1412069851 (RFP) Construction Services for Miller 230kV Solar Substation
Project Information
- Bid Title
- 1412069851 (RFP) Construction Services for Miller 230kV Solar Substation
- Issuing Agency
- JEA
- Location
- Florida
- Published Date
- Nov 6, 2025
- Closing Date
- Dec 9, 2025
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
1412069851 (RFP) Construction Services for Miller 230kV Solar SubstationThe purpose of this solicitation is to select a contractor to provide Construction Services for JEA’s Miller Solar Substation project. The work consists of installing a new 230kV, 3-element ring bus. A prefabricated control enclosure, which will contain preassembled relay panels, and will be installed at site by a third-party vendor described herein (the "Work").
1.
Mobilization
2. Site Surveying and establish baselines
3. Site Preparation
4. Receive and offload substation packager materials
5. Install foundations for all structures and equipment
6. Install ground grid, ground rods, and equipment ground tails
7. Install conduits/cable trenches
8. Backfill and compact site as necessary
9.Install substation rock
10. Install site access roads
11. Install security fencing and gates
12. Transport JEA provided materials and equipment from JEA storeroom
13. Install 230kV structures, bus, and equipment
14. Install grounds to structures and equipment
15. Finish conduit installation, pull cables, and terminate at yard equipment and inside the control house relay equipment
16. Site Clean-up, sodding/seeding and disposal of debris
17. General inspection by JEA
18. Completion of all punch list items
19. Upon JEA commencing the serving of load but not more than ninety (90) days beyond punch list completion, the Contractor shall inspect all 230kV electrical connections for hot spots.
20. Demobilize
The Complete scope of work is included in the Appendix A Technical Specifications.
Planned Project Construction Start: January 5, 2026Estimated Construction Substantial Completion: August 10, 2026
USE THIS LINK TO ACCESS THE SOLICITATION IN ZYCUS: https://zsn.zycus.com/guest/genericRegister/JEA074/iSource/1002415/
Mandatory Pre-Response Meeting: November 13, 2025, at 9:00 AM
Response Due Date: December 9, 2025
- Attachment Preview
-
1) RFP1.1) Cover PageSolicitationFor Participation inConstruction Services for Miller 230kV Solar SubstationforJEAJacksonville, FLSolicitation Number 1412069851Mandatory Pre-Response Meeting via Microsoft Teams or Teleconference on November 13, at 9:00 AMMeeting URL:Meeting ID: 246 232 509 299 9Meeting Passcode: 1412069851Dial In: 469-208-1810Phone conference ID: 629 035 566#Those planning to attend via Microsoft Teams should send contact information to: behrjv@jea.com, 48 hours prior tothe Pre-Response Meeting to have contact information documented.Responses are due on December 9, 2025, by 12:00 PM ESTAll Responses shall be submitted through JEA’s E-Procurement and Contract Management Portal which is providedby Zycus Supplier Network which can be accessed at https://zsn.zycus.com/guest. Instructions on how to login toZycus is provided below in this Solicitation. LATE RESPONSES MAY BE REJECTED.JEA will publicly open all Responses received from qualified Respondents on the Due Date, via Microsoft Teams.For more information, please contact the JEA Buyer at:Jason Behr behrjv@jea.com1.2) Scope of Work (Miller substation)The purpose of this solicitation is to select a contractor to provide Construction Services for JEA’s Miller SolarSubstation project. The work consists of installing a new 230kV, 3-element ring bus. A prefabricated controlenclosure, which will contain preassembled relay panels, and will be installed at site by a third-party vendor describedherein (the "Work").1. Mobilization2. Site Surveying and establish baselines3. Site Preparation4. Receive and offload substation packager materials5. Install foundations for all structures and equipment6. Install ground grid, ground rods, and equipment ground tails7. Install conduits/cable trenches8. Backfill and compact site as necessary9.Install substation rock10. Install site access roads11. Install security fencing and gates12. Transport JEA provided materials and equipment from JEA storeroom13. Install 230kV structures, bus, and equipment14. Install grounds to structures and equipment15. Finish conduit installation, pull cables, and terminate at yard equipment and inside the control house relayequipment16. Site Clean-up, sodding/seeding and disposal of debris17. General inspection by JEA18. Completion of all punch list items19. Upon JEA commencing the serving of load but not more than ninety (90) days beyond punch list completion, theContractor shall inspect all 230kV electrical connections for hot spots.20. DemobilizeThe Complete scope of work is included in the Appendix A Technical Specifications.Planned Project Construction Start: January 5, 2026Estimated Construction Substantial Completion: August 10, 2026The work location: Miller Solar Substation at 30°19’10.90” N, 81°55’2.52” W1.3) BackgroundJEA owns, operates and manages the electric system established by the City of Jacksonville, Florida since 1895. In June1997, JEA also assumed operation of the water and sewer system previously managed by the City. JEA is located inJacksonville, Florida, where we proudly serve an estimated 522,469 electric, 396,566 water and 316,441 sewer and26,902 reuse water customers. JEA is Florida's largest community owned utility and the eighth largest municipal in theUnited States.1.4) Invitation - Submitting a ResponseRespondents that meet the Minimum Qualification stated herein are invited to submit a Response to this Solicitation toperform the Work. A complete copy of this Solicitation, the Technical Specifications, forms and all other documentsreferenced in this Solicitation are on JEA’s