ABOVE CEILINGS AND IN WALLS.EQUIPMENT SHALL BE INSTALLED PER MANUFACTURERS REQUIREMENTS INCLUDINGPIPING AND WIRING.CONTRACTOR SHALL PROVIDE ALL INTERCONNECTING WIRING AND ACCESSORIESBETWEEN EQUIPMENT AND ACCESSORIES PER THE RESPONSIBILITY MATRIX IN THESEDOCUMENTS. ALL WORK SHALL CONFORM TO THE LOCAL ELECTRICAL CODE ANDREQUIREMENTS WITHIN THE ELECTRICAL CONTRACT DOCUMENTS.CONTRACTOR SHALL PROVIDE TESTING AND STARTUP OF ALL EQUIPMENT AND DEVICESAS WELL AS COORDINATE WITH COMMISSIONING AGENT AND BALANCER FORCOMPLETE OPERATION SYSTEM.COORDINATE EQUIPMENT, DIFFUSER, REGISTER, DAMPER, ACCESS DOORS, ETC WITHARCHITECTURAL CEILING PLANS AND ELEVATIONS AS WELL AS LIGHTING LAYOUT.VERIFY DIFFUSER/REGISTER FRAMES WITH CEILING PRIOR TO ORDERING.THESE SPECIFICATIONS ARE INTENDED TO COVER THOSE ITEMS TYPICALLY ADDRESSEDIN DIVISION 22 AND 23. REFER TO COMPLETE CONTRACT DOCUMENTS FOR ALLREQUIREMENTS, INCLUDING THOSE PROVIDED BY OWNER AND OTHER DISCIPLINES.WHERE MATERIALS OR EQUIPMENT ARE NOT COVERED IN THESE SPECIFICATIONSCONTRACTOR SHALL PROVIDE THE MATERIALS OR EQUIPMENT AS WOULD BEREASONABLY EXPECTED FOR COMPLETE AND OPERATIONAL SYSTEMS UTILIZED BY THEINDUSTRY FOR SIMILAR PROJECTS IN THE SAME GEOGRAPHIC AREA.PROJECT CLOSEOUTUPON COMPLETION OF CONSTRUCTION CONTRACTOR SHALL SUPPLY THE OWNER WITHAS-BUILT DOCUMENTS AND COMPLETE COPIES OF OPERATIONS AND MAINTENANCEMANUALS.UNLESS NOTED OTHERWISE PROVIDE ONE YEAR GUARANTEE AGAINST DEFECTIVEMATERIALS AND WORKMANSHIP AFTER FINAL ACCEPTANCE BY OWNER.PROVIDE TRAINING TO OWNERS STAFF TO INCLUDED AT MINIMUM· OPERATIONS AND MAINTENANCE MANUAL REVIEW· IDENTIFICATION OF SYSTEM SHUTOFFS AND ISOLATION· EQUIPMENT OPERATION INCLUDING··ROUTINE MAINTENANCE··OPERATING MODES··SHUTDOWN AND STARTUPPROVIDE ALL AHJ INSPECTION REPORTS, STARTUP REPORT, COMMISSIONING REPORT,BALANCING REPORT, TRAINING COMPLETION REPORT, COMPLETED PUNCH LISTS ANDOTHER DOCUMENTS FOR ARCHITECT/ENGINEERING REVIEW FOR PROJECT CLOSEOUTVERIFICATION.FINAL APPROVAL OF PROJECT COMPLETION WILL BE BY OWNER.BASIC MATERIALS AND METHODS (APPLIES TO ALL WORK)ALL PIPING SHALL BE INSTALLED AS INDICATED ON THE DRAWINGS IN A NEATWORKMANSHIP-LIKE MANNER AND BE SUPPORTED AS REQUIRED BY CODES. PIPINGSHALL BE SET UP AND DOWN AND OFFSET AS REQUIRED TO SUIT FIELD CONDITIONS.DIELECTRIC COUPLINGS/UNIONS SHALL BE USED WHERE DISSIMILAR METALS AREJOINED.WHERE CONDUITS, CABLES, DUCTWORK OR PIPING PASSES THROUGH FIRE RATEDFLOOR OR WALL, THE SLEEVES SHALL BE COMPLETELY SEALED WITH A FIRE STOPMATERIAL THAT IS UL LISTED AND ACCEPTED BY THE BUILDING DEPARTMENT AND FIREDEPARTMENT AS BEING SUITABLE FOR THE SERVICE. MATERIAL SHALL BE INSTALLED INACCORDANCE WITH THE REQUIREMENTS OF THE MANUFACTURER TO MAINTAIN THEFIRE RATING OF THE PENETRATED WALL OR FLOOR.CONTRACTOR SHALL COORDINATE INSTALLATION OF SLEEVES AS APPROPRIATE WITHCONSTRUCTION PHASING. ANY COST FOR FAILURE TO COORDINATE DURING THEAPPROPRIATE CONSTRUCTION PHASE WILL BE COVERED BY THE CONTRACTOR.PROVIDE ALL DUCT AND PIPE TRANSITIONS AS REQUIRED TO CONNECT TO EQUIPMENT.SUPPORTS AND HANGERS:PIPING HANGERS SHALL BE SPACED SO AS TO PREVENT SAG AND PERMIT PROPERDRAINAGE A HANGER SHALL BE PLACED WITHIN (1) FOOT OF EACH HORIZONTALELBOW.CLEVIS OR RING HANGERS WITH STEEL HANGER RODS SHALL BE UTILIZED. HANGERSSHALL BE SIZED TO ACCOMMODATE PIPING INSULATION AND BE PROVIDED WITH 6"SHIELDS TO PROTECT PIPING AT ALL HANGER LOCATIONS.PLASTIC SEPARATOR SHALL BE PROVIDED BETWEEN COPPER PIPING AND CLAMPS.DUCT AND PIPING SHALL BE SUPPORTED BY CODE/STANDARD REQUIREMENTS.USE MATERIALS COMPATIBLE WITH PIPING SYSTEMS AVOIDING ELECTROLYTIC ACTIONAND CONFORM WITH ANSI/ASME B31, NFPA, MSS SP-58, 69, 89.PROVIDE ADDITIONAL FRAMING/MEMBERS AS REQUIRED TO TRANSFER LOAD TOBUILDING STRUCTURAL ATTACHMENT LOCATIONS. FRAMING/MEMBERS SHALL BE OFMATERIAL AND SIZE FOR LOAD PER MANUFACTURER.PROVIDE SEISMIC BRACING FOR PIPING, DUCTWORK AND EQUIPMENT PER APPLICABLECODES. BRACING SHALL BE DESIGNED BY MANUFACTURER, MASON INDUSTRIES ORAPPROVED.CONNECTIONS TO BUILDING STRUCTURE SHALL BE PROVIDED BY CONTRACTOR INCOORDINATION WITH GENERAL CONTRACTOR. VERIFY CONNECTION LOCATIONS ANDTYPE AND USE APPROVED CONNECTION METHOD FOR LOCATION I.E. CONCRETE, POSTTENSION SLABS, WOOD OR STEEL.EQUIPMENT SHALL BE SUPPORTED FROM ABOVE OR BELOW AT MINIMUM THE FOURCORNERS OF THE EQUIPMENT.ESCUTCHEONS:PROVIDE CHROME ESCUTCHEONS AT ALL WALL AND FLOOR WALL PENETRATIONS INEXPOSED LOCATIONS, INCLUDING INSIDE/UNDER CABINETS.CONDENSATE DRAIN PIPING:CONDENSATE DRAIN PIPE ROUTE SHALL BE FIELD COORDINATED. TERMINATION POINTSSHALL BE EXTERIOR PERVIOUS AREAS APPROVED BY ARCHITECT/ENGINEER, ORINDIRECT DISCHARGE TO DRAINS/MOP SINKS, SINK TAIL PIECE CONNECTIONS ASALLOWED BY AHJ.IDENTIFICATION (EQUIPMENT AND PIPING)PROVIDE IDENTIFICATION OF ALL PIPES, VALVES, AND EQUIPMENT.IDENTIFICATION DEVICES TO BE USED SHALL INCLUDE THE FOLLOWING:· PLASTIC OR ADHESIVE PIPE MARKERS··PER ANSI A13.1 REQUIREMENTS··PROVIDE FLOW DIRECTION ARROWS··PROVIDE WITHIN 30" OF VALVES··PROVIDE ON EACH SIDE OF PARTITIONS· VALVE TAGS AND EQUIPMENT TAGS··EQUIPMENT TAGS SHALL BE PLASTIC 3"x1" MINIMUMPRODUCT REQUIREMENTSPRODUCT SHALL MEET SPECIFICATIONS AND SCHEDULED BASIS OF DESIGN EQUIPMENTAND MATERIALS.ALL PRODUCTS SHALL BE FREE OF DAMAGE. REPAIR TO DAMAGED PRODUCTS(SCRATCHES, DENTS, CORROSION, ETC) SHALL BE AT CONTRACTORS COST. ANY REPAIRSSHALL BE APPROVED BY ARCHITECT/ENGINEER. IF DAMAGE IS DEEMED BEYONDACCEPTABLE REPAIR BY THE ARCHITECT/ENGINEER THE CONTRACTOR SHALL REPLACETHE PRODUCT AT THEIR COST.COMMON MATERIALS AND ACCESSORIES (APPLIES TO ALL WORK)CONDENSATE DRAINAGE PIPING AND FITTINGS:SHALL BE SEAMLESS TYPE