Public Utilities Water AMI System - RFP
Project Information
- Bid Title
- Public Utilities Water AMI System - RFP
- Issuing Agency
- City of Conway
- Location
- South Carolina
- Published Date
- Jan 13, 2026
- Closing Date
- Feb 17, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
- Public Utilities Water AMI System – RFP
- Attachment Preview
-
CITY OF CONWAYCITY OF CONWAYP.O. DRAWER 1075CONWAY, SOUTH CAROLINA 29528Phone (843) 397-2539Fax (843) 397-2883Public Utilities Water AMI SystemThe City of Conway, South Carolina is inviting Proposals from qualified vendors for theinstallation and implementation of an Advanced Metering Infrastructure (AMI) System. Thescope will include the selection and implementation of a Fixed Based System that will workeffectively with the City of Conway’s personnel and existing water infrastructure. The Cityreserves the right to delete any section from the bid as it deems appropriate.DUE DATE/TIME: Tuesday, February 17, 2026 @ 2:00 PMPOINT OF RECEIPT:City of Conwayc/o Amanda HooperPO Drawer 1075Conway, South Carolina 29528Physical Address:City of Conway - City Shop2940 Jerry Barnhill Blvd.Conway, South Carolina 29527Requests for information regarding this Request for Proposals should be directed inwriting by either letter or e-mail to the Amanda Hooper (procurement@conwaysc.gov).1CITY OF CONWAYThe City of Conway is accepting sealed bids for the installation of a new Public Utilities AMISystem.Located at 2940 Jerry Barnhill Blvd, Conway, SC 29527. Bidders must verify dimensions inperson. Site visit can be scheduled by contacting Wanda Singleton @ 843-248-1770.The Contractor will be responsible in following all applicable City ordinances, federal, state, andcounty laws and regulation. The contractor and surety shall indemnify, defend, and saveharmless the city, all of its officers, representatives, agents and employees against any claim orliability arising from or based on the violation of any such laws, regulations, ordinances, order ordecree whether by itself or its employees.Contractor will be responsible for obtaining all permits that are required for theseprojects. All bidders must hold Proper License for this work after the bid has beenawarded. Must have a City Business License prior to beginning any work. All work mustbe completed and turned into the City in a reasonable time frame.The City of Conway Public Utilities Department will be available as needed during this project.Bidders are required to conduct a site visit prior to bidding this project. Site visits can bescheduled by contacting Wanda Singleton @ 843-248-1770.The project Public Utilities AMI System will be received in the Procurement Office which islocated at 2940 Jerry Barnhill Blvd., until Tuesday, February 17, 2026 @ 2:00 PM, at whichtime only the names of the Offerors and bids amounts will be announced. Any proposalreceived later than the specified time /date will not be accepted /considered. Before the finalselection is made, all evaluation factors will be taken into consideration before awarding acontract for services. City reserves the right to accept or reject any or all bids.All proposals shall be sealed and list the title of the current bid.Public Utilities AMI SystemTo mail, please send the bid to:City of Conwayc/o Amanda HooperPO Drawer 1075Conway, SC 29528-1075Physical Address:City of Conwayc/o Amanda Hooper2940 Jerry Barnhill Blvd.Conway SC 295272Please submit One (1) original response and Two (2) Copies. Any negotiated contract issubject requirements provided for in any applicable City of Conway Codes and Ordinances.REQUEST FOR PROPOSALI-1 PURPOSE The Request for Bid for Public Utilities AMI System.SCOPE OF WORKThe meter reading data collection infrastructure shall be designed, provided, and installed withinThe City of Conway’s service area. The infrastructure shall provide complete coverage for allaccounts within the service area for the City of Conway, both inside and outside of the Citylimits. Providers shall ensure new meter installation or existing meter conversion is being readand data is being collected. After all of the reading infrastructure is installed, the City shall beginthe process of phasing out all failed meters and/or endpoints not covered under warranty as wellas installing all new meter base/tap settings. Meters and endpoints shall also be required for theCity’s staff to install as normal reading and associated meter/endpoint maintenance are beingconducted. Also, any new taps added to the City’s service during this project shall require a newmeter and reading equipment installation. Additional information is provided in other areas ofthese specifications.The City presently uses Badger M25 RTR, M70 RTR, E-Series Gen 1 & 2, Master Meter Sonata,E-Linx, Octaves, Sensus iPERL, Neptune Mach 10 & T10. The city estimates that there are justover 22,000 water meters within the City of Conway’s service area.Meter Specifications (if applicable):- Provide detail specifications of the meter being offered- Provide installation requirements as it relates to the City’s current meter program- Include meter reading software required- Include warranty information- Provide technology forecast- Provide advantages of meter being offered.Any and all meters replaced within the scope of this project:1. Shall meet or exceed ANSI/AWWA Standard C700, C710, and/or C713 (for accuracyand pressure loss)2. Shall comply with NSF/ANSI Standard 61 Annex F and G compliant and tested toAWWA standards3. Must be able to be visually read at all times (for residential meters)4. Zero lead construction5. Meters may have a brass body with mechanical register and have a visual leak indicatoror all electronic, programmable and hermetically sealed with a tempered glass cover.6. Mechanical registers, brass and/or composite meters must have a 20-year life cycle andthe appropriate