Sidewalk Replacement 2026
Project Information
- Bid Title
- Sidewalk Replacement 2026
- Issuing Agency
- Town of Middlebury
- Location
- Vermont
- Published Date
- May 27, 2026
- Closing Date
- Jun 18, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Sidewalk Replacement 2026
- Attachment Preview
-
TOWN OF MIDDLEBURY2026 SIDEWALK CONTRACTMIDDLEBURY, VERMONTScope of Work/Project NarrativeProject Goal – The primary goal of the project is to remove and replace concrete sidewalks in targetedlocations throughout the community to improve pedestrian safety, accessibility, and overallinfrastructure quality.Engineers Role – This is a rehabilitation project being completed under the Town’s normal operationand maintenance activities. The Contractor will work directly with the Town and their staff to replaceselected deteriorating, uneven, and uncompliant sidewalks. Engineer will provide part-time onsitereview to allow Contractor to discuss potential issues during the construction process.Project Funding – This project is funded by the Town. There are no State or Federal fundingrequirements. Vermont labor laws apply.Project Completion – The Town anticipates awarding the contract 45 calendar days after the bidopening. The project is expected to be completed in full this construction season (2026), prior toNovember 1st, 2026.Project Components – The project consists of all work necessary to remove and replace concretesidewalks that the Town has selected for rehabilitation, the work includes the following:• Seminary Street Ext.a. Replacement of forty-five panels (225ft) that run consecutively. Starting point is anorange paint mark with an arrow pointing East located on the sidewalk in front of #60Seminary St Ext. The end point will be an orange paint mark with an arrow pointing Westlocated on the sidewalk just East of Old College Farm Rd. This section also includes thefollowing replacements:b. Replacement of 2 panels (10ft) in front of 66 Seminary Street Ext.c. Replacement of 7 panels (35ft) in front of 68 Seminary Street Ext.d. Replacement of 11 panels (55ft) in front of 72 Seminary Street Ext.• Washington Street Ext.a. Replacement of 104 panels (520ft) that run consecutively. Starting point is an orangepaint mark with an arrow pointing south located on the sidewalk south of the southernentrance to Colonial Dr. The end point will be an orange paint mark with an arrowpointing north located on the sidewalk in front of the cemetery.Note: leave the two asphalt driveway entrances as is at the animal hospital.• Seymour Streeta. Replacement of thirty panels (150ft) that run consecutively. Starting point is an orangepaint mark with an arrow pointing north located on the sidewalk in front of #12Seymour St. The end point will be an orange paint mark with arrow pointing southlocated in front of #18 Seymour St.TOWN OF MIDDLEBURY – 2026 SIDEWALK CONTRACTOtter Creek Engineering, Inc.Page 1© 2026• 60 Court Streeta. 1 panel (5ft)• 64 Court Streeta. 3 panels (15ft)• 202 Weybridge Streeta. 3 panels (15ft)• 669 Weybridge Streeta. 4 panels (20ft)• 681 Weybridge Streeta. 4 panels (20ft)• 93 Monroe Streeta. 26 panels (130ft) & concrete curb install• Main Street and Mill Street Intersectiona. 4 panels (20ft) & granite curb reinstall• Buttolph Drivea. 19 panels (95ft)• Elm Streeta. 4 panels (20ft)The Town of Middlebury will mark locations using paint that directs the Contractor to the limits ofreplacement. It is the Contractors responsibility for confirming the scope of replacement for each sitewith the Town of Middlebury before conducting any work. Contractors must provide all concrete slipsto the Town of Middlebury and Otter Creek Engineering.Project Drawings - A concrete sidewalk detail is enclosed. Refer to the technical specifications for moredetail.Pre-Bid Meeting – A pre-bid conference will be held at 1:00 pm local time on Monday, June 1, 2026,at the Town of Middlebury Public Works Office at 1020 Route 7 South, Middlebury, VT 05753,Attendance at the pre-bid conference is mandatory.Questions during Bid - Questions shall be emailed to Cathy Foutch of Otter Creek Engineering atFoutch@ottercrk.com by June 11, 2026. Contractors are encouraged to copy Robert M. Clark, P.E.,Clark@ottercrk.com.Bid Due Date, Time and Location - Sealed Bids for the 2026 Sidewalk Contract will be received by theTown of Middlebury 1020 Route 7 South, Middlebury, VT 05753, until 1:00pm local time on June 18,2026. Bids received will be “publicly” opened and read. The Owner envisions selecting the Contractorwithin 45 calendar days.Insurance Requirements – The insurance required shall provide coverage for not less than thefollowing amounts, or greater, where required by Laws and Regulations:TOWN OF MIDDLEBURY – 2026 SIDEWALK CONTRACTOtter Creek Engineering, Inc.Page 2© 20261. Workers’ Compensation, and related coverages:State:StatutoryFederal, if applicable (e.g., Longshoreman’s):StatutoryEmployer’s Liability:Bodily injury, each accident$$1,000,000Bodily injury by disease, each employee $ $$1,000,000Bodily injury/disease aggregate $$$1,000,000Foreign voluntary worker compensation$Statutory2. Contractor’s