DPS District 1 Intel Remodel
Project Information
- Bid Title
- DPS District 1 Intel Remodel
- Issuing Agency
- State Government of Iowa
- Location
- Iowa
- Published Date
- Mar 11, 2026
- Closing Date
- Apr 1, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- RFP951500-01
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid InformationBid Number
RFP951500-01
Solicitation
DPS District 1 Intel Remodel
Solicitation Type
Request for Bids
CountyDescriptionDescription
The State of Iowa Department of Administrative Services (DAS) is seeking professional design services for adding an interior wall to make office space/work area. Space will need to be heated and cooled by new RTU. Work is in the Des Moines metro area.
Agency InformationNumber
005
Name
Administrative Services, Dept
Address 1
1305 E. Walnut St.
Address 2
City/State/Zip
Des Moines, IA 50319
Contact InformationContact Name
Construction Procurement
Contact Title
Michael Bradbury
Contact Email
Contact Phone Number
(515) 823-9327
Contact Phone Extension
Contact Other Number
Contact Fax NumberValid DatesFrom
3/11/2026 3:30:00 PM
Until
4/1/2026 2:00:00 PM
Documents/Attachments - Attachment Preview
-
RFP COVER SHEETAdministrative InformationSTATE OF IOWAREQUEST FOR PROPOSALSPROFESSIONAL DESIGN SERVICESRFP Number RFP951500-01 Title of RFP DPS District 1 Intel RemodelAgencyIowa Department of Administrative Services (DAS)ProjectDescriptionThe State of Iowa Department of Administrative Services (DAS) is seeking professionaldesign services for adding an interior wall to make office space/work area. Space willneed to be heated and cooled by new RTU. Work is in the Des Moines metro area.State Issuing Officer:Michael BradburyIssuing OfficerIowa Department of Administrative ServicesHoover State Office Building, Level 31305 East Walnut, Des Moines, IA 50319-0105 Phone: 515-823-9327Email: construction.procurement@iowa.govPROCUREMENT TIMETABLE—Event or ActionDate/Time (Central Time)State Posts Notice of RFP on TSB website3/9/2026State Issues RFP3/11/2026Pre-Proposal Conference Location and Address:Is Pre-Proposal Conference mandatory? NoVirtual Option Link (provided by CM)RFP951500-01 Pre-Proposal Meeting (Virtual Option)Tuesday, March 24 · 2:00 – 3:00pmVideo call link: https://meet.google.com/hps-isjx-pzfOr dial: (US) +1 218-296-8603 PIN: 994 103 685#More phone numbers: https://tel.meet/hps-isjx-pzf?pin=9150874752756If a map is needed, contact the Issuing Officer.3/24/2026 at 2:00 PM CSTAt 1333 Ohio St, DesMoines, IA 50313Questions, requests for clarification, and suggested changes fromRespondents due to Construction Procurement3/27/2026 at 3:00 PM CSTProposals Due4/1/2026 at 2:00 PM CSTRelevant WebsitesWebsite where Addenda to this RFP will be posted http://bidopportunities.iowa.govWebsite where contract terms and conditions are postedhttps://das.iowa.gov/sites/default/files/procurement/pdf/ConsensusDoc803.pdfNumber of Copies of Proposals Required to be Submitted: 1 DigitalFirm Proposal TermsThe minimum number of days following the deadline for submitting Proposals that the firm guaranteesall proposal terms, including price, will remain firm is 120 Days.1.1 INTRODUCTIONThe Iowa Department of Administrative Services (DAS) is seeking proposals from qualified andavailable Design companies for services, per RFP cover page, and as outlined in the following(Sections 1.2 - 1.3). The successful proposal must:● For the staff that will be assigned, identify and describe qualifications, experience, andexpertise in providing services for similar, or relevant, projects.● For the staff that will be assigned, provide a list of past similar or relevant projects completedin the last 5 years, and include brief descriptions of what the projects entailed and a contactname and phone number (reference). In addition provide estimated project cost, final projectcost at acceptance, and whether it was completed on time.● Describe the composition of your team. Identify staff to be assigned. Provide resumes of keyindividual(s) including education, relevant experience, and certifications/licensing.NOTE: Any responding company and/or consultant that is part of the project design servicescannot receive an award from the resulting request for bid of construction services.● Describe the cost estimating, status reporting, and cost reporting procedures you utilize.● Describe computer program/software capabilities and expertise you utilize. Please describeyour experience.● Provide a copy of your organizational chart.● Describe your experience, if any, on designing similar or relevant projects for the State ofIowa.● Provide the hourly rates, and anticipated hours by position, for all persons (including sub-consultants) that will be assigned to the project. Also provide an estimated fee total.● Identify desired reimbursable charges (the State has limitations, per State of Iowa AccountingPolicies and Procedures 210.245), and all other charges.1.2 SCHEDULEDAS is seeking a firm that can commence work upon execution of a contract. Time is of theessence.Execution of Designer’s ContractTentative Design Kick-Off Meeting50% Construction Documents and Cost Opinion By95% Construction Documents and Cost Opinion By100% Construction Documents and Cost Opinion ByContractor BiddingExecution of Contractor’s Contract(s)Submittals, Procurement and ConstructionClose outWeek of April 6thWeek of April 13thTo Be CoordinatedTo Be CoordinatedMay 15, 2026May 20, 2026June 3, 2026June to September, 2026September to October, 20261.3 PROJECT DESCRIPTIONDAS is currently seeking design services from qualified firms for a project consisting of adding aninterior wall to make office space/work area. Space will need to