RFB for Installation of Transmission Structures and Conductors at Boviet Substation

Project Information

Bid Title
RFB for Installation of Transmission Structures and Conductors at Boviet Substation
Issuing Agency
Greenville Utilities
Location
North Carolina
Published Date
Feb 27, 2026
Closing Date
Apr 7, 2026
Government Level
State & Local
Status
Closed
Ref. #
26-09
Original Source
Join to Access Full Details
Project Description
Bid Number Title Due Date Other Files Tab Sheet
26-09 RFB for Installation of Transmission Structures and Conductors at Boviet Substation Tue, 04/07/2026 - 02:00pm - -
Attachment Preview
GREENVILLE UTILITIES COMMISSION
GREENVILLE, NORTH CAROLINA
SPECIFICATION AND BID DOCUMENTS
FOR THE INSTALLATION OF TRANSMISSION STRUCTURES
AND CONDUCTORS AT BOVIET SUBSTATION
ISSUED FOR BIDS
GI-1
ADVERTISEMENT FOR BIDS
Sealed proposals will be received in the Office of the Procurement Manager, Greenville
Utilities Commission, 401 S. Greene Street, Greenville, North Carolina 27834 until 2:00 PM
(EDT) on April 07, 2026 and immediately thereafter publicly opened and read for the
INSTALLATION OF TRANSMISSION STRUCTURES AND CONDUCTORS AT BOVIET
SUBSTATION.
Instructions for submitting bids and complete specifications will be available in the
Office of the Procurement Manager, Greenville Utilities Commission, 401 S. Greene Street,
Greenville, North Carolina during regular office hours, which are 8:30AM – 5:00PM Monday
through Friday.
Greenville Utilities Commission reserves the right to reject any or all bids. Late bids
will not be considered.
PRE-BID MEETING – A Pre-Bid meeting will be held at Greenville Utilities
Commission, New Operations Center, Engineering Building, 3355 NC 43N,
Greenville, North Carolina 27834 on Wednesday, March 11, 2026 at 1:00 pm to
3:00 pm (EDT).
The intent of the Pre-Bid Meeting is to allow the bidders an opportunity to
ask questions and make clarifications prior to submitting a bid.
Only portions of the bid/contract will be discussed. Lack of discussion or
clarification of any portion of the bid/contract does not relieve the Bidder from
conforming to the provisions of the same.
Questions regarding this Request for Bid (RFB) should be received by or before 5:00 pm,
March 17, 2026. All questions shall be directed via e-mail to the attention of Cleve
Haddock, Lifetime CLGPO, Procurement Manager at: haddocgc@guc.com, (252) 551-
1533.
GI-2
GREENVILLE UTILITIES COMMISSION
GREENVILLE, NORTH CAROLINA
SPECIFICATION AND BID DOCUMENTS FOR THE INSTALLATION OF
TRANSMISSION STRUCTURES AND CONDUCTORS AT BOVIET SUBSTATION
TABLE OF CONTENTS
REQUEST FOR PROPOSAL
General Instructions .................................................................................................................................GI-1
General Conditions ................................................................................................................................ GC-1
Special Conditions .................................................................................................................................. SC-1
Contract..................................................................................................................................................... C-1
FORM OF PROPOSAL
Proposal .....................................................................................................................................................P-1
Terms and Conditions ................................................................................................................................P-2
Addenda/Clarifications/Bulletins ............................................................................................................... P-5
Labor, Material, and Unit Pricing Proposals..............................................................................................P-7
Proposed Construction Schedule .............................................................................................................P-12
Certificate of Insurance............................................................................................................................P-13
Copy of Contractor’s License ..................................................................................................................P-14
Form of Exceptions..................................................................................................................................P-15
Equal Employment Opportunity Affidavit ..............................................................................................P-16
Good Faith Efforts ...................................................................................................................................P-27
Proposed Project Management Staff........................................................................................................P-33
References ................................................................................................................................................ P-34
List of Subcontractors ..............................................................................................................................P-35
E-Verify Compliance ...............................................................................................................................P-36
Iran Divestment Act Certification............................................................................................................P-37
Bid Bond ..................................................................................................................................................P-38
Performance Bond/Payment Bond...........................................................................................................P-39
GUC Terms and Conditions.....................................................................................................................P-42
