Addendum No. 1 26-FAC-0076 Roof Replacement @ Ellis L. Marsalis Jr. School (6.23.26)
Project Information
- Bid Title
- Addendum No. 1 26-FAC-0076 Roof Replacement @ Ellis L. Marsalis Jr. School (6.23.26)
- Issuing Agency
- NOLA Public Schools
- Location
- Louisiana
- Published Date
- Jun 23, 2026
- Closing Date
- Jun 27, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
- Attachment Preview
-
Mark I. Baum Architect LLCAddendum 1Project Nos.: Architect: 25-010, OPSB: ITB #26-FAC-0076Project Name: Roof Replacement at Ellis L. Marsalis, Jr. SchoolLocation:5625 Loyola AvenueNew Orleans, LA 70115Date: June 23, 2026The following shall be a permanent part of the Bidding and Contract Documents for the abovereferenced Project.This Addendum consists of sixty-one (61 xpages intentionally left blank), as follows:(excludingAddendum 1 (2 Pages)Attachment: Pre-Bid Conference Minutes (4 Pages)Attachment: Pre-Bid Conference Sign-In Sheet (2 Pages)Orleans Parish School Board Instructions to Bidders, dated 3.2026 (13 pages)NOLA Public Schools Post-Bid Document Checklist (1 Page)OPSB Disadvantaged Business Enterprise (DBE) Program (37 pages)Louisiana Department of Revenue Sales Tax Exempt Certificate Form R-1020. (1 page)Drawing Sheet A-2.1, Revision 1, dated 6/22/26 (1 sheet)GENERAL1.01 PRE-BID CONFERENCEThe Minutes and Sign-In Sheet of the Pre-Bid Conference held on Thursday, June 18, 2026 are attachedherewith. The Pre-Bid Conference Minutes, Sign-In Sheet, and Agenda are not Bidding Documents andinformation contained therein shall not be part of nor modify the Contract requirements.1.02 PRIME BIDDERSPrime Bidders are requested to register as Prime Bidders in the City Blueprint Plan Room.1.03 PRE-BID SITE VISITSAn additional opportunity to visit the site has been established for:Thursday, June 25, 2026, at 10:00 11:00 AM CDTThis will be the only date and time available for pre-bid site visits. Please note that in submitting a bid,declares and representshas personally inspected and is familiar with the projectsite1.04 PROJECT BUDGETthe range of $1,000,000.00 1,150,000.00.ADDENDUM 1June 23, 2026Page 1 of 2Mark I. Baum Architect LLCCHANGES TO THE PROJECT MANUAL1.05 TABLE OF CONTENTS: Under Division 00 PROCUREMENT AND CONTRACTING REQUIREMENTS:1)-Orleans Parish SchoolBoard Instructions to Bidders.2)to follow DBE PolicyProvisions and Procedures for all OPSB Solicitations.1.06 DIVISION 00 - INSTRUCTIONS TO BIDDERS: Delete the Orleans Parish School Board Instructionsto Bidders included in the Project Manual in its entirety and replace with the attached OrleansParish School Board Instructions to Bidders, dated 3.2026. (13 pages)1.07 DIVISION 00: Add the NOLA Public Schools Post-Bid Document Checklist (1 Page) to follow theOrleans Parish School Board Instructions to Bidders in the Project Manual1.08 DIVISION 00 OPSB DISADVANTAGED BUSINESS ENTERPRISE PROGRAM: Delete all documentsOPSB Disadvantaged Business Enterprise (DBE) Programentirety and replace with the attached OPSB Disadvantaged Business Enterprise (DBE) Programdocuments. (37 pages)1.09 DIVISION 00 LOUISIANA DEPARTMENT OF REVENUE SALES TAX EXEMPT CERTIFICATE FORM:Delete the Louisiana Department of Revenue Sales Tax Exempt Certificate Form R-1020 includedin the Project Manual and replace with the attached Louisiana Department of Revenue Sales TaxExempt Certificate Form R-1020. (1 page)1.10 SECTION 01 10 00 SUMMARY:1.11 SECTION 070150.19 PREPARATION FOR RE-ROOFING: At the following under Paragraph 1.3 A.:1. Contractor shall verify all existing conditions prior to submitting a bid and shall be solelyresponsible for existing conditions, including all