L COPPER WITH 95-5 SOLDER.REFRIGERANT PIPING:CONTRACTOR SHALL PROVIDE PIPING, VALVES AND ACCESSORIES IN ACCORDANCEWITH MANUFACTURER'S REQUIREMENTS.PIPING SHALL BE TYPE "K" COPPER TUBING WITH WROUGHT COPPER SOLDER TYPEFITTINGS.GAS PIPING:ALL GAS PIPING SHALL BE SCHEDULE 40 BLACK STEEL WITH MALLEABLE IRON FITTINGS.WHERE GAS PIPE CONNECTS TO EQUIPMENT IT SHALL BE PROVIDED WITH· A DRIP LEG THE FULL SIZE OF THE RUNOUT· A LINE SIZED SHUTOFF VALVE AND A UNIONGAS PIPING OPERATING AT PRESSURES GREATER THAN 9" WATER GAUGE SHALL BESCHEDULE 40 BLACK STEEL PIPE WITH WELDED JOINTS.PIPE INSULATION:ALL INSULATION SHALL HAVE A FLAME SPREAD RATING OF 25 OR LESS AND A SMOKEDEVELOPED RATING OF 50 OR LESS IN ACCORDANCE WITH ASTM E84 AND NFPA 90A.INSULATION SHALL BE INSTALLED PER MANUFACTURERS REQUIREMENTS AND INTENDEDSERVICE.PIPING SHALL BE INSULATED PER WSEC REQUIREMENTS. REFER TO INSULATIONTABLES LOCATED IN DRAWING SET FOR ADDITIONAL INFORMATION.MANUFACTURERS: ARMACELL, KNAUF, MANVILLE, OWENS-CORNING OR APPROVED.PROTECTION OF OUTDOOR INSULATION:PIPING INSULATION EXPOSED TO WEATHER SHALL BE PROTECTED FROM DAMAGE,INCLUDING THAT DUE TO· SUNLIGHT· MOISTURE· EQUIPMENT MAINTENANCE· WINDPROVIDE PIPE SHIELDING FROM OUTDOOR ENVIRONMENT· METAL JACKET 0.016 ALUMINUM· SELF-SEALING· INTEGRAL VAPOR RETARDER· WATERTIGHT METAL BANDING FOR BUTT JOINTS· SEALANT SHALL BE ALUMINUM PIGMENTED MASTIC VAPOR RETARDER· ADHESIVE TAPES ARE NOT ALLOWEDINDOOR PIPING INSULATION:· FIBERGLASS PIPING INSULATION WITH ALL SERVICE JACKET· INSULATION AROUND FITTINGS TO MATCH REQUIRED PIPE INSULATION THICKNESS· PVC PIPE JACKET ON ALL FITTINGS AS WELL AS PIPING SUSCEPTIBLE TO IMPACTDAMAGE· SEAL VAPOR BARRIER AT ALL JOINTS ON PIPING CONVEYING COLD LIQUIDS· ALL MATERIALS SHALL BE UL LISTED 25/50REFRIGERANT PIPING INSULATION:· 3/4" ARMAFLEX AP 25/50· METAL JACKET 0.016 ALUMINUM ON OUTDOOR PIPINGCONDENSATE PIPING INSULATION:· 3/4" ARMAFLEX AP 25/50· METAL JACKET 0.016 ALUMINUM ON OUTDOOR PIPINGPIPING INSULATION AT HANGERS:PROVIDE HALF SHELL HIGH DENSITY INSULATION ON PORTION RESTING ON HANGER.INSULATION THICKNESS AT HANGER SHALL MATCH ADJACENT PIPING.MOTORS:UNLESS NOTED OTHERWISE MOTORS SHALL MEET NEMA MG1. REFER TO ENERGY CODENOTES FOR MOTOR EFFICIENCY REQUIREMENTS.MOTOR STARTERS:CONTRACTOR SHALL FURNISH A COMBINATION MOTOR STARTER SIZED IN ACCORDANCEWITH THE MOTOR RATING OF THE MECHANICAL EQUIPMENT. START SHALL BE SUPPLIEDWITH FUSES OR CIRCUIT BREAKERS, CONTROL TRANSFORMER, OVERLOADS, ONENORMALLY OPEN AND ONE NORMALLY CLOSED AUXILIARY CONTACT AND H.O.A. SWITCHMOUNTED IN THE COVER. STARTER ENCLOSURE SHALL BE NEMA RATED FOR ITSLOCATION. STARTER SHALL BE INSTALLED AND WIRED BY THE ELECTRICALCONTRACTOR.DUCT SMOKE DETECTORS:CONTRACTOR SHALL PROVIDED UL LISTED DUCT SMOKE DETECTOR AS NOTED ONEQUIPMENT SCHEDULES OR ON PLANS. PROVIDE REMOTE MOUNTEDTESTING/NOTIFICATION STATION. COORDINATE WITH ELECTRICAL CONTRACTOR TOPROVIDE POWER AND INTERCONNECTING WIRING.PROVIDE INTEGRATION WITH FIRE ALARM AND CONTROLS SYSTEM FOR EQUIPMENTSHUTDOWN.VIBRATION ISOLATION:VIBRATION ISOLATION SHALL BE PER LATEST SMACNA GUIDELINES.VIBRATION ISOLATION FOR HANGING EQUIPMENT SHALL BE EQUAL TO MASONINDUSTRIES MODEL 30N, COMBINATION SPRING AND DOUBLE DEFLECTION NEOPRENEHANGER OR AS RECOMMENDED BY MANUFACTURER FOR APPLICATION.VIBRATION ISOLATION FOR BASED MOUNTED EQUIPMENT SHALL BE EQUAL TO MASONINDUSTRIES SLF OR AS RECOMMENDED BY MANUFACTURER FOR APPLICATION.DUCT SYSTEMSDUCT ACCESSORIESDUCTWORK SHALL BE CONSTRUCTED AND ERECTED IN ACCORDANCE WITH THE IMC ANDSMACNA DUCT CONSTRUCTION STANDARDS AND UNLESS NOTED OTHERWISE SHALL BE 2"PRESSURE CLASS.ALL DUCT DIMENSIONS INDICATED ON THE PLANS ARE INSIDE CLEAR DIMENSIONS. SHEETMETAL DIMENSIONS SHALL BE INCREASED TO ACCOMMODATE LINING THICKNESS.GENERAL DUCTWORK SHALL BE GALVANIZED SHEET METAL.DUCTWORK CONVEYING OR IN HIGH MOISTURE AREAS SHALL BE ALUMINUM.MANUAL VOLUME DAMPERS:GALVANIZED STEEL, PRE SMACNA EXCEPT PROVIDE BEARING AT ONE END OF DAMPERROD AND QUADRANT, WITH LEVER AND LOCK SCREW AT THE OPPOSITE END FORINSULATED DUCTS, QUADRANTS MOUNTED ON COLLAR TO CLEAR INSULATION. LEVERSMUST BE ACCESSIBLE. PROVIDE PINK PLASTIC RIBBON ON LEVERS TO VISUALLY IDENTIFYDAMPER LOCATIONS.ALL BRANCH DUCTS CONNECTED TO GRILLES/RESISTERS/DIFFUSERS SHALL HAVE VOLUMEDAMPERS.DUCTS EXPOSED IN OCCUPIED AREAS SHALL BE PAINTED PER ARCHITECT.ALL MITERED RECTANGULAR ELBOWS SHALL HAVE TURNING VANES.DUCTS BRANCHES DIRECTLY CONNECTED TO DIFFUSERS SHALL BE SIZED TO MATCHDIFFUSER NECK SIZE UNLESS NOTED OTHERWISE ON PER PLANS.LOW PRESSURE DUCTWORK:LONGITUDINAL AND TRANSVERSE JOINTS, SEAMS AND CONNECTIONS OF SUPPLY ANDRETURN DUCTWORK OPERATING AT A STATIC PRESSURE LESS THAN OR EQUAL TO 2INCHES WATER GAUGE SHALL BE SECURELY FASTENED AND SEALED WITH WELDS,GASKETS, MASTICS (ADHESIVES), MASTIC-PLUS, EMBEDDED-FABRIC SYSTEMS OR TAPESPER MANUFACTURER'S REQUIREMENTS.