E-Procurement and Contract Management Portal which is provided byZycus Supplier Network which can be accessed at https://zsn.zycus.com/guest/genericRegister/JEA074. Instructionson how to login to Zycus is provided below in this Solicitation.All Responses are due at the time indicated on the title page of this Solicitation. Section 1 of this Solicitation are theinstructions for submitting a Response for this Solicitation. Section 2 of this Solicitation contain the definitions andcommercial contract terms associated with this procurement.A Contract will presented to the Respondent awarded this Work and the Contract will incorporate by reference thisentire Solicitation and all associated Addenda. A sample of the JEA Contract can be found on jea.com.All documentation submitted with a Response must reference the Solicitation Title and Number stated herein. AllResponses must be made on the appropriate forms and formats as specified by this Solicitation and uploaded to JEA’sprocurement platform.All Responses should be delivered electronically to JEA via the Zycus platform. An automated, detailed auditingsystem provides sealed Response integrity. Responses remain sealed on the platform until the Close Date & Time(Due Date & Time).A Respondent shall be solely responsible for timely delivery of its Response to the Zycus SupplierNetwork. Respondents are strongly encouraged to acquire log in credentials early as possible. Additionally,Respondents are encouraged to submit Responses early to ensure uploading process goes smoothly. If Respondent isnot able to submit its Response via Zycus, then please email the Response to the JEA Buyer identified in theSection below titled "Questions".Responses are due by the time and on the date stated on the cover page of this Solicitation. LATE RESPONSESMAY BE REJECTED.1.5) Zycus InstructionsI. How to Log Into ZycusA. New Users – Zycus1. New Users will need to register to login. Registration will require Company name, address, phone, contact, title,phone and email address. Also, it is recommended users use Google Chrome to access Zycus.2. Note if the company is already doing business with JEA, you may find the company is already registered in Zycus.To find out if you are registered, try entering your email address in the New User Registration screen. If you receive amessage stating “Email ID already registered”, log in as an Existing User Log-in”. If you don’t know your password,enter your email address and click on “Forgot Password”.B. Existing Users or New Users with Previously Registered Emails1. Once the user has a login on the sourcing platform select “Existing User Log-in”, the user may navigate to thesolicitation by selecting the icon for the applicable solicitation.II. How to Submit a Response Using Zycus1. Once logged in, users will see all JEA Sourcing Events, then select the applicable event.2. Once in the Sourcing Event. The Sourcing Event has prompts for actions required to respond to the solicitation.3. For the user to proceed to submit a Response to JEA using Zycus, the user will be required to provide its acceptanceof the of the Zycus iSource Terms & Conditions associated with the work. Such Terms and Conditions may covernon-disclosure, safety, cyber security, Invitation for Bid contract terms, etc.4. Once all terms are accepted, additional Solicitation information will be available for viewing and submitting aResponse by selecting “Confirm Participation”. JEA will then have a record indicating the company intends to submita Response.5. A user then can respond to each section of the Solicitation, once completed with each section, select “Save”. Noteeach section has a red, yellow, green light code. Items will turn green once completed. Yellow and red lights meanthere is additional action required. Users may also note under each tab, there are multiple questions to respond to,scroll down the list to ensure all questions are answered.6. In most Solicitations, JEA will provide Technical Specifications, pricing tables in Excel which the user will need todownload. Additionally, Excel pricing tables may need to be uploaded once completed to as part of the Response.Users can download the required attachments by selecting the “Buyers Attachments” icon.7. Once the required forms are uploaded and saved, the section light will turn green. Once all sections are completedand green lighted, the User may select “Submit Response”.8. Once the user selects “Submit Response”, the user will receive a “Success” pop-up when submitted.9. Once submitted users may recall and modify submitted documentation and submit information until the ResponseDue Date and Time.1.6) QuestionsAll Questions must be submitted in writing to the JEA Buyer listed herein at least five business days prior to theopening date. Questions received within five business days prior to the opening date may not be answered.1.7) Pre-Response MeetingThere will be a mandatory Pre-Response meeting associated with this Solicitation at the date and time listed on thecover page of this Solicitation. All interested Respondents are invited to attend the Pre-Response meeting. Thoseplanning to attend the Microsoft Teams or teleconference may email their name and contact information to the JEABuyer listed herein at least 48 hours prior to the Pre-Response meeting to facilitate roll call. A Respondent must onlysign in representing one company, unless otherwise agreed to by JEA in writing.1.8) Opening of ResponsesAll Responses received shall be publicly announced and recorded via Microsoft Teams at the date and time indicatedon the cover page of this Solicitation.The details for the Microsoft Teams will be on jea.com at the following website: https://www.jea.com approximately48 hours before the Response opening.At the opening of Responses, a JEA representative will publicly open