Mist Lake Acoustical Dampening
Project Information
- Bid Title
- Mist Lake Acoustical Dampening
- Issuing Agency
- City of Durham
- Location
- North Carolina
- Published Date
- Jan 23, 2026
- Closing Date
- Feb 25, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- 26-1028
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Number: 26-1028
Bid Title: Mist Lake Acoustical Dampening
Category: Requests for Proposals/Qualifications and Services Status: Open Description: **** Pre-Bid meeting date, time and location: Wednesday February 4, 2026, at 10:00 AM:
Department of Water Management, 1600 Mist Lake Drive in Durham ****
**** Bid date, time and location: Wednesday February 25, 2026, at 10:00AM:
City of Durham Department of Water Management 1600 Mist Lake Drive, Durham, NC 27704
Attention: Bree Aguilar ****
Publication Date/Time: 1/23/2026 8:00 AM Closing Date/Time: 2/25/2026 10:00 AM Contact Person: Bree Aguilar
[email protected]Related Documents: - Attachment Preview
-
Project ManualCity of DurhamMist Lake Acoustical DampeningDurham, North CarolinaJanuary 23, 2026Owner: City of Durham101 City Hall PlazaDurham, North Carolina 27701Department of Water Management1600 Mist Lake DriveDurham, North Carolina 27704Mist Lake Acoustical DampeningDurham, North CarolinaProject ManualCITY OF DURHAM, NORTH CAROLINAMAYOR: Leonardo WilliamsCOUNCIL MEMBERS:Javiera Caballero, Mayor Pro-TemporeNate BakerShanetta BurrisMatt KopacChelsea CookCarl RistCITY MANAGER: W. BOWMAN FERGUSONCITY ATTORNEY: KIMBERLY REHBERGCITY CLERK: DIANA SCHREIBERCity of DurhamDepartment of Water ManagementProject ManualTable of ContentsBidding and Contract RequirementsPageInvitation to BiddersInstructions to BiddersBid Proposal FormNon-Collusion AffidavitBidder Safety Evaluation QuestionnaireUnderutilized Business Enterprise (UBE) Contractor FormsInsurance Requirements00 01-100 02-100 03-100 04-100 05-100 06-100 07-1Example Documents for use During ConstructionStandard Form of Agreement between Owner and ContractorSubcontractor Monthly Record of Payment ReportReimburable Sales Tax FormsContract Change Order FormClaim for Additional Time on the Basis of Adverse Weather Conditions00 08-100 09-100 10-100 11-100 12-1Contract Drawings & ReportsSeparateBidding and Contract RequirementsTable of Contents Page iCity of DurhamDepartment of Water ManagementINVITATION TO BIDDERSThe City of Durham will receive bids for theMist Lake Acoustical Dampeningby:Wednesday, February 25, 2026, 10:00am atThe City of Durham Department of Water Management,1600 Mist Lake Drive, Durham, NC 27704Attention: Bree AguilarSummary of Work:The Department of Water Management (DWM) constructed a new facility located at 1600 Mist LakeDrive, Durham, NC, that includes offices, training facilities, storage, crew spaces and repair shops.Acoustical reverberation studies have been completed to determine a recommended approach to bestreduce sound reverberation within the spaces listed.The following documents are included in the list of Scope of Work documents, as well as plansshowing the proposed layout of each product being evaluated for pricing as listed below:• Armstrong product data for Tectum Finale panels (walls and ceiling)• Cross Connection Compliance (CCC) Lab 3005 layout plan• Water & Sewer Maintenance (WSM) Meter Services Shop 3020 layout plan• Plant Engineering & Maintenance (PEM) Conference 5028 layout plan Δ• Utility Engineering (UE) Conference 1059 layout plan ΔΔ PEM Conference 5028 and UE Conference 1059 are not included in the study reportsProduct Data• Ceiling Panels:o Armstrong Tectum Finale HumiGuard Plus 1” panel with integral Minwool insert & 1”furring Mounting:• Type A for CCC Lab 3005• Type D-20 for WSM Meter Services Shop 3020o Required to be laid on ¾” furring strips Color: White Panel Size: 2’ x 4’ Edge: Long Edges Beveled / Short Edges Squared• Wall Panels:o Armstrong Tectum Finale HumiGuard Plus 1” panel with integral Minwool insert & 1”furring Mounting:• Type A for CCC Lab 3005• Type D-20 for WSM Meter Services Shop 3020o Required to be laid on ¾” furring strips Color: White Panel Size: 2’ x 4’ Edge: Long Edges Beveled / Short Edges SquaredBidding and Contract RequirementsInvitation to Bidders Page 00 01-1City of DurhamDepartment of Water Managemento Armstrong Tectum Finale 1” panel with integral Minwool insert & 1” furring Mounting:• Type A for PEM Conference Room 5028 and UE Conference Room1059 Color: White Panel Size: 2’ x 8’ Edge: Long Edges Beveled / Short Edges SquaredGeneral Notes – Applies to all work locations1.) Work to be performed during normal business hours (7am-4:30pm Monday through Friday).Working space(s) will be vacated for the contractors used during designated time for installationpreparation, execution and completion.2.) Contractor to provide all material, equipment, tools, lifts, PPE and cleaning supplies required tolayout, install and cleanup work.a. Lifts and/or rolling scaffolding can be accommodated with an exterior door into WSMMeter Services Room 3020.b. Ladder feet are not required to be equipped with booties in any locations.3.) Materials can be delivered on a pallet to WSM Meter Services Shop 3020, which is equippedwith an exterior roll-up door, but palletized materials will need to be broken down and moved bya rubber wheeled cart or carried to all other locations due to doors that are not wide enough toaccommodate pallet jacks.4.) All contractor employees should wear clothing that includes a printed company logo or someother means of identification. Employees are expected to provide all required Personal ProtectiveEquipment (PPE).5.) Contractor to provide all required protection for flooring, plumbing wet lab benches, existingfurniture & equipment within the space during the work. Final cleanup should include removalof all dust, debris and temporary protection materials.6.) Any equipment used to field cut materials should be effective at capturing dust due tocementitious and glass fiber content of specified materials. A shop vac may be provided ifequipped with the appropriate filter(s) for the Tectum products.7.) Any painting required on concealed end(s) of panels and/or furring will be completed by theOwner.Base Scope of Work1.) Cross Connection Compliance (CCC) Lab 3005a. Provide all materials and labor required to install Armstrong Tectum Finale ceiling andwall mounted panels as shown on the attached sketch for Mounting Type A (directattachment), including maintaining code required clearances around sprinkler heads asnoted on drawing.b. Existing ceiling construction is 5/8” GWB over metal studs with recessed lights andconcealed sprinkler heads – refer to provided existing conditions construction details andphotos taken during construction for further details.c. Existing wall construction is 5/8” GWB over 3-5/8” metal studs (A012) – refer toprovided existing conditions construction details and photos taken during construction forfurther details.d. Powered lifts cannot be accommodated in CCC Lab 3005. Rolling scaffolding must haveBidding and Contract RequirementsInvitation to Bidders Page 00 01-2
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
RFP: Seasonal Maintenance of ...
Bid Title: RFP: Seasonal Maintenance of Wastewater Dispersal Sites Category: Public Utilities Status:
Brunswick County
Bid Due: 7/29/2026
Janitorial Services - DIT Bui...
Solicitation Number: Doc2241144037 Project Title: Janitorial Services - DIT Building Description: DOA Facility
State Government of North Carolina
Bid Due: 7/08/2026