· CONTINUOUSLY WELDED AND LOCKING-TYPE JOINTS AND SEAMS ON DUCTS ARE NOTREQUIRED TO BE SEALED PER WSEC C403.10.2.1REMOTE VOLUME DAMPERS SHALL BE PROVIDED FOR DAMPERS ABOVE HARD LID CEILINGSOR IN ACCESSIBLE LOCATIONS.ACCESS DOORS:PROVIDE ACCESS DOORS IN DUCTWORK WHEREVER CONTROLS, CONTROL DAMPERS,COILS, SECURITY BARS OR INSTRUMENTS ARE LOCATED. ACCESS DOOR SIZE BEAPPROPRIATE FOR ITEM BEING ACCESSED. DOOR SHALL BE VENTLOCK WITH PIANO HINGEOR CAM LATCHES.ACCESS DOORS ON SUPPLY DUCTWORK SHALL BE DOUBLE WALLED AND PROVIDED WITHMINIMUM 1 INCH INSULATION.EQUIPMENT ACCESS DOORS FOR ALL EQUIPMENT LOCATED ABOVE HARD LID CEILINGS.ACCESS DOOR SHALL BE MINIMUM 24"x24".DUCT WALL PENETRATIONS SHALL BE SEALED WITH SMACNA CLASS A SEAL.ACCESS DOOR SIZES AND LOCATIONS TO BE COORDINATED WITH ARCHITECT/ENGINEERFOR FINAL APPROVAL.ALL SUPPLY AND RETURN DUCTWORK 15 FEET DOWNSTREAM OF HVAC EQUIPMENT SHALLBE INTERNALLY LINED WITH ACOUSTICAL DUCT LINER.ALL SUPPLY DUCTWORK 15 FEET DOWNSTREAM OF SOUND ATTENUATORS SHALL BEINTERNALLY LINED WITH ACOUSTICAL DUCT LINER.ALL RETURN DUCTWORK 15 FEET UPSTREAM OF SOUND ATTENUATORS SHALL BEINTERNALLY LINED WITH ACOUSTICAL DUCT LINER.ALL SUPPLY DUCTWORK 5 FEET DOWNSTREAM OF TERMINAL UNITS AND FAN COILS SHALLBE INTERNALLY LINED WITH ACOUSTICAL DUCT LINER.CONTRACTOR SHALL SPRAY PAINT INSIDE OF DUCT BLACK BEHIND ALL GRILLES ANDREGISTERS.DUCT INSULATIONALL INSULATION SHALL HAVE A FLAME SPREAD RATING OF 25 OR LESS AND A SMOKEDEVELOPED RATING OF 50 OR LESS IN ACCORDANCE WITH ASTM E84 AND NFPA 90A.INSULATION SHALL BE INSTALLED PER MANUFACTURERS REQUIREMENTS AND INTENDEDSERVICE.DUCTING SHALL BE INSULATED PER WSEC REQUIREMENTS. REFER TO INSULATION TABLESLOCATED IN DRAWING SET FOR ADDITIONAL INFORMATION.FLEXIBLE DUCTWORK:SHALL BE OF TWO ELEMENT SPIRAL CONSTRUCTION COMPOSED OF A CORROSIONRESISTANT METAL SUPPORTING SPIRAL AND COATED FABRIC WITH A MINERAL BASE(FLEXMASTER OR APPROVED). FLEXIBLE DUCT CONNECTORS SHALL BE UL LISTED ANDSHALL HAVE A FLAME SPREAD NOT EXCEEDING 25 AND A SMOKE SPREAD NOT EXCEEDING50. SHALL BE CLASS 1 RATED PER UL 181.USE OF FLEXIBLE DUCTWORK SHALL BE LIMITED TO NO MORE THAN 6 LINEAR FEET PERRUN.CONTRACTOR SHALL TAKE CARE AS NOT TO ALLOW FLEXIBLE DUCT TO KINK OR COLLAPSE.MAXIMUM 2 ELBOWS.FLEXIBLE EQUIPMENT CONNECTIONS:HVAC EQUIPMENT FLEXIBLE DUCT CONNECTIONS SHALL BE A MINIMUM OF 6 INCHES LONGAND HELD IN PLACE WITH HEAVY METAL BANDS, SECURELY ATTACHED TO PREVENT ANYLEAKAGE AT THE CONNECTION POINTS. FLEXIBLE CONNECTS SHALL BE FABRICATED FROMAPPROVED FLAME PROOF FABRIC PER NFPA 90A (DURO DYNE OR APPROVED). ASBESTOSCLOTH IS NOT ACCEPTABLE.NOT REQUIRED FOR EQUIPMENT WITH INTERNAL VIBRATION ISOLATION.FIRE DAMPERS, SMOKE DAMPERS AND FIRE/SMOKE DAMPERS:SUPPLY AND RETURN DUCTS, PLENUMS NOT IDENTIFIED IN THE INSULATION TABLES SHALLBE INSULATED WITH:· MINIMUM OF R-6 INSULATION IN UNCONDITIONED SPACES· MINIMUM OF R-8 INSULATION WHEN LOCATED OUTSIDE THE BUILDING IN CLIMATE ZONE4· MINIMUM OF R-12 INSULATION WHEN LOCATED OUTSIDE THE BUILDING IN CLIMATEZONE 5· WHERE LOCATED WITHIN A BUILDING ENVELOPE ASSEMBLY, THE DUCT OR PLENUMSHALL BE SEPARATED FROM THE BUILDING EXTERIOR OR UNCONDITIONED SPACE OREXEMPT SPACES BY MINIMUM INSULATION MATCHING THE BUILDING ENVELOP.MANUFACTURERS: ARMACELL, KNAUF, MANVILLE, OWENS-CORNING OR APPROVED.CONTRACTOR SHALL PROVIDE APPROVED DAMPERS AND ACCESS PANELS IN ANY AND ALLDUCTWORK THAT PENETRATES A HORIZONTAL OR VERTICAL FIRE/SMOKE PARTITION, ORAS OTHERWISE NOTED ON DRAWINGS.INSTALL DAMPERS PER MANUFACTURERS INSTRUCTIONS AND CURRENT CODEREQUIREMENTS.DUCT PRESSURE CLASSIFICATIONS ON THIS PROJECTDUCTS ON THIS PROJECT ARE LIMITED TO LOW PRESSURE CLASSIFICATION.PROTECTION OF OUTDOOR INSULATION:PIPING INSULATION EXPOSED TO WEATHER SHALL BE PROTECTED FROM DAMAGE,INCLUDING THAT DUE TO· SUNLIGHT· MOISTURE· EQUIPMENT MAINTENANCE· WINDACOUSTICAL DUCT, PLENUM, TRANSFER INSULATION:FIBROUS GLASS LINER - MAT FACEDFLEXIBLE GLASS-FIBER BLANKET WITH DURABLE, FIRE-RESISTANT GLASS-MAT AIRSTREAMSURFACE.REFRIGERANT PIPING METHODSALL PIPING SHALL BE CONCEALED WITHIN BUILDING ASSEMBLIES (WALLS, CEILINGS, ETC).SOFFITS ARE NOT TO BE UTILIZED UNLESS NOTED ON DRAWINGS.DRAWINGS ARE DIAGRAMMATIC, FINAL PIPE ROUTING SHALL BE BY CONTRACTOR INCOORDINATION WITH EQUIPMENT SUPPLIER TO OPTIMIZE SYSTEM LAYOUT.DESIGN INTENT IS TO MINIMIZE PIPING ROUTING ON BUILDING EXTERIOR.COMPLY WITH ASTM C1071 TYPE II.NOMINAL DENSITY: 1.5 TO 2.0 LB/FT³ (24–32 KG/M³).THICKNESS: 1 INCH FOR DUCTS ≤ 24 IN WIDTH; 2 INCH FOR LARGER OR HIGH-VELOCITYDUCTS.THERMAL CONDUCTIVITY (ASTM C177): ≤ 0.24 BTU·IN/HR·FT²·°F AT 75 °F MEAN.SOUND ABSORPTION (ASTM C423, 2 IN.): NRC ≥ 0.85.FLAME SPREAD ≤ 25; SMOKE DEVELOPED ≤ 50 (ASTM E84).AIRSTREAM SURFACE: TOUGH, EROSION-RESISTANT, ANTIMICROBIAL-TREATED MATFACING.MANUFACTURER (OR APPROVED EQUAL)JOHNS MANVILLE LINACOUSTIC MAT-FACED LINER — BLACK MAT SURFACE, 2 PCF DENSITY,ASTM C1071 TYPE II, SERVICE TEMPERATURE UP TO 250 °F.· CERTAINTEED TOUGHGARD R MAT-FACED LINER — WHITE OR BLACK MAT FINISH, 2 PCFDENSITY, NRC 0.85 @ 2 IN., R-VALUE 4.3 PER INCH, CLASS A (ASTM E84 25/50)MEÁSOFBEWASHNI NC SE SSRIEOG4NI 8SA2T6LE4REEND G I16 2026REVISIONS.BID SET. CIT OF LA E STEVENS.EVERGREEN BUILDING1051 20TH ST SELA E STEVENS WASHINGTON....NH24 36N2026.01.16.SPECIFICATIONS.M0.1COMMISSIONINGIT HAS BEEN DETERMINED THAT COMMISSIONING IS REQUIRED FOR THIS PROJECT PERTHE REQUIREMENTS OF SECTION C408 OF THE WSEC.BUILDINGS, OR PORTIONS THEREOF, WHICH ARE EXEMPT FROM SECTIONS C408.2THROUGH C408.7 MAY BE EXCLUDED FROM THE COMMISSIONING PROCESS.· MECHANICAL SYSTEMS ARE EXEMPT FROM THE COMMISSIONING PROCESS WHERETHE INSTALLED TOTAL MECHANICAL EQUIPMENT CAPACITY IS LESS THAN 240.000BTU/H COOLING CAPACITY AND LESS THAN 300,000 BTU/H HEATING CAPACITY.· SERVICE WATER HEATING SYSTEMS ARE EXEMPT FROM THE COMMISSIONINGPROCESS IN BUILDINGS WHERE THE LARGEST SERVICE WATER HEATING SYSTEMCAPACITY IS LESS THAN 200,000 BTU/H AND WHERE THERE ARE NO POOLS ORPERMANENT SPAS.· REFRIGERATION SYSTEMS ARE EXEMPT FROM THE COMMISSIONING PROCESS IF THEYARE LIMITED TO SELF-CONTAINED UNITS.COMMISSIONING SHALL BE COMPLETED BY A CERTIFIED COMMISSIONING PROFESSIONALAS DEFINED BY THE WSEC.