Request for Statements of Qualifications and Experience for Engineering Services
Project Information
- Bid Title
- Request for Statements of Qualifications and Experience for Engineering Services
- Issuing Agency
- Vernal city
- Location
- Utah
- Published Date
- Apr 15, 2026
- Closing Date
- May 8, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Title: Request for Statements of Qualifications and Experience for Engineering Services
Category: Airport Status: Open Description: VERNAL REGIONAL AIRPORT, OWNED BY
VERNAL CITY AND UINTAH COUNTY, UTAH
REQUEST FOR STATEMENTS OF QUALIFICATIONS AND EXPERIENCE FOR
ENGINEERING SERVICES
FOR VERNAL REGIONAL AIRPORT
I. INVITATION
Vernal City and Uintah County, Utah (referred to herein as “Sponsor”), as owners of the Vernal
Regional Airport, is requesting statements of qualifications and experience from consulting firms
(“Proposers”) qualified and experienced in the field of airport engineering services.
The Sponsor plans to award a five-year contract for airport engineering services subject to
review on an annual basis for any and all engineering projects subject to federal assistance under
the Airport and Airway Improvement Act of 1982 as amended, or other sources of funding.
A. Projects under this contract may include but are not limited to any of the following:
1. Terminal and terminal environment remodel, expansion and possible relocation
2. Runway extension as appropriate and/or application of ODAL lighting
3. Construction and rehabilitation of terminal aprons
4. Update, repair or replacement of airfield lighting and signage obsolescence
5. Acquire appropriate Aircraft Rescue Firefighting (ARFF) vehicles
6. Acquire appropriate Snow Removal Equipment (SRE)
7. SRE building updates, improvements and expansions
8. Pavement preservation for all airport surfaces
9. Construct appropriate hangar taxi lanes
10. Hangar construction
11. Improve Airfield Utilities, including Sewer/Septic, Water, Gas and Electric
12. Fuel System Improvements, Expansions and Relocation
13. Wildlife Fencing creation and adjustments with possible Escape Ramps
14. Airfield lighting improvements
15. Navigational aide creation, planning, maintenance and expansion along with weather
reporting system upgrades, expansions and updates
16. Construction, improvement and expansions of airfield/air vehicle/ground vehicle
electrification and charging infrastructure for both air and groundside
17. Construction of alternative transport modes to and from the airport
18. Airfield and terminal commercial security improvements
19. Commercial service apron construction and expansion
The above-contemplated projects are dependent upon federal Airport Improvement Program
(AIP) funding and approval of the Sponsor, so it shall be understood that some of the services
related to the above-listed projects may be deleted and that the Sponsor reserves the right to
initiate additional services not included in the initial procurement.
II. BACKGROUND
Vernal Regional Airport is a general aviation Part 139 Commercial Service airport located
approximately two miles south and east of the center of the City of Vernal which is seeking to
implement nearly continual improvements to accommodate existing and future aviation demand
for the entire Uintah Basin. The contract issued to the successful consultant is subject to the
provisions of Executive Order 11246 (Affirmative Action to Ensure Equal Employment
Opportunity) and to the provisions of the Department of Transportation Regulation 49 CERF
Part 26 (Disadvantaged Business Participation). DB firms are encouraged to participate.
III. REQUESTS FOR CLARIFICATION
Any requests for clarification of additional information deemed necessary by any respondent to
present a proposal shall be submitted in writing, via email, to: Airport Director
For security reasons, you must enable JavaScript to view this E-mail address. with a CC: to the Vernal City Manager, For security reasons, you must enable JavaScript to view this E-mail address. .
Written clarification requests must be received a minimum of three (3) days prior to the
submission deadline. Any requests received after this deadline will not be considered. All
requests received prior to the deadline will be responded to by Vernal City in the form of an
addendum addressed to all prospective respondents.
IV. SCOPE OF WORK
Basic engineering services are utilized in four distinct and sequential phases. Proposers are
required to set out their qualifications and to propose on the following scope of work.