TECHNICAL SPECIFICATIONS
Technical Specifications – Installation Specifications...............................................................................S-1
Technical Specifications – Material Specifications .................................................................................S-28
APPENDICES
A. Pole Replacement Schedule
B. Staking Sheet
C. Plan & Profile Drawing
D. Standard Pole Framing
E. Standard Assembly Drawings
F. Sag-Tension Charts
G. Galvanized Steel Manufacturer’s Drawings
GI-3
SECTION I
GENERAL INSTRUCTIONS FOR FORMAL BIDS
INSTALLATION OF TRANSMISSION STRUCTURES AND CONDUCTORS AT
BOVIET SUBSTATION
1. NOTICE TO BIDDERS
Sealed bids, subject to the conditions made a part hereof, will be received in the Office of the
Procurement Manager, Greenville Utilities Commission, 401 S. Greene Street, Greenville,
North Carolina 27834 until 2:00 PM (EDT) on April 07, 2026, the day of opening. Bids
submitted in a fax or e-mail in response to this Invitation for Bids will not be acceptable.
2. STANDARD FORMS REQUIRED
Each bidder must submit a proposal on the enclosed bid forms. The bid must be signed by
an authorized official of the firm. Return only the attached Proposal Form. Do not
return the Advertisement for Bids, Instructions to Bidders or Specifications.
3. PREPARATION OF BID
Bids must be in sealed envelopes clearly marked on the outside with the name of the bid and
the bid opening date and time. Bid shall be addressed to PROCUREMENT MANAGER,
GREENVILLE UTILITIES COMMISSION, 401 S. GREENE STREET, GREENVILLE,
NORTH CAROLINA 27834.
4. TIME FOR OPENING BIDS
Bids will be opened promptly and read at the hour and on the date set forth in the
advertisement in the Office of the Procurement Manager, Greenville Utilities Main Office,
401 S. Greene Street, Greenville, North Carolina. Bidders or their authorized agents are
invited to be present.
5. BID SECURITY
5.1. Each Proposal shall be accompanied by a cashier's check, or certified check
drawn on a bank or trust company insured by the Federal Deposit Insurance
Corporation, or the Savings Association Insurance Fund, or an original
signed/sealed Bid Bond in an amount equal to not less than five percent (5%) of
the total amount of the Proposal; said deposit to be retained by the Owner as
liquidated damages in event of failure of the Successful Bidder to execute the
Contract within ten (10) days after the award.
5.2. Bid Bond shall be conditioned that the Surety will upon demand forthwith make
payment to the Obligee upon said Bond if the Bidder fails to execute the
GI-1
Contract in accordance with the Bid Bond, and upon failure to immediately
make payment, the Surety shall pay to the Obligee an amount equal to double
the amount of said Bond. Standard Form of Bid Bond is included in these
Specifications.
5.3. Only one (1) bid Surety is required, the amount of which shall be based on the
total amount of all bid schedules.
6. BULLETINS AND ADDENDA
Any bulletins issued during the time of bidding or addenda to Specifications are to be
considered covered in the Proposal, and in executing a Contract will become a part thereof.
Receipt of addenda shall be acknowledged by the bidder in the Form of Proposal.
7. NC SALES TAX
Do not include NC sales taxes in bid figure; however, Greenville Utilities Commission
(GUC) does pay sales tax. Sales tax should be added to the invoice as a separate item.
8. FEDERAL EXCISE TAX
GUC is exempt from Federal Excise Tax and will issue a Federal Exemption Certificate upon
request to the successful bidder.
9. FORM OF EXCEPTIONS
Proposals shall include a Form of Exceptions utilizing forms provided which shall itemize
each exception from the Specifications. The Form of Exceptions shall state the section,
subsection, and paragraph designations from the part of the Specifications to which exception
is taken and explain in detail the nature of the exception. A copy of this Form of Exceptions
is included in the Form of Proposals. Exceptions will not necessarily eliminate a Bidder from
consideration, even if bids without exceptions are received from others. The treatment of
exceptions will be based entirely on the overall best interests of the Owner.
10. DISCREPANCY
Should the Bidder find discrepancies in or omissions from the Drawings or Documents or
should he be in doubt as to their meaning, he shall at once notify the Engineer who will send
written instructions to all Bidders. Neither the Owner nor the Engineer will be responsible for
any oral instructions. If Plans and Specifications are found to disagree after Contract is
awarded, the Engineer shall be the judge as to what was intended. The Successful Bidder is
hereby made responsible for the furnishing of the necessary labor, tools and equipment
reasonably inferred or evidently necessary for the proper execution and completion of the
work; for any additional work involved in the correction of apparent errors or
inconsistencies, and in executing the true intent and meaning of the Drawings and
Specifications as interpreted by the Engineer and all such labor and equipment shall be
GI-2
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.

Government Bids

Empower Your Bidding Strategy

Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.

  • Access an extensive database of bids, including comprehensive local and state opportunities.
  • Receive customized alerts for the bids that matter most to your business.
  • Explore detailed specifications to ensure precise and competitive submissions.
  • Gain a competitive edge with up-to-date information and exclusive opportunities.

See Also

ITB: Water Treatment Chemicals

Bid Title: ITB: Water Treatment Chemicals Category: Public Utilities Status: Open Description: ITB:

Brunswick County

Bid Due: 7/22/2026

Federal Lobbying Services

Solicitation Number: 1012-27-001 Project Title: Federal Lobbying Services Description: Federal Lobbying Services Opening

State Government of North Carolina

Bid Due: 7/22/2026