· AN INDIVIDUAL WHO IS CERTIFIED BY AN ANSI/ISO/IEC 17024:2012 ACCREDITEDORGANIZATION TO LEAD, PLAN, COORDINATE, AND MANAGE COMMISSIONING TEAMSAND IMPLEMENT THE COMMISSIONING PROCESS.THE OWNER HAS NOT HIRED A COMMISSIONING AGENT FOR THIS PROJECT.COMMISSIONING SHALL BE COMPLETED BY CONTRACTORS COMMISSIONING AGENT. THECOMMISSIONING AGENT SHALL REVIEW THE CONTRACT DOCUMENTS AND DEVELOP ACOMMISSIONING PLAN IN ACCORDANCE WITH C408 OF THE WSEC.MECHANICAL CONTRACTOR SHALL ASSIST IN DEVELOPING FINAL FUNCTIONAL TESTPROCEDURES AS SPECIFIED BY COMMISSIONING AGENT.EQUIPMENT MANUFACTURER'S AUTHORIZED REPRESENTATIVES SHALL PERFORMSTART-UP AND TESTING SERVICES AND FUNCTIONAL PERFORMANCE TESTING.SUBMIT EQUIPMENT START-UP AND TEST PROCEDURES AND PRELIMINARY OPERATIONAND MAINTENANCE MANUALS TO THE COMMISSIONING AUTHORITY.COMMISSIONING PLAN SHALL INCLUDE:· ORGANIZATION, SCHEDULE, ALLOCATION OF RESOURCES, AND DOCUMENTATIONREQUIREMENTS OF THE COMMISSIONING PROCESS.· A NARRATIVE DESCRIPTION OF THE ACTIVITIES THAT WILL BE ACCOMPLISHED DURINGEACH PHASE OF COMMISSIONING, INCLUDING THE PERSONNEL INTENDED TOACCOMPLISH EACH OF THE ACTIVITIES, SYSTEMS TESTING AND BALANCING,FUNCTIONAL PERFORMANCE TESTING, AND VERIFICATION OF THE BUILDINGDOCUMENTATION REQUIREMENTS IN SECTION C103.6.· ROLES AND RESPONSIBILITIES OF THE COMMISSIONING TEAM, INCLUDING THE NAMEAND STATEMENT OF QUALIFICATIONS OF THE CERTIFIED COMMISSIONINGPROFESSIONAL.· A LISTING OF THE SPECIFIC EQUIPMENT, APPLIANCES OR SYSTEMS TO BE TESTED ANDA DESCRIPTION OF THE TESTS TO BE PERFORMED.· WHERE THE CERTIFIED COMMISSIONING PROFESSIONAL'S CONTRACT OREMPLOYMENT IS OTHER THAN DIRECTLY WITH THE BUILDING OWNER, AN IN-HOUSECOMMISSIONING DISCLOSURE AND CONFLICT MANAGEMENT PLAN SHALL BE A PARTOF THE COMMISSIONING PROCESS. A COPY SHALL BE INCLUDED IN THECOMMISSIONING PLAN. THIS PLAN SHALL DISCLOSE THE CERTIFIED COMMISSIONINGPROFESSIONAL'S CONTRACTUAL RELATIONSHIP WITH OTHER TEAM MEMBERS ANDPROVIDE A CONFLICT MANAGEMENT PLAN DEMONSTRATING THAT THE CERTIFIEDCOMMISSIONING PROFESSIONAL IS FREE TO IDENTIFY ANY ISSUES DISCOVERED ANDREPORT DIRECTLY TO THE OWNER.FUNCTIONAL PERFORMANCE TESTING SHALL BE CONDUCTED FOR:· MECHANICAL SYSTEMS IN SECTIONS C403· SERVICE WATER HEATING SYSTEMS IN SECTION C404· CONTROLLED RECEPTACLES AND LIGHTING CONTROL SYSTEMS IN SECTION C405· EQUIPMENT, APPLIANCES AND SYSTEMS INSTALLED TO COMPLY WITH SECTION C406OR C407· ENERGY METERING IN SECTION C409· REFRIGERATION SYSTEMS IN SECTION C410.WRITTEN PROCEDURES WHICH CLEARLY DESCRIBE THE INDIVIDUAL SYSTEMATIC TESTPROCEDURES, THE EXPECTED SYSTEM RESPONSE OR ACCEPTANCE CRITERIA FOR EACHPROCEDURE, THE ACTUAL RESPONSE OR FINDINGS, AND ANY PERTINENT DISCUSSIONSHALL BE FOLLOWED. THIS TESTING SHALL INCLUDE CONTROL SYSTEMS WHICH WILL BETESTED TO DOCUMENT THAT CONTROL DEVICES, COMPONENTS, EQUIPMENT, ANDSYSTEMS ARE CALIBRATED AND ADJUSTED TO OPERATE IN ACCORDANCE WITH APPROVEDCONSTRUCTION DOCUMENTS. TESTING SHALL AFFIRM THE CONDITIONS REQUIRED WITHINSECTIONS C408.2 THROUGH C408.7 UNDER SYSTEM TESTING.FUNCTIONAL PERFORMANCE TESTING - SAMPLING:FOR PROJECTS WITH SEVEN OR FEWER SIMILAR SYSTEMS, EACH SYSTEM SHALL BETESTED. FOR PROJECTS WITH MORE THAN SEVEN SYSTEMS, TESTING SHALL BE DONE FOREACH UNIQUE COMBINATION OF CONTROLS TYPE. WHERE MULTIPLES OF EACH UNIQUECOMBINATION OF CONTROL TYPES EXIST, NO FEWER THAN 20 PERCENT OF EACHCOMBINATION SHALL BE TESTED UNLESS THE CODE OFFICIAL OR DESIGN PROFESSIONALREQUIRES A HIGHER PERCENTAGE TO BE TESTED. WHERE 30 PERCENT OR MORE OF THETESTED SYSTEM FAIL, ALL REMAINING IDENTICAL COMBINATIONS SHALL BE TESTED.MECHANICAL AND SERVICE WATER HEATING SYSTEM TESTING:FUNCTIONAL PERFORMANCE TESTING SHALL DEMONSTRATE THE COMPONENTS, SYSTEMS,AND SYSTEM-TO-SYSTEM INTERFACING RELATIONSHIPS ARE INSTALLED AND OPERATE INACCORDANCE WITH APPROVED CONSTRUCTION DOCUMENTS. TESTING SHALL INCLUDETHE SEQUENCE OF OPERATION, AND BE CONDUCTED UNDER FULL-LOAD, PART-LOAD ANDTHE FOLLOWING CONDITIONS:· ALL MODES AS DESCRIBED IN THE SEQUENCE OF OPERATION;· REDUNDANT OR AUTOMATIC BACK-UP MODE;· PERFORMANCE OF ALARMS; AND· MODE OF OPERATION UPON A LOSS OF POWER AND RESTORATION OF POWER.METERING SYSTEM COMMISSIONING:ENERGY METERING SYSTEMS REQUIRED BY SECTION C409 SHALL COMPLY WITH SECTIONC408.6 AND BE INCLUDED IN THE COMMISSIONING PROCESS REQUIRED BY SECTION C408.1.THE COMMISSIONING PROCESS SHALL INCLUDE ALL ENERGY METERING EQUIPMENT ANDCONTROLS REQUIRED BY SECTION C409.METERING SYSTEM TESTING:FUNCTIONAL PERFORMANCE TESTING SHALL DEMONSTRATE THAT ENERGY SOURCEMETERS, END-USE METERS, DATA ACQUISITION SYSTEMS, AND ENERGY DISPLAYS AREINSTALLED AND OPERATE IN ACCORDANCE WITH APPROVED CONSTRUCTION DOCUMENTS.AT A MINIMUM, TESTING SHALL CONFIRM THAT:· THE METERING SYSTEM DEVICES AND COMPONENTS WORK PROPERLY UNDER LOWAND HIGH LOAD CONDITIONS.· THE METERED DATA IS DELIVERED IN A FORMAT THAT IS COMPATIBLE WITH THE DATACOLLECTION SYSTEM.· THE ENERGY DISPLAY IS IN A LOCATION WITH ACCESS TO BUILDING OPERATION ANDMANAGEMENT PERSONNEL.· THE ENERGY DISPLAY MEETS CODE REQUIREMENTS REGARDING VIEWS REQUIRED INSECTION C409.4.3. THE DISPLAY SHOWS ENERGY DATA IN IDENTICAL UNITS (E.G., KWH).·REFRIGERATION SYSTEM COMMISSIONING:ALL INSTALLED REFRIGERATION SYSTEMS SUBJECT TO SECTION C410 SHALL BE INCLUDEDIN THE COMMISSIONING PROCESS REQUIRED BY SECTION C408.1.· EXCEPTIONS:··SELF-CONTAINED REFRIGERATION SYSTEMS ARE EXEMPT FROM THECOMMISSIONING PROCESS.