A. Preliminary Phase: This phase involves those activities required for defining the scope of a
project and establishing preliminary requirements including, but not limited to, the following:
1. Conferring with the Sponsor on project requirements, programming, finances,
schedules, early phases of the project, and other pertinent matters and meeting with FAA and
other concerned agencies and parties on matters affecting the project
2. Assisting the Sponsor in the preparation of necessary pre-applications, applications,
and required documents for federal and state grants, including Disadvantaged Business
Enterprise (DBE) plan and goals, and exhibits.
3. Planning, procuring, and/or preparing necessary surveys, field investigations and
architectural and engineering studies required for preliminary design considerations.
4. Developing design schematics, sketches, environmental and aesthetic considerations,
project recommendations, and preliminary layouts and associated cost.
B. Design Phase: This phase includes all activities required to undertake and accomplish a full
and complete project design including, but not limited to, the following:
1. Meetings and design conferences to obtain information and to coordinate or resolve
design matters.
2. Collecting engineering data and undertaking field investigations, surveys, engineering,
and engineering and environmental studies.
3. Preparing necessary engineering reports and recommendations.
4. Preparing detailed plans, specifications, and cost estimates.
5. Conducting a detailed value engineering analysis, if applicable and requested.
C. Bidding or Negotiation Phase: This phase, at a minimum, involves providing plans,
specifications, and all bid documents. This phase also includes assisting the Sponsor in
advertising and securing bids, negotiating for services, analyzing bid results, furnishing
recommendations on the award of contracts, and preparing contract documents.
D. Construction Phase: This phase includes all basic services rendered after the award of a
construction contract including, but not limited to, the following:
1. Providing consultation and advice to the Sponsor during all phases of construction.
2. Representing the Sponsor at pre-construction conferences.
3. Providing on site construction inspection and management involving the services of a
full-time resident engineer, inspector, or manager during the construction or installation phase of
a project and providing appropriate and timely reports to the Sponsor.
4. Reviewing and approving shop and erection drawings submitted by contractors for
compliance with design concept.
5. Reviewing, analyzing, and approving laboratory and mill test reports of materials and
equipment.
6. Preparing and negotiating change orders and supplemental agreements.
7. Observing or reviewing performance tests required by specifications.
8. Determining payment amounts to contractors and assisting Sponsor in the preparation
of payment requests for amounts reimbursable from grant projects.
9. Conducting wage rate reviews of certified payrolls.
10. Making final inspection and submitting a report of the completed project to the
Sponsor, including “as built” drawings.
E. Subcontracting Phase: Proposers may additionally be required to provide other technical
services, or subcontract with third party individuals or companies for such services. Technical
services include, but are not limited to, the following:
1. Soils investigation, including core sampling, laboratory tests, related analyses, and
reports.
2. Detailed mill, shop, and/or laboratory inspections of materials and equipment
3. Land surveys and topographic maps.
4. Field and/or construction surveys.
5. Miscellaneous plans, studies, and assessment reports including environmental, noise,
etc.
6. Assist Sponsor in preparing equipment (i.e. snow removal, Airport Rescue and Fire
Fighting, etc.) specifications for procurement for procurement purposes.
V. CONTENTS OF STATEMENT OF QUALIFICATIONS
A. Proposers interested in the provision of engineering services to accomplish the proposed
projects should limit their Statements of Qualifications to 35 pages, exclusive of cover letters or
letters of transmittal containing introductory language only. The Statement of Qualifications
should include:
1. Capability of the firm to perform all aspects of project: List similar engagements
2. Reputation: an explanation of the firm’s reputation
3. Ability to meet schedules within budget: please describe
4. Quantifiable quality of previous airport projects undertaken
5. Familiarity with the project location
6. Understanding of the airport
7. Approach to proposed projects
8. Familiarity with FAA programs, regulations and requirements.
B. The Sponsor invites firms to submit Statements of Qualifications to perform the above-
described services.
Interested firms should submit five (5) copies of the proposal no later than 4:00 PM Friday May
08, 2026, to:
Vernal City Hall
C/O Finance Director
374 East Main Street
Vernal, Utah 84078
C. All packages must be submitted in a sealed envelope and clearly marked on the front of the
envelope/package with:
“STATEMENT OF QUALIFICATIONS FOR AIRPORT ENGINEERING AND
PLANNING SERVICES”.