warranty as well7. If meter is not brass construction, material must be approved by the City and meet allAWWA standards.38. Electronic register must have a 20-year life cycle and 20-year battery life guarantee.9. Electronic registers must have monitoring alarms such as leak detection, reverse flow,empty pipe, tampering and a battery life but not limited to these listed.10. A twenty (20) year battery life warranty shall be provided on each endpoint.11. Must be approved and meet all the City’s specifications and standard details.12. Describe the cross compatibility of the radio with existing meter types. Provide list ofcompatible manufactures.13. Provide list of available options for MRTU with respect to the number of ports for singleand multi-meter installations.14. Provide number of daily transmissions sent by the MRTU’s15. Provide the frequency of readings collected by the MRTU’s.16. Provide information on the MRTU’s capabilities of transmitting data through metaland/or polymer meter box lids.17. Describe the ability of MRTU’s to be used for AMI systems. If units are cross-compatible, describe the process for converting from AMI and vice-versa.18. Provide information on the ability of MRTU to operate without malfunction in various pitconditions, including submerged in a wet pit.19. Provide information regarding the FCC approval of MRTU’s including which FCCpart(s) the MRTUs have been approved under20. Provide information on battery life on MRTUs (if applicable)21. Include the warranties and/or guarantee policy with respect to each item of proposedequipment. Provide a procedure for submitting warranty claims.22. Provide Certification File in .csv format with test accuracy information for each metershipment.All meter boxes shall be in accordance with the City’s specifications (e.g. Ford or Muellerstretch box/long box type).All AMI components shall have as a minimum, a one-year warranty, from date of acceptance forthe City.The Provider shall provide all required transportation, labor, material, equipment, cables,connectors and all other related appurtenances, training and software to install a real-time, two-way communicating AMI System to read meters, for both existing and future installations, withthe City of Conway’s service area.As new meter installations and phased out meter replacements are used within the City ofConway’s service area, the Provider must guarantee that all installations can be read with theAMI system. Any necessary repeaters, towers, collectors and appurtenances that are needed toprovide this coverage are at the expense of the Provider.All material used that comes in contact with water shall conform to NSF 61 and NSF 372 lead-free standards.The Provider shall make available any and all meters, endpoints, through the lid mounting kits,antennas, cables, connectors and related appurtenances to the City.4The Provider shall include a guaranteed timeline of new component delivery and warrantyreplacement for each item (i.e. data collectors, endpoints, repeaters, meters and registers). TheProvider shall also include a list of their inventory equipment that is maintained and in stock.The Provider shall not move key personnel in and out of the project during its implementationbut shall assign a single project manager who shall work the project to completion. The projectmanager shall be experienced and have been with the company for no less that five (5) years. Inthe beginning, the project manager shall meet weekly with key City personnel to provide aprogress report of the project, problems, complaints issues/resolutions; and projected work planfor the next week.The Provider must supply any and all information detailing the qualifications their team has inperforming the outlined scope of work.The Provider must submit and offer the latest, most technologically advance AMI system on themarket today. The Provider must also guarantee that technology, software and/or equipmentadvancements, shall not force the replacement of operational equipment before its projected lifecycle of thirty (30) years.The meter reading system shall be a fixed-base network system that shall continually receive,store and communicate data to and from meters within the City of Conway service area. Ondemand reads must be available in the event a real time is required from the office personnel.The system shall also allow mobile and manual entry of meter readings. No reprogramming mustbe required for the system to allow mobile reads in the event of a network failure. All systemparts furnished (reading equipment, RF transmitters, and meters with absolute encoders) shall beproduced from an ISO 9001 rated manufacture facility.Meter Reading Specifications (if applicable):- Provide detailed specifications of software and equipment for the meter readingtechnology being offered- Provide process and equipment requirements as it relates to Owner’s current meterreading program.- Include warranty information on equipment- Provide technology forecast- Provide advantages of meter reading technology being offeredThe meter reading system shall have reporting capabilities that include but are not limited to thefollowing:1. No consumption2. Unread or non-communicating endpoint3. Hourly meter reading4. Reverse flow5. Leak notification6. Any type of Tamper7. High consumption5
- Commodity Codes
-
- NAICS 221310Water Supply and Irrigation Systems
- NAICS 237110Water and Sewer Line and Related Structures Construction
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Aiken County Detention Center...
Ad Title: Aiken County Detention Center Food Services Purchasing Agent/Entity: Aiken County Ad
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/23/2026
Ad Title: FPB Alligator Removal Purchasing Agent/Entity: Department of Natural Resources Ad Publish
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/29/2026