Commercial General Liability:General Aggregate$$2,000,000Products - Completed Operations Aggregate $$1,000,000Personal and Advertising Injury$$1,000,000Each Occurrence (Bodily Injury and PropertyDamage)$$1,000,0003. Automobile Liability :Bodily Injury:Each person$$1,000,000Each accident$$1,000,000Property Damage:Each accident$$1,000,0004. Excess or Umbrella Liability:Per Occurrence$$1,000,000General Aggregate$$1,000,0005. Contractor’s Pollution Liability:Each Occurrence$$1,000,000General Aggregate$$1,000,000 If box is checked, Contractor is not required to provide Contractor’s PollutionLiability insurance under this ContractBond Requirements - Performance BOND and Payment BOND each in the amount of 100% of thecontract price are required.Basis of Contract Award – Owner reserves the right to reject any or all Bids, including withoutlimitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner will reject the Bid ofany Bidder that Owner finds, after reasonable inquiry and evaluation, to not be responsible. If Bidderpurports to add terms or conditions to its Bid, takes exception to any provision of the BiddingDocuments, or attempts to alter the contents of the Contract Documents for purposes of the Bid, thenTOWN OF MIDDLEBURY – 2026 SIDEWALK CONTRACTOtter Creek Engineering, Inc.Page 3© 2026the Owner will reject the Bid as nonresponsive; provided that Owner also reserves the right to waive allminor informalities not involving price, time, or changes in the Work.If Owner awards the contract for the Work, such award shall be to the responsible Bidder submitting thelowest responsive Bid.On Going Operations – Work is expected to take place in areas of heavy foot traffic. Contractors are tobe aware of the surrounding areas when conducting pours. Contractor will be responsible formaintaining the site until the sidewalk is ready for resumed foot traffic.Safety - Contractor is responsible for maintaining a secure and safe area around the poured concreteto limit premature contact with the public. It is the responsibility of the Contractor to provide alternativeroutes for pedestrians for the duration of the construction project including proper signage andmarkings.Payment Terms – Bid Items will be paid on a unit items basis. Descriptions are to assistbidders/contractors and are not, or intended to be, a complete list of all necessary components,quantities, etc., required to complete work in accordance with the Drawings and Specifications. Ownerand Contractor shall agree to a payment schedule, given that some work will not occur until thesummer of 2026. Contractor shall submit a written schedule for payment. Not more than 10% ofthe contract price will be withheld until final completion occurs.Bid Item Descriptions – Contractor shall refer to the technical specifications when selectingcomponents for installation.Item 1.0 - SidewalkThe unit price for this Item shall include the installation of sidewalk and all associatedwork as indicated on the Drawings and in the Specifications. The work for this itemincludes, but is not limited to, the following:• Removal of existing sidewalk,• Saw cutting existing sidewalk,• Excavation and backfill,• Gravel base and subbase,• Associated earthwork, as previously described,• Furnishing and installing of concrete sidewalk,• Furnishing and installing of ADA compliant concrete ramps,• Furnishing and installing detectable warning surface (truncated domes),• Restoration of surfaces.Item 1.1 - Concrete SidewalkPayment will be based upon the actual square yardage of concrete sidewalkincorporated in the completed work.Item 2.0 - CurbTOWN OF MIDDLEBURY – 2026 SIDEWALK CONTRACTOtter Creek Engineering, Inc.Page 4© 2026The unit price for this Item shall include the installation of curb and all associated workas indicated on the Drawings and in the Specifications. The work for this Item includes,but is not limited to, the following:• Removal of existing curb in area of proposed curb,• Saw cutting, adjusting and fitting existing facilities,• Excavation and backfill,• Concrete base/supports for Granite Curb and Marble Curb• Gravel base and subbase,• Associated earthwork, as previously described,• Furnishing and installing of curb,• Restoration of surfaces.Item 2.1 - Concrete CurbPayment will be based upon the actual lineal footage of curb incorporated in thecompleted work.Item 2.2- Granite Curb (Remove and Reset)Payment will be based upon the actual lineal footage of curb incorporated in thecompleted work.TOWN OF MIDDLEBURY – 2026 SIDEWALK CONTRACTOtter Creek Engineering, Inc.Page 5© 2026
- Commodity Codes
-
- NAICS 237310Highway, Street, and Bridge Construction
- NAICS 238110Poured Concrete Foundation and Structure Contractors
- NAICS 238990All Other Specialty Trade Contractors
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Bay Street Water, Sewer & Sto...
Bay Street Water, Sewer & Storm Improvements, St. Johnsbury, VT Request Date: 6/25/2026
State Government of Vermont
Bid Due: 7/23/2026
Paving Project Request Date: 6/22/2026 1:46:08 PM Open Date: Closing Date: 7/8/2026 1:00
State Government of Vermont
Bid Due: 7/08/2026