D. Proposals must contain the name, mailing address, e-mail address and daytime telephone
number for a minimum of two primary contact persons to whom additional selection process
requests should be communicated.
E. Following the selection process, the proposal for the selected proposer shall be made available
for public review, except for any items that proposer has requested, in writing, to remain
confidential under applicable law.
VI. SELECTION CRITERIA
A. Selection criteria contained in FAA Advisory Circular 150/5100-14E Chapter 2, will be
applied in the following order of importance:
1. Capability to perform all aspects of projects: up to 30 Points
2. Reputation: up to 20 Points
3. Ability to meet schedules within budget: up to 20 Points
4. Quality of previous airport projects undertaken: up to 25 Points
5. Familiarity with Sponsor and project location: up to 25 Points
6. Understanding of the airport: up to 20 Points
7. Approach to proposed projects: up to 30 Points
8. Familiarity with FAA programs, regulations, and requirements: up to 20 Points
TOTAL POSSIBLE: 190 Points
VII. SELECTION PROCESS
The selection process will be in strict accordance with Federal Aviation Advisory Circular
150/5100-14E, Architectural, Engineering and Planning Consultant Services for Airport Grant
Projects and 49CFR Part 18.
Fees will be negotiated for projects on a task order basis as grants are obtained. Cost or fee
information is not to be submitted with this proposal.
A short list may be developed from submittals received. Consultants on the short list may be
asked to attend an interview prior to final selection being made. A schedule of fees will be
negotiated with the selected consultant for the services to be performed under the initial FAA or
other grant or grants. Subsequent fees will be negotiated on a task order basis as additional grants
are obtained.
It is the intent of the Sponsor to enter a contract with the most qualified firm no later than 15
May 2026.
Publication Date/Time: 4/15/2026 4:45 PM Closing Date/Time: 5/8/2026 4:00 PM Submittal Information: Vernal City Hall C/O Finance Director 374 East Main Street Vernal, Utah 84078 Contact Person: Ken Campbell, Airport Director
KenCampbell@vernal.gov
with a CC to Vernal City Manager qbennion@vernal.govQualifications: V. CONTENTS OF STATEMENT OF QUALIFICATIONS
A. Proposers interested in the provision of engineering services to accomplish the proposed projects should limit their Statements of Qualifications to 35 pages, exclusive of cover letters or letters of transmittal containing introductory language only. The Statement of Qualifications should include:1. Capability of the firm to perform all aspects of project: List similar engagements
2. Reputation: an explanation of the firm’s reputation
3. Ability to meet schedules within budget: please describe
4. Quantifiable quality of previous airport projects undertaken
5. Familiarity with the project location
6. Understanding of the airport
7. Approach to proposed projects
8. Familiarity with FAA programs, regulations and requirements.B. The Sponsor invites firms to submit Statements of Qualifications to perform the above-described services.
Related Documents: - Attachment Preview
-
VERNAL REGIONAL AIRPORT, OWNED BYVERNAL CITY AND UINTAH COUNTY, UTAHREQUEST FOR STATEMENTS OF QUALIFICATIONS AND EXPERIENCE FORENGINEERING SERVICESFOR VERNAL REGIONAL AIRPORTI. INVITATIONVernal City and Uintah County, Utah (referred to herein as “Sponsor”), as owners of the VernalRegional Airport, is requesting statements of qualifications and experience from consulting firms(“Proposers”) qualified and experienced in the field of airport engineering services.The Sponsor plans to award a five-year contract for airport engineering services subject toreview on an annual basis for any and all engineering projects subject to federal assistance underthe Airport and Airway Improvement Act of 1982 as amended, or other sources of funding.A. Projects under this contract may include but are not limited to any of the following:1. Terminal and terminal environment remodel, expansion and possible relocation2. Runway extension as appropriate and/or application of ODAL lighting3. Construction and rehabilitation of terminal aprons4. Update, repair or replacement of airfield lighting and signage obsolescence5. Acquire appropriate Aircraft Rescue Firefighting (ARFF) vehicles6. Acquire appropriate Snow Removal Equipment (SRE)7. SRE building updates, improvements and expansions8. Pavement preservation for all airport surfaces9. Construct appropriate hangar taxi lanes10. Hangar construction11. Improve Airfield Utilities, including Sewer/Septic, Water, Gas and Electric12. Fuel System Improvements, Expansions and Relocation13. Wildlife Fencing creation and adjustments with possible Escape Ramps14. Airfield lighting improvements15. Navigational aide