··TOTAL INSTALLED CAPACITY FOR REFRIGERATION IS EQUAL TO OR LESS THAN 240KBTU/H.REFRIGERATION SYSTEM TESTING:FUNCTIONAL PERFORMANCE TESTING SHALL DEMONSTRATE THAT COMPRESSORS, HEATEXCHANGERS, PIPING, DISTRIBUTION SYSTEMS, AND SYSTEM-TO-SYSTEM INTERFACINGRELATIONSHIPS ARE INSTALLED AND OPERATE IN ACCORDANCE WITH APPROVEDCONSTRUCTION DOCUMENTS. TESTING SHALL INCLUDE THE SEQUENCE OF OPERATIONAND BE CONDUCTED UNDER FULL-LOAD AT, PART-LOAD AND THE FOLLOWING CONDITIONS:· NORMAL MODE;· REDUNDANT OR AUTOMATIC BACK-UP MODE;· PERFORMANCE OF ALARMS; AND· MODE OF OPERATION UPON A LOSS OF POWER AND RESTORATION OF POWER.DEFICIENCIES:DEFICIENCIES FOUND DURING TESTING SHALL BE RESOLVED INCLUDING CORRECTIONSAND RETESTING.COMMISSIONING REPORT:REPORT SHALL BE COMPLETED AND CERTIFIED BY THE CERTIFIED COMMISSIONINGPROFESSIONAL AND DELIVERED TO THE BUILDING OWNER OR OWNER'S AUTHORIZEDAGENT.THE REPORT SHALL BE ORGANIZED WITH MECHANICAL, SERVICE WATER HEATING,CONTROLLED RECEPTACLE AND LIGHTING CONTROL SYSTEMS, ENERGY METERING, ANDREFRIGERATION FINDINGS IN SEPARATE SECTIONS TO ALLOW INDEPENDENT REVIEW.THE REPORT SHALL RECORD THE ACTIVITIES AND RESULTS OF THE COMMISSIONINGPROCESS AND BE DEVELOPED FROM THE FINAL COMMISSIONING PLAN WITH ALL OF ITSATTACHED APPENDICES.THE REPORT SHALL INCLUDE:· RESULTS OF FUNCTIONAL PERFORMANCE TESTS.· DISPOSITION OF DEFICIENCIES FOUND DURING TESTING, INCLUDING DETAILS OFCORRECTIVE MEASURES USED OR PROPOSED.· FUNCTIONAL PERFORMANCE TEST PROCEDURES USED DURING THE COMMISSIONINGPROCESS INCLUDING MEASURABLE CRITERIA FOR TEST ACCEPTANCE, PROVIDEDHEREIN FOR REPEATABILITY.· COMMISSIONING PLAN.· TESTING, ADJUSTING AND BALANCING REPORT.DEFERRED TESTS WHICH CANNOT BE PERFORMED AT THE TIME OF REPORT PREPARATIONDUE TO CLIMATIC CONDITIONS.BUILDINGS, OR PORTIONS THEREOF, SHALL NOT BE CONSIDERED ACCEPTABLE FOR AFINAL INSPECTION PURSUANT TO SECTION C104.2.6 UNTIL THE CODE OFFICIAL HASRECEIVED A LETTER OF TRANSMITTAL FROM THE BUILDING OWNER OR OWNER'SREPRESENTATIVE ACKNOWLEDGING THAT THE BUILDING OWNER OR OWNER'SAUTHORIZED AGENT HAS RECEIVED THE COMMISSIONING REPORT.· COMPLETION OF COMMISSIONING COMPLIANCE CHECKLIST (FIGURE C408.1.4.1) ISDEEMED TO SATISFY THIS REQUIREMENT.· PHASED ACCEPTANCE OF COMMISSIONING COMPLIANCE CHECKLIST FOR PORTIONSOF THE WORK SPECIFIC TO THE TRADE THAT IS BEING INSPECTED IS PERMISSIBLEWHERE ACCEPTED BY THE CODE OFFICIAL AND WHERE THE CERTIFIEDCOMMISSIONING PROFESSIONAL REMAINS RESPONSIBLE FOR COMPLETION OF THECOMMISSIONING PROCESS.· IF THERE ARE UNRESOLVED DEFICIENCIES WHEN THE FINAL INSPECTION ISSCHEDULED, THE COMMISSIONING REPORT SHALL BE SUBMITTED AND SHALLDESCRIBE THE UNRESOLVED DEFICIENCIES.BALANCINGCONTRACTOR SHALL BALANCE THE SYSTEMS TO QUANTITIES INDICATED ON THEDRAWINGS AND SUBMIT THE BALANCE REPORT TO THE ENGINEER FOR APPROVAL.BALANCING SHALL BE COMPLETED BY AN A/E APPROVED NEBB OR AABC CERTIFIEDFIRM. MINIMUM 5 YEARS EXPERIENCE ON PROJECTS OF SIMILAR SCOPE ANDCOMPLEXITY. PROVIDE SUBMITTAL OF FIRM FOR APPROVAL TO A/E.PROVIDE ALL EQUIPMENT, MATERIALS AND DEVICES NECESSARY TO ACCESS ANDMEASURE SYSTEM PERFORMANCE AND ADJUST TO VALUES INDICATED ON PLANS.COORDINATE SYSTEM READINESS WITH GENERAL CONTRACTOR PRIOR TOCOMMENCING WITH WORK.GENERAL CONTRACTOR SHALL:· MAKE NECESSARY DRIVE CHANGES (INCLUDING PROVIDING SHEAVES AND BELTS)TO ACHIEVE BALANCED SET POINTS IN COORDINATION WITH BALANCER.· TRIM PUMP IMPELLER TO ACHIEVE BALANCED SET POINTS IN COORDINATION WITHBALANCER. UPDATE NAMEPLATES TO REFLECT FINAL CONDITIONS.AT COMPLETION OF BALANCING GENERAL CONTRACTOR SHALL:· PROVIDE NEW FILTERS IN AIR DISTRIBUTION EQUIPMENT AND SYSTEMSSUBMIT THE FOLLOWING WITHIN 30 DAYS AFTER AWARD OF CONTRACT:· NAME OF TAB SUBCONTRACTOR.· INDIVIDUAL QUALIFICATIONS OF PERSONS RESPONSIBLE FOR SUPERVISING ANDPERFORMING THE WORK OF THIS PROJECT.· TAB AGENDA LISTING METHODS AND PROCEDURES, AND INCLUDING BLANK FORMSAPPLICABLE TO THIS PROJECT.· LIST OF PROJECTS COMPLETED BY TAB SUBCONTRACTOR OF SIMILAR SIZE, SCOPEAND EQUIPMENT. INCLUDE NAME OF CONTRACTOR AND OWNER CONTACTS.· LIST OF TEST INSTRUMENTS AND DATES AS TO LAST CALIBRATED.··CALIBRATION SHALL BE MINIMUM EVERY 12 MONTHS.· SYSTEM FLOW DIAGRAMS WITH PERTINENT DATA (FLOW, PRESSURE, VELOCITYDESIGN) FOR EACH SYSTEM TO BE BALANCED.· PROPOSED FINAL REPORT TABLE OF CONTENTS.BALANCING REPORT:PROVIDE COMPLETE BALANCING REPORT IN ACCORDANCE WITH NEBB REQUIREMENTS,INCLUDING THE FOLLOWING:· SYSTEM FLOW DIAGRAMS AND FLOOR PLANS.· FAN CURVES.· MANUFACTURERS' START-UP AND TEST DATA.· FIELD START-UP AND TEST REPORTS.· OTHER INFORMATION RELATIVE TO EQUIPMENT PERFORMANCE.REPORT DATA:· TITLE PAGE.· NAME AND ADDRESS OF TESTING, ADJUSTING, AND BALANCING AGENT.· PROJECT NAME.· PROJECT LOCATION.· ARCHITECT'S NAME AND ADDRESS.· ENGINEER'S NAME AND ADDRESS.· CONTRACTOR'S NAME AND ADDRESS.· REPORT DATE.· SIGNATURE OF TESTING, ADJUSTING, AND BALANCING SUPERVISOR WHO CERTIFIESTHE REPORT.· SUMMARY OF CONTENTS, INCLUDING THE FOLLOWING:··DESIGN VERSUS FINAL PERFORMANCE.··NOTABLE CHARACTERISTICS OF SYSTEMS.··DESCRIPTION OF SYSTEM OPERATION SEQUENCE IF IT VARIES FROM THECONTRACT DOCUMENTS.· NOMENCLATURE SHEETS FOR EACH ITEM OF EQUIPMENT.· TEST CONDITIONS FOR FANS AND PUMP PERFORMANCE FORMS, INCLUDING THEFOLLOWING:··SETTINGS FOR OUTDOOR, RETURN, AND EXHAUST AIR DAMPERS.··CONDITIONS OF FILTERS.··COIL, WET- AND DRY-BULB CONDITIONS.··FAN DRIVE SETTINGS, INCLUDING SETTINGS AND PERCENTAGE OF MAXIMUMPITCH DIAMETER.··SETTINGS FOR SUPPLY AIR STATIC PRESSURE CONTROLLER.· READINGS:··AIR QUANTITIES···SUPPLY, RETURN, EXHAUST AND OUTDOOR AIR.···DUCT TRAVERSE FOR ALL DUCTS CONVEYING AT LEAST 2,000 CFM.