each Response that was received prior to theDate and Time, except for those Responses that have been properly withdrawn. JEA has the right to waiveirregularities or informalities in the Responses to the extent allowable under applicable laws.1.9) Alternate Provisions and ConditionsTerms and conditions found in Responses that are contrary to requirements found in this Solicitation, including, butnot limited to, the Contract terms and conditions contained in Section 2 of this Solicitation and any requirements foundin the Technical Specifications attached as an exhibit or attachment to this Solicitation, will be rejected and are of noforce and effect. However, JEA reserves the right to negotiate different terms and conditions and requirements if JEAdetermines that such terms and conditions and requirements are in the best interest of JEA.1.10) Minimum QualificationsRespondent must meet the following Minimum Qualifications to be considered eligible to have its Response evaluatedby JEA. Respondent must complete and submit the Minimum Qualification Form provided in this Solicitation.Respondents that are working or have worked for JEA in the past 2 years involving similar work must submit JEA as areference. JEA reserves the right to ask for additional back up documentation or additional reference projects toconfirm the Respondent meets the requirements stated above.JEA in its sole discretion may reject Responses from Respondents not meeting all of the following MinimumQualifications:I. Respondent must be approved on the Responsible Bidders List (RBL) category below by BidOpening: SB1 – Substation Construction up to 500kV.• Visit https://www.jea.com/About/Procurement/Become_a_Vendor/ to learn how to becomeapproved.II. Company must have a current and valid State of Florida business license and State of FloridaCertified General Contractor’s license.III. The Respondent is not on the State of Florida Convicted Vendor List, State of Florida’s SuspendedVendor List, The City of Jacksonville’s Disqualified Vendor List, have not had their biddingprivileges actively suspended by JEA, been debarred by JEA, or have had a contract with JEAterminated for default within the last two (2) years.1.11) Number of Contracts to be AwardedJEA intends to Award one (1) Contract for the Work. JEA reserves the right to Award more than one Contract basedon certain groupings of the Work items, or JEA may exclude certain Work items, if JEA determines that it is in its bestinterest.1.12) Insurance RequirementsPrior to JEA issuing a Purchase Order to the Company to begin the Work, the Company shall submit a certificate ofinsurance (COI) that is in compliance with amounts and requirements as indicated in this Solicitation. Note that theCOI shall specifically indicate JEA as additional insured on all required insurance except Worker's Compensation andProfessional Liability (if applicable). Furthermore, waiver of subrogation must be provided for all required insurancein favor of JEA, including its board members, officers, employees, agents, successors, and assigns.1.13) Liquidated Damages In ContractThe Contract issued pursuant to this Solicitation contains liquidated damages tied to project completion deadlines. TheRespondent should review the specific time frames and liquidated damage amounts prior to submitting its Response.1.14) Jacksonville Small and Emerging Business (JSEB) OptionalIt is at the Respondent's option as to whether it chooses to subcontract with a JSEB firm. JEA encourages the use ofJSEB firms; however, the Respondent is not required to utilize a JSEB to be awarded a Contract under this Solicitation.All questions and correspondence concerning the JSEB program should be addressed to the following contact:Bill HickeyManager, Supplier Diversity Programs and Procurement ServicesJEAhickwj@jea.com or jsebprogram@jea.com1.15) Basis of Award - Highest EvaluatedJEA will use the Selection Criteria listed below to evaluate the Responses. JEA may make its Award decision basedsolely upon the information submitted in the Responses. JEA may also choose to have one or more Respondent makepresentations to representatives of JEA. It is always in the best interest of the Respondent to provide informative,concise, well-organized technical and business information relative to the Work, in both the initial submittal of itsResponse and in any subsequent submittals.Please note, JEA may reject Responses that request material changes or take exceptions to JEA commercial terms andconditions.Responses will be scored and ranked by a committee of evaluators. Each evaluator will individually score theResponses using the evaluation matrix attached to this Solicitation. Using these scores, each evaluator will rank theResponses using "1" for the Response receiving the highest number of points from the matrix. Responses with anequal number of points will receive the same numerical ranking. JEA will total the numerical rankings for eachResponse and consider the Response with the lowest total to be the most highly qualified Response. Any tie will bebroken using the total of the matrix scores of all evaluators. If a tie persists, the tie will be broken in accordance withthe JEA Procurement Operational Procedures.1.16) Bid Bond
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
- NAICS 237130Power and Communication Line and Related Structures Construction
- NAICS 238210Electrical Contractors and Other Wiring Installation Contractors
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Orange County Corrections Dep...
Project ID: Y25-790-RC Title: Orange County Corrections Department Female Detention Center Two Cell
Orange County
Bid Due: 7/14/2026
Drainage Repair and/or New Pu...
Project ID: 25/26-094 Title: Drainage Repair and/or New Public Works Construction Addenda: 0
Clay County
Bid Due: 7/09/2026