creation, planning, maintenance and expansion along with weatherreporting system upgrades, expansions and updates16. Construction, improvement and expansions of airfield/air vehicle/ground vehicleelectrification and charging infrastructure for both air and groundside17. Construction of alternative transport modes to and from the airport18. Airfield and terminal commercial security improvements19. Commercial service apron construction and expansionThe above-contemplated projects are dependent upon federal Airport Improvement Program(AIP) funding and approval of the Sponsor, so it shall be understood that some of the servicesrelated to the above-listed projects may be deleted and that the Sponsor reserves the right toinitiate additional services not included in the initial procurement.II. BACKGROUNDVernal Regional Airport is a general aviation Part 139 Commercial Service airport locatedapproximately two miles south and east of the center of the City of Vernal which is seeking toimplement nearly continual improvements to accommodate existing and future aviation demandfor the entire Uintah Basin. The contract issued to the successful consultant is subject to theprovisions of Executive Order 11246 (Affirmative Action to Ensure Equal EmploymentOpportunity) and to the provisions of the Department of Transportation Regulation 49 CERFPart 26 (Disadvantaged Business Participation). DB firms are encouraged to participate.III. REQUESTS FOR CLARIFICATIONAny requests for clarification of additional information deemed necessary by any respondent topresent a proposal shall be submitted in writing, via email, to: Airport DirectorKenCampbell@Vernal.Gov with a CC: to the Vernal City Manager, QBennion@Vernal.Gov.Written clarification requests must be received a minimum of three (3) days prior to thesubmission deadline. Any requests received after this deadline will not be considered. Allrequests received prior to the deadline will be responded to by Vernal City in the form of anaddendum addressed to all prospective respondents.IV. SCOPE OF WORKBasic engineering services are utilized in four distinct and sequential phases. Proposers arerequired to set out their qualifications and to propose on the following scope of work.A. Preliminary Phase: This phase involves those activities required for defining the scope of aproject and establishing preliminary requirements including, but not limited to, the following:1. Conferring with the Sponsor on project requirements, programming, finances,schedules, early phases of the project, and other pertinent matters and meeting with FAA andother concerned agencies and parties on matters affecting the project2. Assisting the Sponsor in the preparation of necessary pre-applications, applications,and required documents for federal and state grants, including Disadvantaged BusinessEnterprise (DBE) plan and goals, and exhibits.3. Planning, procuring, and/or preparing necessary surveys, field investigations andarchitectural and engineering studies required for preliminary design considerations.4. Developing design schematics, sketches, environmental and aesthetic considerations,project recommendations, and preliminary layouts and associated cost.B. Design Phase: This phase includes all activities required to undertake and accomplish a fulland complete project design including, but not limited to, the following:1. Meetings and design conferences to obtain information and to coordinate or resolvedesign matters.2. Collecting engineering data and undertaking field investigations, surveys, engineering,and engineering and environmental studies.3. Preparing necessary engineering reports and recommendations.4. Preparing detailed plans, specifications, and cost estimates.5. Conducting a detailed value engineering analysis, if applicable and requested.C. Bidding or Negotiation Phase: This phase, at a minimum, involves providing plans,specifications, and all bid documents. This phase also includes assisting the Sponsor inadvertising and securing bids, negotiating for services, analyzing bid results, furnishingrecommendations on the award of contracts, and preparing contract documents.D. Construction Phase: This phase includes all basic services rendered after the award of aconstruction contract including, but not limited to, the following:1. Providing consultation and advice to the Sponsor during all phases of construction.2. Representing the Sponsor at pre-construction conferences.3. Providing on site construction inspection and management involving the services of afull-time resident engineer, inspector, or manager during the construction or installation phase ofa project and providing appropriate and timely reports to the Sponsor.4. Reviewing and approving shop and erection drawings submitted by contractors forcompliance with design concept.5. Reviewing, analyzing, and approving laboratory and mill