··AIR TEMPERATURES···SUPPLY, RETURN, OUTDOOR AIR AT EQUIPMENT···MIXED AIR TEMPERATURES BEFORE COILS AND HEAT TRANSFEREQUIPMENT··AIR HANDING EQUIPMENT···FAN RPM···SYSTEM STATIC PRESSURE···FAN SUCTION AND DISCHARGE PRESSURE···CLEAN FILTER PRESSURE DROP···SIMULATED DIRTY FILTER PRESSURE DROP···COIL AIR PRESSURE DROP···SHEAVE MAKE, SIZES AND SHAFT SIZE···NUMBER OF BELTS, MAKE AND SIZE··ELECTRICAL···VOLTAGE AND AMPS FOR EACH PHASE OF EACH MOTOR UNDER MAXIMUMNORMAL LOAD···NAMEPLATE VOLTAGE AND CURRENT FOR EACH MOTOR· PROVIDE PRELIMINARY AND FINAL BALANCING REPORT· SYSTEMS SHALL BE BALANCED WITHIN 10% OF DESIGN VALUES· PROVIDE COMMENTARY WHERE SYSTEMS ARE UNABLE TO BE BALANCED WITHIN10% OF DESIGN VALUESENERGY CODE NOTESHVAC BUILDING HEATING AND COOLING LOAD CALCULATIONS HAVE BEEN PERFORMEDUSING LOAD CALCULATION SOFTWARE BASED ON ASHRAE STANDARDS.HVAC EQUIPMENT SIZING SHALL NOT EXCEED THE NEXT LARGER UNIT SIZE OF THATREQUIRED FROM THE LOAD CALCULATIONS.HVAC EQUIPMENT SHALL MEET MINIMUM EFFICIENCY REQUIREMENTS UNLESS NOTEDOTHERWISE IN THESE DOCUMENTS.DUCTWORK SHALL BE LEAK TESTED PER CODE.MOTORS:· ALL MOTORS SHALL MEET THE MINIMUM EFFICIENCY REQUIREMENTS NOTED IN WSECC405.8.· FAN MOTORS SHALL BE SIZED TO BE SMALLEST MOTOR SIZE AVAILABLE GREATERTHAN THE FAN BHP .· INDIVIDUAL MOTORS SHALL MEET NEMA MG1 EFFICIENCY STANDARD· PACKAGED EQUIPMENT MOTORS SHALL BE BASED ON OVERALL EQUIPMENTEFFICIENCY RATING.ELECTRONICALLY COMMUTTED MOTORS:· SHALL BE CAPABLE OF SPEED CONTROL· MOTORS BETWEEN 1-1/2 HP AND 1 HP SHALL BE ELECTRONICALLY COMUTTED ANDHAVE MINIMUM EFFICIENCY OF 70%HVAC CONTROLS:· PROVIDE 5°F MINIMUM DEADBAND BETWEEN HEATING AND COOLING· PROVIDE AUTOMATIC SETBACK/SHUTOFF AND START/STOP CONTROLSDAMPERS (OUTSIDE AIR, EXHAUST, RELIEF):· LEAKAGE SHALL NOT EXCEED 4 CFM/SF AT 1.0 INCH W.G. FOR MOTORIZED DAMPERS· LEAKAGE SHALL NOT EXCEED 20 CFM/SF AT 1.0 INCH W.G. FOR NONMOTORIZEDDAMPERS· MOTORIZED DAMPERS SHALL FAIL CLOSED.PROVIDE ENERGY METERING AS REQUIRED BY THE WSEC.CONTROLSCONTRACTOR SHALL PROVIDE ALL CONTROLS INCLUDING LABOR, MATERIALS ANDPROGRAMMING (INCLUDING THAT FOR CONNECTION TO PACKAGED CONTROLS) FOR ACOMPLETE AND OPERATION SYSTEM.IT IS RECOMMENDED A SEPARATE CONTROLS CONTRACTOR BE HIRED TO PERFORM THEWORK IF THE MECHANICAL CONTRACTOR DOES NOT HAVE THEIR OWN IN-HOUSE FULL-TIMECONTROLS TECHNICIANS.CONTROLS SHALL MEET OPERATING REQUIREMENTS AS OUTLINED IN THESE DOCUMENTSAS WELL AS THE WASHINGTON STATE ENERGY CODE.CONTRACTOR SHALL SELECT DEVICES TO MEET CONTROLS INTENT AND PROVIDESTARTUP AND TESTING TO VERIFY SYSTEM OPERATION MEETS DESIGN INTENT.CONTRACTOR SHALL PROVIDE SHOP DRAWINGS, SEQUENCE AND POINTS LIST.DOCUMENTS SHALL BE PROVIDED TO AHJ UPON REQUEST FOR PERMIT REQUIREMENTS.PER THE WSEC THIS PROJECT DOES NOT REQUIRE A DDC FULL CONTROLS SYSTEM.THERMOSTATS SHALL BE INSTALLED AT 48 INCHES ABOVE FINISHED FLOOR. PROVIDELOCKABLE COVERS AS NOTED ON PLANS.COORDINATE FINAL THERMOSTAT LOCATIONS WITH ARCHITECT/ENGINEER PRIOR TOINSTALLATION.MEÁSOFBEWASHNI NC SE SSRIEOG4NI 8SA2T6LE4REEND G I16 2026REVISIONS.BID SET. CIT OF LA E STEVENS.EVERGREEN BUILDING1051 20TH ST SELA E STEVENS WASHINGTON....NH24 36N2026.01.16.SPECIFICATIONS.M0.2EQUIP IDRTU-1RTU-2RTU-3SHEET LOCATIONM2.0M2.0M2.0AREA SERVEDSUITE 1SUITE 2SUITE 3LOCATIONGROUNDGROUNDGROUNDCFM300023803000TAGRTU-1RTU-2RTU-3RTU-4RTU-5RTU-6MAKEMODELRHEEMRKKB-AO90CLI5ERHEEMRKKA-A036CK08ERHEEMRKKB-A120CM22EAMERICAN STANDARD YSC048G3EMB2ERHEEMRKKA-A042CK12ERHEEMRKKA-A036CK08EEXISITNG RTU - NAMEPLATE INFOCOOL CAPAC. BTUH87,00035,000120,00048,00042,00036,000HEAT IN BTUH150,00080,000225,000100,000120,00080,000HEAT OUT BTUH121,50064,500182,25081,00097,00064,500AFUE80%80%80%80%80%80%POWER208/ 230/ 3ph/ 60hz208/ 230/ 3ph/ 60hz208/ 230/ 3ph/ 60hz208/ 230/ 3ph/ 60hz208/ 230/ 3ph/ 60hz208/ 230/ 3ph/ 60hzMCA432164262221MOCP503080353530ROOFTOP UNIT SCHEDULE - PART 1BASIS OF DESIGNMAKEMODELVOLTSPHDAIKINDAIKINDAIKINDSH102DSH072DSH102208/2303208/2303208/2303ELECTRICALHZMCA6043.76027.96043.7MOP504050ELECTRICALCONNECTIONS111DIMENSIONSLHWINININ93-3/454-5/860-3/87439-7/8 48-5/1693-3/454-5/860-3/8OPERATINGWEIGHTLBS11576451157NOTESSEE PERFORMANCESCHEDULE FORADDITIONALINFORMATIONEQUIP IDSHEETLOCATIONAREA SERVEDBASIS OF DESIGNLOCATIONMAKEECONOMIZERMODELQTYCFMROOFTOP UNIT SCHEDULE - PERFORMANCE - PART 2SUPPLY FANDX COOLING HEAT PUMP HEATINGESPRPMHPSPEEDCONTROLECONOMIZERTOTAL MBHTOTAL MBHTYPERTU-1M2.0SUITE 1GROUNDDAIKINDSH102YES13000116002.4DIRECTYES98RTU-2M2.0SUITE 2GROUNDDAIKINDSH072YES12380115001.2DIRECTYES68RTU-3M2.0SUITE 3GROUNDDAIKINDSH102YES13000116002.4DIRECTYES9897SCROLL67SCROLL97SCROLLCONDENSING SECTIONQTY212REFRIGERANTCHARGE REFRIGERANT CONTROLLBS152/152182152/152R322 STAGER322 STAGER322 STAGEIEER15.516.715.5NOTES:1. PROVIDE WITH RETURN DUCT SMOKE DETECTOR.2. DISCONNECT AND PHASE MONITOR.3. DIRECT DRIVE STANDARD STATIC PRESSURE.4. TWO STAGE COOLING WITH HOT GAS REHEAT AND LOW AMBIENT CONTROL.5. STAND ALONE ELECTRO MECHANICAL CONTROLS.6. GROUND MOUNTED ON HOUSEKEEPING PAD.7. SINGLE POINT POWER CONNECTION FOR POWER EXHAUST.8. POWERED CONVENIENCE OUTLET.9. ULTRA LOW LEAK ECONOMIZER W/DRY BULB SENSOR.10. R32 SENSOR.EFFICIENCYEERCOP 47COP 17NOTES11.43.42.251-1011.33.42.251-1011.43.42.251-10OUTSIDE AIR DUCTWORK INSULATION PER 2021 WSEC TABLE C403.10.1.1DUCT SYSTEMDUCT LOCATIONAND USECLIMATE ZONEAIRFLOWMINIMUM INSTALLED DUCTINSULATION R-VALUE (a,b)NOTESOUTDOOR AIRINSIDE CONDITIONED SPACE AND UPSTREAM OF AUTOMATIC SHUTOFFDAMPER4C AND 5B>= 2800 CFMR-16SEE SECTION C403.10.1.1 FOR ADDITONALREQUIREMENTSOUTDOOR AIRINSIDE CONDITIONED SPACE AND DOWNSTREAM OF AUTOMATICSHUTOFF DAMPER TO HVAC UNIT OR ROOM4C>= 2800 CFMR-8OUTDOOR AIRINSIDE CONDITIONED SPACE AND DOWNSTREAM OF AUTOMATICSHUTOFF DAMPER TO HVAC UNIT OR ROOM5B>= 2800 CFMR-12OUTDOOR AIRINSIDE CONDITIONED SPACE4C AND 5B< 2800 CFMR-7SEE EXCEPTION 1 TO SECTION C403.10.1.1FOR ADDITIONAL DETAILS.INSULATION R-VALUES, MEASURED IN h·ft²·°F/Btu, ARE FOR THE INSULATION AS INSTALLED AND DO NOT INCLUDE FILM RESISTANCE. THE REQUIRED MINIMUM THICKNESSES DO NOa.CONSIDER WATER VAPOR TRANSMISSION AND POSSIBLE SURFACE