Sommette Distribution Improvements Project ? Final Paving
Project Information
- Bid Title
- Sommette Distribution Improvements Project ? Final Paving
- Issuing Agency
- Tuolumne Utilities District
- Location
- California
- Published Date
- May 22, 2026
- Closing Date
- Jun 12, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Sommette Distribution Improvements Project – Final Paving
Project Description
Tuolumne Utilities District (TUD) is seeking qualified contractors for the Sommette Distribution Improvements Project – Final Paving. The project scope includes 18,650 sf of trench paving and 12 concrete collars.Proposal Due Date:
June 12, 2026, at 2:00 PM local time.Bids
Sealed proposals for the construction of the Sommette Distribution Improvements Project – Final Paving addressed to the Tuolumne Utilities District, 18885 Nugget Boulevard, Sonora, California 95370, will be received at the office of the District until 2:00 p.m., local time, on June 12, 2026, and will then be publicly opened and read.Project Documents:
Contract Documents – Sommette Distribution Improvements Project – Final PavingFor information concerning the proposed work, contact: Mr. Tim McCormick, Engineering Technician, at (209) 532-5536, extension 550 or tmccormick@tudwater.com.
- Attachment Preview
-
CONTRACT DOCUMENTSSommette Distribution Improvements Project – Final PavingTUOLUMNE UTILITIES DISTRICTMay 2026This page is intentionally left blank.TABLE OF CONTENTSPART 1BIDDING REQUIREMENTSInvitation to Bid ......................................................................................... B-1Instructions to Bidders .............................................................................. B-3Bidder's Checklist ..................................................................................... B-10Bid Form ................................................................................................... B-11Bid Schedule ............................................................................................ B-13Bid Bond ................................................................................................... B-17Construction Performance Bond .............................................................. B-19Construction Labor and Material Payment Bond...................................... B-23List of Subcontractors............................................................................... B-28Non-collusion Declaration ........................................................................ B-29Contractor Safety Agreement ................................................................... B-30Notice of Award ........................................................................................ B-31PART 2CONTRACT FORMSAgreement ................................................................................................ CF-1Workmen's Compensation Insurance....................................................... CF-5Public Works Contract Conditions ............................................................ CF-6California Labor Code: Required Provisions in Public Work Contracts .... CF-7PART 3CONDITIONS OF THE CONTRACTGeneral Conditions................................................................................... GC-1General Conditions Index ......................................................................... GC-3Article 1 - Definitions ................................................................................ GC-7Article 2 - Preliminary Matters .................................................................. GC-9Article 3 - Correlation, Interpretation & Intent of Contract Documents ..... GC-10Article 4 - Availability of Lands; Physical Conditions; Reference Points... GC-11Article 5 - Bonds and Insurance ............................................................... GC-13Article 6 - Contractor’s Responsibilities .................................................... GC-14Article 7 - Work by Others ........................................................................ GC-20Article 8 - Owner’s Responsibilities .......................................................... GC-21Article 9 - Engineer’s Status During Construction .................................... GC-21Article 10 - Changes in the Work.............................................................. GC-23Article 11 - Change of Contract ................................................................ GC-24Article 12 - Change of the Contract Time ................................................. GC-29Article 13 - Warranty and Guarantee, Tests and Inspections, Correction,Removal or Acceptance of Defective Work ........................... GC-30Article 14 - Payments and Completion ..................................................... GC-33Unconditional Waiver and Release Upon Final Payment......................... GC-39Article 15 - Suspension of Work and Termination .................................... GC-41Article 16 - Claims/Dispute Resolution ..................................................... GC-42Article 17 - Assignment of Antitrust or Unfair Business Practices Claimsto Owner Under Public Contracts Code § 7103.5 .................. GC-47Article 18 - Miscellaneous ........................................................................ GC-48i-1Supplementary Conditions ....................................................................... SC-11. Counterparts of the Agreement ....................................................... SC-12. Additional Bond ............................................................................... SC-13. Insurance Requirements for Contractor .......................................... SC-14. Specifications .................................................................................. SC-45. Drawings.......................................................................................... SC-46. Owner .............................................................................................. SC-47. Engineer .......................................................................................... SC-48. Resident Project Representative ..................................................... SC-59. Responsibility for Payment .............................................................. SC-510. Documentation to Accompany Applications for Payment ................ SC-511. Retainage ........................................................................................ SC-512. Partial Utilization .............................................................................. SC-513. Substantial Completion.................................................................... SC-614. Final Inspection and Acceptance..................................................... SC-615. Liquidated Damages........................................................................ SC-616. Correction Period............................................................................. SC-617. Overtime Work................................................................................. SC-718. Legal Addresses .............................................................................. SC-719. Test Holes ....................................................................................... SC-720. Underground Installations................................................................ SC-721. Historical or Archaeological Deposits .............................................. SC-722. Inspection by Public Agency............................................................ SC-723. Layout of Work ................................................................................ SC-724. Compaction Testing......................................................................... SC-725. Design Engineer .............................................................................. SC-826. Measurement and Payment ............................................................ SC-827. Submittals and Proposed Equivalents ............................................. SC-928. Encroachment Permit ...................................................................... SC-1229. Staging Area .................................................................................... SC-1230. Spoils Disposal ................................................................................ SC-1231. Restoration to Damage Property ..................................................... SC-1232. Preconstruction Survey ................................................................... SC-1233. Construction Facilities ..................................................................... SC-1234. Construction Water .......................................................................... SC-1235. Traffic Control .................................................................................. SC-1236. Roadway Cleaning .......................................................................... SC-1237. Permanent Striping .......................................................................... SC-1238. Project Areas and Notifications ....................................................... SC-1339. Hazardous Materials........................................................................ SC-1340. Sawcut and/or Grind ........................................................................ SC-1341. Excavation/Dig Outs ........................................................................ SC-1342. HMA Paving..................................................................................... SC-13PART 4 TECHNICAL SPECIFICATIONSDIVISION 1 GENERAL REQUIREMENTS01010 Summary of Work and Contract Considerations01140 Environmental Protection01300 Submittals01500 Construction Facilities and Temporary Controlsi-201700 Contract CloseoutDIVISION 2 SITE WORK02705 Paving and SurfacingAPPENDIX AAPPENDIX BAPPENDIX CExhibit MapTUD Standard Detail # 201Hydrant and Water Service Lateral Crossingsi-3
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
- NAICS 237310Highway, Street, and Bridge Construction
- NAICS 238990All Other Specialty Trade Contractors
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Southeast Water Pollution Con...
Bid Details RFP for DB-140 Southeast Water Pollution Control Plant - Secondary Clarifiers
San Francisco Public Utilities Commission
Bid Due: 8/05/2026
Project: TEC Modernization Addition Ref. #: 2026-1683 Type: ITB Status: Open Open Date:
Alameda-Contra Costa Transit District
Bid Due: 7/21/2026