quantities of materials to be removed.2. Existing roofing system may be constructed as follows:a. Approximately,b. Tapered insulation at unspecified locations, thicknesses, and extents, adhered,c. Cover Board, adhered,d. 2-ply, modified bitumen roofing systeme. Modified bitumen flashingsf. Metal copings.CHANGES TO THE DRAWNGS1.12 Sheet A-2.1 ROOF PLAN , is hereby re-issued as Revision 1, dated 6/22/2026, providingclarification regarding extents of tapered insulation to be provided.END OF ADDENDUM 1ADDENDUM 1June 23, 2026Page 2 of 2Mark I. Baum Architect LLCMinutes: PRE-BID CONFERENCEProject #s:Architect: 25-010, OPSB: 26-FAC-0076Project Name: Roof Replacement @ Ellis L. Marsalis, Jr. SchoolLocation:5625 Loyola AvenueNew Orleans, LA 70115Date: Thursday, June 18, 2026Time: 10:00 AM CDTA. Introduction:1. Owner: Orleans Parish School Boarda. Greg Narlock, Director of Capital Projects In attendanceb. Angela Zarders, Assistant Director of Procurement | Construction In attendancec. Jonathan Temple, Director of Office of Business Partnerships Not in attendanced. Lou Brown, Procurement Manager Not in attendancee. Derrick James, Project Manager Not in attendance2.sa. Bartek Skowron, Design Director, Manning Not in attendanceb. Marsden L. Moran, Manning Not in attendancec. Lisa C. Herron, NCIDQ, Director of Strategy and Growth, Manningd. Ray Lauga, PMP, Project Manager, One Atlas In attendancee. Kristen McAllister, Senior Project Manager, One Atlas Not in attendancef. Cyril Duplessis, Project Manager, Circular Consulting, LLC Not in attendance3. Tenant Charter School: The Willow Schoola. Kendrick Miller, Director of Facilities In attendanceb. Michael Taylor, Facilities Manager Not in attendance4. Architect: Mark I. Baum Architect LLCa. Mark I. Baum, Architect, AIA In attendanceB. General Site/Building Description:1. Location:5625 Loyola Avenue, New Orleans, LA 701152. Existing Building:Approximately 80,131 gross square feet, 3-story middle school.3. Existing Construction: Type II-B, non-protected, non-sprinklered.C. Instructions to Bidders:1. Construction Time: One Hundred Twenty (120) Consecutive Calendar Days.2. Liquidated Damages:a. $250/day through Substantial Completion, andb. $250/day commencing sixty (60) days after Substantial Completion through Final Completion.3. Bid Documents: Available through the Project Planroom at City Blueprint & Supply Company, inaccordance with the Advertisement for Bids.a. Deposit: NonePage 1 of 4Mark I. Baum Architect LLCb. Prime Bidders: Must register as a Prime Bidder.4.(Mr. Jonathan Temple Ms. Angela Zarders)a. 35% Participation Goalb. Refer to Project Manual, Division 00, OPSB DBE Program documents.Revisions to Disadvantaged Business EAddendum 01.Program requirements shall be issued inAttendees were advised that the required Post-Bid Document submissions may not be submittedelectronically. Post-Bid Document submissions must be submitted by US Mail or in person and that theOrleans Parish School Board shall not be responsible for late receipt of any Post-Bid Documentsubmissions.5. Prior Approvals and Requests for Clarification:a. Requests for Clarifications shall be submitted in writing via email to the Architect and toJonathan Temple, Director of Business Partnerships, jtemple@nolapublicschools.com, inaccordance with Paragraph 4.2 of the Instructions to Bidders. Must be received at least ten(10) days prior to Bid Date/Time per ITB 4.2.2.Requests for Clarification shall be submitted only to the Architect at Mark@MIBArch.com.DEADLINE FOR SUBMISSION OF REQUESTS FOR CLARIFICATION IS 1:00 PM CDT ON JUNE 27, 2026.b. Substitutions: Prior Approvals shall be submitted