CONDENSATION. INSULATION RESISTANCE MEASURED ON A HORIZONTAL PLANE IN ACCORDANCE WITH ASTM C518 ATA MEAN TEMPERATURE OF 75F AT THE INSTALLED THICKNESS.b.SEE INTERNATIONAL MECHANICAL CODE SECTIONS 603.12 AND 604 FOR FURTHER DETAILS ON DUCT INSULATION REQUIREMENTS.SUPPLY, RETURN, EXHAUST AND RELIEF AIR DUCTWORK INSULATION PER 2021 WSEC TABLE C403.10.1.2DUCT SYSTEMSUPPLY AIR ORRETURN AIRDUCT LOCATIONAND USEOUTSIDE BUILDING (OUTDOORS AND EXPOSED TO WEATHER), cCLIMATE ZONEMINIMUM INSTALLED DUCTINSULATION R-VALUE (a,b)NOTES4CR-8SEE SECTION C403.10.1.2 FOR DETAILSSUPPLY AIR ORRETURN AIROUTSIDE BUILDING (OUTDOORS AND EXPOSED TO WEATHER), c5BR-12SEE SECTION C403.10.1.2 FOR DETAILSSUPPLY AIR ORRETURN AIRUNCONDITIONED SPACE (ENCLOSED BUT NOT IN THE BUILDINGCONDITIONED ENVELOPE)SUPPLY AIR ORRETURN AIRUNCONDITIONED SPACE WHERE THE DUCT CONVEYS AIR THAT ISWITHIN 15°F OF THE AIR TEMPERATURE OF THE SURROUNDINGUNCONDITIONED SPACESUPPLY AIR ORRETURN AIRWHERE LOCATED IN A BUILDING ENVELOPE ASSEMBLY4C AND 5B4C AND 5B4C AND 5BSUPPLY AIRWITHIN CONDITIONED SPACE WHERE THE SUPPLY DUCT CONVEYS AIRTHAT IS LESS THAN 55°F OR GREATER THAN 105°F4C AND 5BSUPPLY AIRWITHIN CONDITIONED SPACE THAT THE DUCT DIRECTLY SERVESWHERE THE SUPPLY DUCT CONVEYS AIR THAT IS LESS THAN 55F ORGREATER THAN 105°F4C AND 5BSUPPLY AIRWITHIN CONDITIONED SPACE WHERE THE SUPPLY DUCT CONVEYS AIRTHAT IS 55°F OR GREATER AND 105°F OR LESS4C AND 5BR-6R-3.3R-16R-3.3NONENONESEE SECTION C403.10.1.2 FOR DETAILSSEE IMC SECTION 603.12 FOR ADDITIONALREQUIREMENTS FOR CONDENSATIONCONTROL AT DUCTWORKDUCT OR PLENUM IS SEPARATED FROMBUILDING ENVELOPE ASSEMBLY WITH THEMINIMUM INSULATION VALUESEE SECTION C403.10.1.2 FOR DETAILSSEE SECTION C403.10.1.2 FOR DETAILSRETURN OREXHAUST AIRWITHIN CONDITIONED SPACE, DOWNSTREAM OF AN ENERGYRECOVERY MEDIA, UPSTREAM OF AN AUTOMATIC SHUTOFF DAMPER4CR-8RETURN OREXHAUST AIRWITHIN CONDITIONED SPACE, DOWNSTREAM OF AN ENERGYRECOVERY MEDIA, UPSTREAM OF AN AUTOMATIC SHUTOFF DAMPER5BR-12RELIEF OREXHAUST AIRCONDITIONED SPACE AND DOWNSTREAM OF AN AUTOMATIC SHUTOFFDAMPER4C AND 5BR-16INSULATION R-VALUES, MEASURED IN h·ft²·°F/Btu, ARE FOR THE INSULATION AS INSTALLED AND DO NOT INCLUDE FILM RESISTANCE. THE REQUIRED MINIMUMa.THICKNESSES DO NO CONSIDER WATER VAPOR TRANSMISSION AND POSSIBLE SURFACE CONDENSATION. INSULATION RESISTANCE MEASURED ON A HORIZONTALPLANE IN ACCORDANCE WITH ASTM C518 AT A MEAN TEMPERATURE OF 75°F AT THE INSTALLED THICKNESS.b.SEE INTERNATIONAL MECHANICAL CODE SECTIONS 603.12 AND 604 FOR FURTHER DETAILS ON DUCT INSULATION REQUIREMENTS.c.INCLUDES ATTICS ABOVE INSULATED CEILINGS, PARKING GARAGES AND CRAWL SPACES.MEÁSOFBEWASHNI NC SE SSRIEOG4NI 8SA2T6LE4REEND G I16 2026REVISIONS.BID SET. CIT OF LA E STEVENS.EVERGREEN BUILDING1051 20TH ST SELA E STEVENS WASHINGTON....NH24 36N2026.01.16.SCHEDULES.M0.3TAGSHEETLOCATIONFCU-1FCU-2FCU-3FCU-4FCU-5FCU-6FCU-7FCU-8FCU-9M2.1M2.1M2.1M2.2M2.2M2.2M2.2M2.2M2.2AREA SERVEDWELLNESS CENTER302 OFFICE301 PASSPORT ID322 OFFICE323 OFFICE324 MEETING ROOM325 KITCHENETTE326 BUILD ROOMIT / SECURED STORAGEBASIS OF DESIGN(DAIKIN)NOMINALTONNAGEFXAA24AAVJU2.0FXAA05AAVJU0.4FXAA07AAVJU0.6FXAA05AAVJU0.4FXAA05AAVJU0.4FXAA05AAVJU0.4FXAA07AAVJU0.6FXAA05AAVJU0.4FXSA18AAVJU1.5TYPEWall Mounted UnitWall Mounted UnitWall Mounted UnitWall Mounted UnitWall Mounted UnitWall Mounted UnitWall Mounted UnitWall Mounted UnitConcealed Ducted (Medium Static)VARIABLE REFRIGERANT VOLUME - INDOOR UNIT SCHEDULECONNECTED TO:SUPPLY FANCOOLING CAPACITYCONDENSING UNITZONE CHANGEOVERDEVICEAIR FLOWRATEcfmTOTALBTU/hSENSIBLEBTU/hENTERING AIR°F DB °F WBVRV-1VRV-1VRV-1VRV-1VRV-1VRV-1VRV-1VRV-1VRV-1YESYESYESYESYESYESYESYESYES67020,63214,59475.063.02475,0044,26875.063.02826,4335,26975.063.02475,0044,26875.063.02475,0044,26875.063.02475,0044,26875.063.02826,4335,26975.063.02475,0044,26875.063.060015,72911,94375.063.0HEATING CAPACITYTOTALBTU/hENTERINGAIR°FdbPOWERSUPPLYVoltage - PhaseELECTRICALMin CircuitAmpsMax OvercurrentProtectionMCAMOP26,49970.0208-230V 1ph0.615.06,48370.0208-230V 1ph0.315.08,50070.0208-230V 1ph0.315.06,48370.0208-230V 1ph0.315.06,48370.0208-230V 1ph0.315.06,48370.0208-230V 1ph0.315.08,50070.0208-230V 1ph0.315.06,48370.0208-230V 1ph0.315.020,00070.0208-230V 1ph1.615.0NOTES:1. PROVIDE BUILT-IN CONDENSATE PUMP FOR FCUs. PROVIDE SEPARATE CONDENSATE PUMP FOR DUCT COILS.2. PROVIDE MERV 13 FILTERS AND FILTER BOXES TO BE SIZED TO MINIMUM PRESSURE DROP DUE TO INCREASED FILTRATION.3. STANDARD LIMITED WARRANTY: 10-YEAR WARRANTY ON COMPRESSOR AND ALL PARTS.4. SEE PLANS FOR THERMOSTAT/ROOM SENSOR LOCATIONS.DIMENSIONSWxHxDinch44.1 x 11.6 x 9.833.8 x 11.6 x 9.833.8 x 11.6 x 9.833.8 x 11.6 x 9.833.8 x 11.6 x 9.833.8 x 11.6 x 9.833.8 x 11.6 x 9.833.8 x 11.6 x 9.839.4 x 9.6 x 31.5WEIGHTNetlbs35.026.527.026.526.526.527.026.581.6NOTES1-41-41-41-41-41-41-41-41-4ACCESSORIESBRC1NRV71 (1)BRC1NRV71 (1)BRC1NRV71 (1)BRC1NRV71 (1)BRC1NRV71 (1)BRC1NRV71 (1)BRC1NRV71 (1)BRC1NRV71 (1)BRC1NRV71 (1)VARIABLE REFRIGERANT VOLUME - AIR-COOLED CONDENSING UNIT SCHEDULETAGAREA SERVEDVRV-1OFFICESBASIS OF DESIGN NOMINAL(DAIKIN)TONNAGEDESCRIPTIONREYA72AATJA6Air cooled heat recovery (1)COOLING CAPACITYBTU/h68,388AMBIENT DESIGN(°F DB)85HEATING CAPACITYBTU/h82,145AMBIENTDESIGN(°F DB / WB)19.0/17.0REFRIGERANT CHARGEFactory Charge Add'l Refrigerant(lbs)(lbs)23.4N/ACONNECTIONRATIO(%)113.9ELECTRICALVOLTAGE-PHASEMIN CIRCUITAMPS (MCA)MAXOVERCURRENTPROTECTION (MOP)RUNNINGCURRENT(RLA)FAN COMPRESSORINVERTER DRIVEINPUT(FCIDI)mod#1mod mod#2 #3totalmod#1mod#2mod#3totalmod#1mod mod#2 #3totalmod mod mod#1 #2 #3total208V - 230V 3ph 33.033.0 35.035.00.00DIMENSIONS(WxHxD)(inch)36.6 x 65.4 x 