RFB for Installation of Transmission Structures and Conductors at Boviet Substation
Project Information
- Bid Title
- RFB for Installation of Transmission Structures and Conductors at Boviet Substation
- Issuing Agency
- Greenville Utilities
- Location
- North Carolina
- Published Date
- Feb 27, 2026
- Closing Date
- Apr 7, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- 26-09
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Number Title Due Date Other Files Tab Sheet 26-09 RFB for Installation of Transmission Structures and Conductors at Boviet Substation Tue, 04/07/2026 - 02:00pm - - - Attachment Preview
-
GREENVILLE UTILITIES COMMISSIONGREENVILLE, NORTH CAROLINASPECIFICATION AND BID DOCUMENTSFOR THE INSTALLATION OF TRANSMISSION STRUCTURESAND CONDUCTORS AT BOVIET SUBSTATIONISSUED FOR BIDSGI-1ADVERTISEMENT FOR BIDSSealed proposals will be received in the Office of the Procurement Manager, GreenvilleUtilities Commission, 401 S. Greene Street, Greenville, North Carolina 27834 until 2:00 PM(EDT) on April 07, 2026 and immediately thereafter publicly opened and read for theINSTALLATION OF TRANSMISSION STRUCTURES AND CONDUCTORS AT BOVIETSUBSTATION.Instructions for submitting bids and complete specifications will be available in theOffice of the Procurement Manager, Greenville Utilities Commission, 401 S. Greene Street,Greenville, North Carolina during regular office hours, which are 8:30AM – 5:00PM Mondaythrough Friday.Greenville Utilities Commission reserves the right to reject any or all bids. Late bidswill not be considered.PRE-BID MEETING – A Pre-Bid meeting will be held at Greenville UtilitiesCommission, New Operations Center, Engineering Building, 3355 NC 43N,Greenville, North Carolina 27834 on Wednesday, March 11, 2026 at 1:00 pm to3:00 pm (EDT).The intent of the Pre-Bid Meeting is to allow the bidders an opportunity toask questions and make clarifications prior to submitting a bid.Only portions of the bid/contract will be discussed. Lack of discussion orclarification of any portion of the bid/contract does not relieve the Bidder fromconforming to the provisions of the same.Questions regarding this Request for Bid (RFB) should be received by or before 5:00 pm,March 17, 2026. All questions shall be directed via e-mail to the attention of CleveHaddock, Lifetime CLGPO, Procurement Manager at: haddocgc@guc.com, (252) 551-1533.GI-2GREENVILLE UTILITIES COMMISSIONGREENVILLE, NORTH CAROLINASPECIFICATION AND BID DOCUMENTS FOR THE INSTALLATION OFTRANSMISSION STRUCTURES AND CONDUCTORS AT BOVIET SUBSTATIONTABLE OF CONTENTSREQUEST FOR PROPOSALGeneral Instructions .................................................................................................................................GI-1General Conditions ................................................................................................................................ GC-1Special Conditions .................................................................................................................................. SC-1Contract..................................................................................................................................................... C-1FORM OF PROPOSALProposal .....................................................................................................................................................P-1Terms and Conditions ................................................................................................................................P-2Addenda/Clarifications/Bulletins ............................................................................................................... P-5Labor, Material, and Unit Pricing Proposals..............................................................................................P-7Proposed Construction Schedule .............................................................................................................P-12Certificate of Insurance............................................................................................................................P-13Copy of Contractor’s License ..................................................................................................................P-14Form of Exceptions..................................................................................................................................P-15Equal Employment Opportunity Affidavit ..............................................................................................P-16Good Faith Efforts ...................................................................................................................................P-27Proposed Project Management Staff........................................................................................................P-33References ................................................................................................................................................ P-34List of Subcontractors ..............................................................................................................................P-35E-Verify Compliance ...............................................................................................................................P-36Iran Divestment Act Certification............................................................................................................P-37Bid Bond ..................................................................................................................................................P-38Performance Bond/Payment