test reports of materials andequipment.6. Preparing and negotiating change orders and supplemental agreements.7. Observing or reviewing performance tests required by specifications.8. Determining payment amounts to contractors and assisting Sponsor in the preparationof payment requests for amounts reimbursable from grant projects.9. Conducting wage rate reviews of certified payrolls.10. Making final inspection and submitting a report of the completed project to theSponsor, including “as built” drawings.E. Subcontracting Phase: Proposers may additionally be required to provide other technicalservices, or subcontract with third party individuals or companies for such services. Technicalservices include, but are not limited to, the following:1. Soils investigation, including core sampling, laboratory tests, related analyses, andreports.2. Detailed mill, shop, and/or laboratory inspections of materials and equipment3. Land surveys and topographic maps.4. Field and/or construction surveys.5. Miscellaneous plans, studies, and assessment reports including environmental, noise,etc.6. Assist Sponsor in preparing equipment (i.e. snow removal, Airport Rescue and FireFighting, etc.) specifications for procurement for procurement purposes.V. CONTENTS OF STATEMENT OF QUALIFICATIONSA. Proposers interested in the provision of engineering services to accomplish the proposedprojects should limit their Statements of Qualifications to 35 pages, exclusive of cover letters orletters of transmittal containing introductory language only. The Statement of Qualificationsshould include:1. Capability of the firm to perform all aspects of project: List similar engagements2. Reputation: an explanation of the firm’s reputation3. Ability to meet schedules within budget: please describe4. Quantifiable quality of previous airport projects undertaken5. Familiarity with the project location6. Understanding of the airport7. Approach to proposed projects8. Familiarity with FAA programs, regulations and requirements.B. The Sponsor invites firms to submit Statements of Qualifications to perform the above-described services.Interested firms should submit five (5) copies of the proposal no later than 4:00 PM Friday May08, 2026, to:Vernal City HallC/O Finance Director374 East Main StreetVernal, Utah 84078C. All packages must be submitted in a sealed envelope and clearly marked on the front of theenvelope/package with:“STATEMENT OF QUALIFICATIONS FOR AIRPORT ENGINEERING ANDPLANNING SERVICES”.D. Proposals must contain the name, mailing address, e-mail address and daytime telephonenumber for a minimum of two primary contact persons to whom additional selection processrequests should be communicated.E. Following the selection process, the proposal for the selected proposer shall be made availablefor public review, except for any items that proposer has requested, in writing, to remainconfidential under applicable law.VI. SELECTION CRITERIAA. Selection criteria contained in FAA Advisory Circular 150/5100-14E Chapter 2, will beapplied in the following order of importance:1. Capability to perform all aspects of projects:up to 30 Points2. Reputation:up to 20 Points3. Ability to meet schedules within budget:up to 20 Points4. Quality of previous airport projects undertaken:up to 25 Points5. Familiarity with Sponsor and project location:up to 25 Points6. Understanding of the airport:up to 20 Points7. Approach to proposed projects:up to 30 Points8. Familiarity with FAA programs, regulations, and requirements: up to 20 PointsTOTAL POSSIBLE: 190 PointsVII. SELECTION PROCESSThe selection process will be in strict accordance with Federal Aviation Advisory Circular150/5100-14E, Architectural, Engineering and Planning Consultant Services for Airport GrantProjects and 49CFR Part 18.Fees will be negotiated for projects on a task order basis as grants are obtained. Cost or feeinformation is not to be submitted with this proposal.A short list may be developed from submittals received. Consultants on the short list may beasked to attend an interview prior to final selection being made. A schedule of fees will benegotiated with the selected consultant for the services to be performed under the initial FAA orother grant or grants. Subsequent fees will be negotiated on a task order basis as additional grantsare obtained.It is the intent of the Sponsor to enter a contract with the most qualified firm no later than 15May 2026.
- Commodity Codes
-
- NAICS 541330Engineering Services
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
RFP - Design Services - Hidde...
Project: RFP - Design Services - Hidden Canyon Park Improvements Ref. #: CIP-Hdn
State Government of Utah
Bid Due: 7/09/2026
2026 Professional Engineering...
Project: 2026 Professional Engineering Services Ref. #: EngServ26 Department: SPECIAL SERVICE DISTRICTS -
State Government of Utah
Bid Due: 1/04/2027