30.1WEIGHT(lbs)524.7EER15.7/12.8EER2N/ANOTES:1. MANUFACTUERE MUST BE CERTIFIED, LISTED, AND LABELED PER AHRI 1230.2. SYSTEM RATING DATA BASED ON DESIGN AMBIENT CONDITIONS FOR COOLING AND FOR HEATING.3. SUBMITTED PERFORMANCE DATA MUST BE FULLY DE-RATED FOR ALL COMPONENTS AND ACCESSORIES, INCLUIDNG BUT NOT LIMITED TO, LINE LENGTH, VERTICAL SEPARATION, CONNECTION RATIO, DESIGN CONDITIONS, CONDENSER COIL COATING.4. CONDENSING UNITS MUST HAVE FULLY MODULATING INVERTER COMPRESSORS.5. CONDENSING UNITS MUST HAVE AUTO CHANGEOVER FUNCTIONS.6. DEMAND LIMIT RELAY CONTACT MUST BE PROVIDED.7. EEV ACTUATORS MUST BE REMOVEABLE VALVE BODY WITHOUT DISTURBING THE REFRIGERANT SYSTEM.8. FCU THERMOSTATS MUST PROVIDE +/- 1 DEGREE OF DEAD-BAND SET-POINT AND CONTROL CAPABILITY.9. SYSTEM SHALL BE PROVIDED WITH I-TOUCH MANAGER CONTROLLER WITH WEB BASED SOFTWARE FOR DISPLAYING UP TO 8 DIII-NET SYSTEMS WITH 128 INDOOR UNITS PER SYSTEM. PC BY OTHERS.10. MANUFACTURERS SUBMITTAL MUST INCLUDE REFRIGERANT PIPING DIAGRAM WITH PIPE DIAMGETERS, LENGTHS, AND REFRIGERANT VOLUME.11. SUBSITUTE MANUFACTURERE SHALL BE RESPONSIBLE FOR ADDITIONAL PIPING AND REFRIGERANT.12. CONTRACTOR TO VERIFY PIPING DIMENSIONS.13. INSTALLING CONTRACTOR MUST HAVE SUCCESSFULLY COMPLETED MANUFACTURERS CERTIFIED INSTALLATION CLASS WITHIN PAST 36 MONTHS.14. CONTRACTOR TO FURNISH AND INSTALL INSULATION ON REFRIGERANT PIPING.15. MANUFACTURERS REPRESENTATIVE MUST HAVE LOCAL STOCK OF PARTS AND FACTORY CERTIFIED TECHNICIAN ON STAFF.16. MANUFACTURERS REPRESENTATIVE SHALL PROVIDE PROOF OF ONGOING INSTLLATION TRAINING AT THEIR LOCAL FACILITY FOR AT LEAST THE PAST 5 YEARS.17. MANUFACTURER MUST PROVIDE 10 YEARS PARTS WARRANTY ON ALL FCUS, CONDENSING UNITS, MODE CHANGEOVER DEVICES AND ZONE CONTROLS. WARRANTY CONDITIONS MUST BE CLARIFIED DURING SUMBITTAL PHASE.18. 3-PHASE AIR COOLED CONDENSING UNITS MUST HAVE PUBLISHED PERFORMANCE DATA WITH 200% INDOOR CONNECTED CAPACITY.19. CONDENSING UNITS MUST BE FURTNISHED WITH PROTECTIVE COIL COATING TO WITHSTAND ASTM B117 SALT SPRAY TEST FOR A MINIMUM OF 1000 HOURS. PERFORMANCE OF SYSTEM MUST BE DE-RATE FOR COIL COATING.EFFICIENCY (NonDucted/Ducted or Specific Combo)NOTES ACCESSORIESIEER28/23COP47 COP17 SCHE SEER SEER2 HSPF HSPF24.4/3.6 2.5/2.4 26.1/22 N/AN/AN/AN/AEQUIP IDSHEETLOCATIONAREA SERVEDBASIS OF DESIGNMAKEMODELCFMERV-1M1.1BUILDINGRENEWAIREHE10800NOTES:1. PROVIDE SEISMIC CALCULATOINS FOR EQUIPMENT OVER 400 LBS.2. UNIT SHALL OPERATE PER BUILDING OPERATING SCHEDULE.3. UNIT SHALL BE CONTROLLED THROUGH STANDALONE PACKAGED CONTROLS.4. PROVIDE UNIT MOUNTED ELECTRICAL CONTROL BOX.5. PROVIDE CONDENSATE DRAIN PIPING, FIELD COORDINATE ROUTING.6. PROVIDE CURB FOR MOUNTING ON PAD.SUPPLYW/CFMTSP0.46FANSENERGY RECOVERY UNIT SCHEDULEEXHAUSTELECTRICALVOLTAGE PHASE HZ MCA MOP RLAESP CFM W/CFM TSP ESPFLA RFSSENSIBLE EFFECTIVENESSWINTERSUMMERFILTERSOARAOPERATINGWEIGHTLBSNOTES0.75 8000.46-0.752081603.915---6969MERV 13 MERV 83031-6EQUIP IDS-1S-2S-3R-1R-2SERVICESUPPLYSUPPLYSUPPLYRETURNRETURNGRILLE, RESISTER, DIFFUSER SCHEDULEBASIS OF DESIGNMODELFACE SIZECONNECTIONSIZECFM RANGEDEFLECTIONPRICEPRICEPRICESDCA610SDCA12x12-24x24610x81278-137140-320314-707-DOUBLE-MOUNTINGCEILINGDUCT/WALLCEILINGPRICE530PRICE53024x1224x20360-720622-933SINGLESINGLECEILINGDUCT/WALLVARIABLE REFRIGERANT VOLUME - ZONE HEAT RECOVERY DEVICE SCHEDULETAGSHEETLOCATIONBASIS OF DESIGN(DAIKIN)CONDENSING UNITSERVEDBS-1M2.2BSF4A54AAVJVRV-1BS-2M2.2BSF6A54AAVJVRV-1NOTES:1. UNLIMITED NUMBER OF PORTS PER BOX OR SYSTEM.2. NO DRAIN PIPING NEEDED.3. STANDARD LIMITED WARRANTY: 10-YEAR WARRANTY ON ALL PARTS.VOLTAGE-PHASEMIN CIRCUITAMPS (MCA)208-230V 1ph1.2208-230V 1ph1.9MAXOVERCURRENTPROTECTION(MOP)1515MAX CAPACITY DIMENSIONS (WxHxD WEIGHT(per Port)inch)(lbs)54,00054,00019.3 x 9.5 x 27.772.833.4 x 9.5 x 27.799.2ZONE SERVEDACCESSORIESKHFP26A100CA (1)EQUIP ID SHEET LOCATIONAREA SERVEDLOCATIONEF-1M2.1WC 104CEILINGNOTES:1. PROVIDE DIAL FOR SPEED CONTROL.2. PROVIDE DISCONNECT SWITCH.3. PROVIDE WALL MOUNTED ON/OFF SWITCH.4. PROVIDE CEILING GRILLE.5. PROVIDE WALL DISCHARGE CAP.CFM75ESP(IN WG)0.5FANRPM754HP128wEXHAUST FAN SCHEDULEELECBHPVOLTSPHFLA0.0311511.8MCA2.2MOP15FAN TYPECEILINGDRIVE TYPEDIRECTBASIS OF DESIGNMAKEGREENHECKMODELSP-B150OPERATINGWEIGHTLBS10NOTES1-5EQUIP ID SHEET LOCATIONCF-1M2.2AREA SERVEDWELLNESSLOCATIONCEILINGCEILING FAN SCHEDULEBASIS OF DESIGNFANMAKEMODELDIAAREA COVERAGEFTSQFTHUNTERECO81600RPMNOTES:1. PROVIDE WALL CONTROLLER WITH LOCKABLE COVER.2. CONNECT FAN CONTROLLER TO BUILDING FIRE ALARM SYSTEM.3. PROVIDE WITH EXTENSION TUBE, FIELD VERIFY TUBE LENGTH AND COORDINATE LENGTH WITH LIGHT FIXTURES, STRUCTURE, SPRINKLER.4. CONFIRM COLOR WITH ARCHITECT PRIOR TO ORDERING.ELECTRICALHPVOLTSPH12083OPERATINGWEIGHTNOTESFLALBS3.5871-4LOW PRESSURE DUCT SIZING REFERENCE TABLEROUND DUCTDUCT LOSS/100 FTCFM MINCFM MAX40.0803060.08308080.0880200100.08200395120.08395600140.08600850160.088501200180.0812001600200.0816002200220.0822002800240.0828003600MEÁSOFBEWASHNI NC SE SSRIEOG4NI 8SA2T6LE4REEND G I16 2026REVISIONS.BID SET. CIT OF LA E STEVENS.EVERGREEN BUILDING1051 20TH ST SELA E STEVENS WASHINGTON....NH24 36N2026.01.16.SCHEDULES.M0.4
- Commodity Codes
-
- NAICS 238220Plumbing, Heating, and Air-Conditioning Contractors
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
New Carrollton BAS JACE Repla...
SEP Program: Solicitation Name: New Carrollton BAS JACE Replacement SEP %: Solicitation ID:
Washington Metropolitan Area Transit Authority
Bid Due: 7/16/2026
U.S. Coast Guard Pease Buildi...
Follow U.S. Coast Guard Pease Building Mini-Split HVAC System Install Active Contract Opportunity
HOMELAND SECURITY, DEPARTMENT OF
Bid Due: 7/06/2026