Bond...........................................................................................................P-39GUC Terms and Conditions.....................................................................................................................P-42TECHNICAL SPECIFICATIONSTechnical Specifications – Installation Specifications...............................................................................S-1Technical Specifications – Material Specifications .................................................................................S-28APPENDICESA. Pole Replacement ScheduleB. Staking SheetC. Plan & Profile DrawingD. Standard Pole FramingE. Standard Assembly DrawingsF. Sag-Tension ChartsG. Galvanized Steel Manufacturer’s DrawingsGI-3SECTION IGENERAL INSTRUCTIONS FOR FORMAL BIDSINSTALLATION OF TRANSMISSION STRUCTURES AND CONDUCTORS ATBOVIET SUBSTATION1. NOTICE TO BIDDERSSealed bids, subject to the conditions made a part hereof, will be received in the Office of theProcurement Manager, Greenville Utilities Commission, 401 S. Greene Street, Greenville,North Carolina 27834 until 2:00 PM (EDT) on April 07, 2026, the day of opening. Bidssubmitted in a fax or e-mail in response to this Invitation for Bids will not be acceptable.2. STANDARD FORMS REQUIREDEach bidder must submit a proposal on the enclosed bid forms. The bid must be signed byan authorized official of the firm. Return only the attached Proposal Form. Do notreturn the Advertisement for Bids, Instructions to Bidders or Specifications.3. PREPARATION OF BIDBids must be in sealed envelopes clearly marked on the outside with the name of the bid andthe bid opening date and time. Bid shall be addressed to PROCUREMENT MANAGER,GREENVILLE UTILITIES COMMISSION, 401 S. GREENE STREET, GREENVILLE,NORTH CAROLINA 27834.4. TIME FOR OPENING BIDSBids will be opened promptly and read at the hour and on the date set forth in theadvertisement in the Office of the Procurement Manager, Greenville Utilities Main Office,401 S. Greene Street, Greenville, North Carolina. Bidders or their authorized agents areinvited to be present.5. BID SECURITY5.1. Each Proposal shall be accompanied by a cashier's check, or certified checkdrawn on a bank or trust company insured by the Federal Deposit InsuranceCorporation, or the Savings Association Insurance Fund, or an originalsigned/sealed Bid Bond in an amount equal to not less than five percent (5%) ofthe total amount of the Proposal; said deposit to be retained by the Owner asliquidated damages in event of failure of the Successful Bidder to execute theContract within ten (10) days after the award.5.2. Bid Bond shall be conditioned that the Surety will upon demand forthwith makepayment to the Obligee upon said Bond if the Bidder fails to execute theGI-1Contract in accordance with the Bid Bond, and upon failure to immediatelymake payment, the Surety shall pay to the Obligee an amount equal to doublethe amount of said Bond. Standard Form of Bid Bond is included in theseSpecifications.5.3. Only one (1) bid Surety is required, the amount of which shall be based on thetotal amount of all bid schedules.6. BULLETINS AND ADDENDAAny bulletins issued during the time of bidding or addenda to Specifications are to beconsidered covered in the Proposal, and in executing a Contract will become a part thereof.Receipt of addenda shall be acknowledged by the bidder in the Form of Proposal.7. NC SALES TAXDo not include NC sales taxes in bid figure; however, Greenville Utilities Commission(GUC) does pay sales tax. Sales tax should be added to the invoice as a separate item.8. FEDERAL EXCISE TAXGUC is exempt from Federal Excise Tax and will issue a Federal Exemption Certificate uponrequest to the successful bidder.9. FORM OF EXCEPTIONSProposals shall include a Form of Exceptions utilizing forms provided which shall itemizeeach exception from the Specifications. The Form of Exceptions shall state the section,subsection, and paragraph designations from the part of the Specifications to which exceptionis taken and explain in detail the nature of the exception. A copy of this Form of Exceptionsis included in the Form of Proposals. Exceptions will not necessarily eliminate a Bidder fromconsideration, even if bids without exceptions are received from others. The treatment ofexceptions will be based entirely on the overall best interests of the Owner.10. DISCREPANCYShould the Bidder find discrepancies in or omissions from the Drawings or Documents orshould he be in doubt as to their meaning, he shall at once notify the Engineer who will sendwritten instructions to all Bidders. Neither the Owner nor the Engineer will be responsible forany oral instructions. If Plans and Specifications are found to disagree after Contract isawarded, the Engineer shall be the judge as to what was intended. The Successful Bidder ishereby made responsible for the furnishing of the necessary labor, tools and equipmentreasonably inferred or evidently necessary for the proper execution and completion of thework; for any additional work involved in the correction of apparent errors orinconsistencies, and in executing the true intent and meaning of the Drawings andSpecifications as interpreted by the Engineer and all such labor and equipment shall beGI-2
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
ITB: Water Treatment Chemicals
Bid Title: ITB: Water Treatment Chemicals Category: Public Utilities Status: Open Description: ITB:
Brunswick County
Bid Due: 7/22/2026
Solicitation Number: 1012-27-001 Project Title: Federal Lobbying Services Description: Federal Lobbying Services Opening
State Government of North Carolina
Bid Due: 7/22/2026