in writing via email to the Architect, inaccordance with Paragraph 4.3 of the Instructions to Bidders, and Section 01 25 00Substitution Procedures. Must be received at least seven (7) days prior to Bid Date/Time perITB 4.3.2.DEADLINE FOR SUBMISSION OF SUBSTITUTION REQUESTS IS 1:00 PM CDT ON JUNE 30, 2026.1) No post-bid Substitutions for Convenience are permitted by Contract.6. Addenda: Shall be distributed by email to all plan holders of record and shall be posted on theOrleans Parish School Board website.7. Bidding Procedures: Refer to the Instructions to Bidders for complete information.a. Submit with Bid (ITB Article 5):1) Louisiana Uniform Public Work Bid Form2) Louisiana Uniform Public Work Bid Form Unit Price Form3) Bid Security (Bid Bond or certified/cashi4) Corporate Resolution5) Name of Project,, Address and License # on the envelope.b.Representation (ITB Article 3):1) Bid is made in accordance with the Bidding Documents2) Visited the Project site3) Bid is based on Bidding Documents, as modified by Addenda4) Bid is not based on verbal instructionsc. Post Bid Submittals (ITB Article 6):1) Attestation Clause Form2) DBE Responsiveness Forms 1 & 23) DBE Post Bid Pre-Construction Compliance Certification Checklist4) DBE Certification LettersPage 2 of 4Mark I. Baum Architect LLC5) Non-Collusion Affidavit Form6) EDGAR Federal Compliance Provisions FormRevisions to DBE requirements shall be issued in Addendum 01.8. License Classification: Classification 1 - Building Construction9. Bids Due and Bid Opening:a. Time: Tuesday, July 7, 2026, at 1:00 PM CDTb. Location:Procurement Department2401 Westbend Parkway, Room 5055New Orleans, LA 70114c. By Mail or Courier: Mr. Paul Lucius, Orleans Parish School Board (same address)D. Contracting1. Form of Agreement:a. AIA Document A101TM 2017 Standard Form of Contract Between Owner and Contractorb. AIA Document A101TM 20172. General Conditions: AIA Document A201TM 2017 General Conditions, OPSB modified3. Bonds:a. AIA Document A312TM 2010 Performance Bondb. AIA Document A312TM 2010 Payment BondE. OverviewThe Scope of Work (SOW) and Contract Requirements generally consist of, without limitation, thefollowing:1. Architecturala. Complete tear-off and replacement of roofing and flashings, totaling approx.. 27,114 SF,b. Repairs to existing stone pediment over main school entrance,c. Installation of fixed stanchions for existing rooftop ductwork,d. Miscellaneous scope as indicated in the Contract Documents.2. Structurala. Framing for roof access penthouse.3. Mechanical and Electricala. Temporary removal and re-installation of mechanical and electrical equipment and conduitas required to facilitate re-roofing.b. Temporary disconnection and reconnection of photovoltaic panels as required to facilitate re-roofing.4. ALTERNATE #1: Construction of a penthouse to improve roof access.5. All permits, inspections, close-out documents, warranties, as-built documents, O&M manuals, andother contractual requirements.6. Contractual Requirements: All permits, inspection, close-out, warranty, as-built documents, andother contractual requirements.7. Division 00 Bidding and Contract Requirementsa. OPSB Instructions to BiddersPage 3 of 4
- Commodity Codes
-
- NAICS 238160Roofing Contractors
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
GIWW ? Gulf Intracoastal Wate...
Follow GIWW ? Gulf Intracoastal Waterway, Algiers Lock, New Maintenance Building, Orleans Parish,
DEPT OF DEFENSE
Bid Due: 7/14/2026
Addendum No. 2 26-FAC-0076 Ro...
Addendum No. 2 26-FAC-0076 Roof Replacement at Ellis L. Marsalis Jr. School (6.25.26)
New Orleans Public Schools
Bid Due: 7/07/2026