be heated and cooled by newRTU.Design services shall include:1.3.1 The contract for this work will be a modified ConsensusDoc 803. See link on cover pagefor a sample contract.1.3.2 All design disciplines necessary to complete the scope of work.1.3.3 Attend design kick-off meeting onsite to discuss desired outcome of the project with theOwner, Construction Manager, and Owner’s maintenance staff.1.3.4 Use of the State of Iowa‘s construction management software program for uploading alldocuments, submitting and approving pay apps, and construction administration. Thecost for the use of the software is paid by the Owner.1.3.5 Complete design including all disciplines for renovation of garage to complete additionaloffice space. Existing office location at 1333 Ohio St, Des Moines Iowa. Project scope isanticipated to include:1.3.5.1 Minor demolishing as needed to accommodate new wall.1.3.5.2 New electrical, mechanical, review of sprinkler to accommodate new space.1.3.5.3 New wall will be from floor to roof deck. It is not anticipated that a ceiling will beinstalled in new space.1.3.5.4 Anticipate new doors and frames1.3.5.5 Painting of new walls and door/frames.1.3.5.6 Floor coverings1.3.5.7 HVAC modification to accommodate new construction1.3.6 Existing CAD/PDF drawings will be provided to the successful design firm. Accuracy ofdrawings shall be verified by the design firm.1.3.7 Field examination of the existing buildings.1.3.8 Design for scope of work. Provide material recommendations based on experience,quality, and price. Recommendations for replacements and upgrades shall include non-proprietary equipment and systems.1.3.9 Coordinate with State agencies to confirm utilities that may be abandoned as well as shutdown requirements where required.1.3.10 Provide detailed input of design schedule to Construction Manager for overallincorporation into master schedule.1.3.11 Designer shall assist Construction Manager in the evaluation of long lead times.1.3.12 Quality control during Design, Preconstruction and Construction.1.3.13 Compliance with all Federal, State, and applicable AHJ codes.1.3.14 Completion of State building and energy code documents, as required.1.3.15 Design review will be conducted at 50% construction documents, and 95% constructiondocuments. Dates for design review meetings to be coordinated with the design andproject team and set no later than the design kickoff meeting. Review will be conductedwith DAS Owner Representative, Construction Manager, and Facility Representative, at aminimum. Drawings, specifications and cost opinions (if applicable) shall be provided atleast one day prior to each review meeting.1.3.16 Review with the Department of Inspections, Appeals, and Licensing’s Building CodeBureau for approval of plans or exemption from review. All fees associated with theBureau are the responsibility of the designer.1.3.17 Develop and distribute agendas and meeting minutes for all meetings during the designphase.1.3.18 Designer shall provide any information necessary to obtain utility rebates whereapplicable.1.3.19 Construction cost opinions provided by the Design Professional team during Design (at50% construction documents, and 95% construction documents) with a Final Estimate forconstruction included with bid documents, per Iowa Code.1.3.20 Construction drawings, specifications (DAS will produce Divisions 00 and 01), andaddenda.1.3.21 Provide bid alternates as determined during the course of design and bid packagedevelopment.1.3.22 Assist Owner and Construction Manager in obtaining bids from qualified contractors.1.3.23 Construction administration, including creation of the submittal and closeout items log,review of and responses to submittals and closeout documentation, RFIs, proposalrequests, change orders, pay applications, periodic site visits, attendance at projectmeetings as required, participation / development of contractor punch list, closeoutdocumentation review and approval, certificates of substantial completion, andcertificates of final completion, as well as development of Architectural SupplementalInstructions for design revisions, and punch lists within the construction managementsoftware program.1.3.24 Participation with project team during construction progress meetings as required.Designer shall participate in bi-weekly conference calls during the construction period.1.3.25 Field Observation reports, with photos, submitted for each site inspection within five (5)days of the site visit.1.3.26 Acknowledgement that all documents are copyright to the State of Iowa and shall beturned over to the State of Iowa in their native computer format. Any ASIs/RFIs/PRs andaddendums will be expected to be incorporated before final posting. Both the nativecomputer format and PDF versions shall be uploaded to the construction managementsoftware program at the end of the project.1.3.27 The Department requests lump sum pricing from the respondents to this RFP, with thelump sum base scope price being inclusive of all reimbursables, such as printing, mileageand travel expenses. The Department requests the fee proposal from the respondents tothis RFP be broken down as follows. These breakdown prices will be used as the scheduleof values for billing purposes.1.3.27.1 Construction Documents1.3.27.2 Bidding or Negotiation Assistance
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
CDBG 2019 Disaster Recovery -...
Funding Opportunity Details For Additional Information and to Apply - Login | Register
Iowa Grants
Bid Due: 12/31/2030
CDBG 2019 Disaster Recovery -...
Funding Opportunity Details For Additional Information and to Apply - Login | Register
Iowa Grants
Bid Due: 12/31/2030