RFQ - Transmission Main Replacement WTP to D Street
Project Information
- Bid Title
- RFQ - Transmission Main Replacement WTP to D Street
- Issuing Agency
- City of Port Angeles
- Location
- Washington
- Published Date
- Jan 14, 2026
- Closing Date
- Mar 5, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- PSA-2026-08
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Number: PSA-2026-08
Bid Title: RFQ - Transmission Main Replacement WTP to D Street
Category: Public Works Status: Open Description: This RFQ is for a qualified consulting firm to provide engineering design and construction support services for a transmission main replacement between the Port Angeles Water Treatment Plant and the "D" Street.
Project Managers: Lucio Baack at For security reasons, you must enable JavaScript to view this E-mail address. and Rob Feller at For security reasons, you must enable JavaScript to view this E-mail address. .
SOQ due date: 2:00 PM, Thursday, March 5th, 2026.
Publication Date/Time: 1/14/2026 12:00 AM Closing Date/Time: 3/5/2026 2:00 PM Submittal Information: lbaack@cityofpa.us, rfeller@cityofpa.us, & cc contracts@cityofpa.us Related Documents: - Attachment Preview
-
City of Port AngelesPublic Works and UtilitiesRequest for Qualifications(RFQ)Professional Consulting Services for:Transmission Main Replacement - WaterTreatment Plant to D StreetPSA-2026-08Qualifications Due:2:00 PM Thursday, March 5th, 2026City of Port AngelesDepartment of Public Works - EngineeringAttn: Lucio Baack / Rob Feller321 E 5th StreetPort Angeles, WA 98362lbaack@cityofpa.us; rfeller@cityofpa.us360-809-9051 & 360-460-5316STATEMENT OF PURPOSEThe City of Port Angeles (City) is seeking a qualified consulting firm to provide engineering design andconstruction support services for a transmission main replacement between the Port Angeles WaterTreatment Plant (PAWTP) and “D” Street.The ideal engineering consultant for this project has experience designing water utility projects, anunderstanding of the City’s water infrastructure, and is well versed with WSDOT constructionspecifications.The primary component of this work is the development of design plans, specifications, and cost estimates(PS&E) for replacement of approximately 14,500 linear feet of 24-inch diameter ductile iron water main.Prior to initiating design, the Consultant will also develop a plan and lead a field investigation of soilconditions, assess the existing transmissions mains condition along the alignment, and evaluate a possiblereduction in project scope. If additional engineering, construction management, analysis, and/orstudies arise, the Consultant and the City will negotiate a scope of work, fee, and formalize it in aConsultant Directed Service work order.Proposals shall be submitted by firms that are capable and experienced in the type of work described inthis Request for Qualification (RFQ). In addition, all interested firms shall have readily available resourcesin the form of trained personnel, support services, specialized consultants and financial resources to carryout the work without delay or shortcomings. Interested consulting firms are encouraged to submit conciseand clear responses to the Request for Qualifications. Responses of excessive length or complexity arediscouraged. Statements of Qualifications shall be limited to ten (10), single sided, 8 1/2 x 11 Inch pages,including cover letter.BACKGROUND INFORMATIONIn 1977, the City of Port Angeles constructed the Ranney Well Collector System on the Elwha River,replacing Morse Creek water diversion structure as the City’s primary water supply. A 24-inch ductile irontransmission main was installed, providing the sole means of conveying water from the Elwha River to theCity’s reservoirs.In 2010, the Port Angeles Water Treatment Plant (PAWTP) was placed into service and now intercepts theoriginal Ranney Well transmission main along the Milwaukee Drive right-of-way. From the PAWTP, wateris conveyed eastward through the 24-inch transmission main to “D” Street, where it connects to a newerC900 PVC transmission main.The PAWTP operates on average, 9-10 hours a day. Hours of operation are shorter in the winter and longerin the summer. The PAWTP fills the City reservoirs and then goes offline. The transmission main from thePAWTP to “D” street remains energized through the medium pressure zone interconnection during non-operational hours.The 45-year-old ductile iron main has experienced two exterior corrosion failures in the last decade. Bothfailures exhibited an exterior corrosion depth that penetrated down to the inner wall of the pipe.Additionally, the exterior corrosion made it difficult to repair as the repair crews had a hard time findinga location on the pipe where a dresser coupling seal would work. Soil corrosivity was identified as a hazardduring the mains construction, and portions of the main are polyethylene-wrapped. Inspection of the pipeduring the repair identified extensive exterior corrosion, damaged polyethylene-wrapping, and poor pipebedding which appeared to be native backfill with large rocks. Poor installation practices, corrosion andage-related degradation have compromised the long-term reliability of the pipeline.The goal of this project is the design of a cost-effective replacement of the transmission main from thePAWTP to “D” Street, where the transmission main connects to a newer C900 PVC pipe. The pipeline mustremain in service during construction; therefore, a parallel pipeline alignment is anticipated to be themost practical. Additionally, the transmission main includes multiple tie-ins to the City’s Medium Pressurezone, which must be reestablished.SCOPE OF WORKThe City of Port Angeles (City) is seeking qualified firms to perform predesign field investigations,propose alignment options, design, and provide bidding and construction support for the replacementof approximately 14,500 linear feet of 24-inch diameter ductile iron water main.Under the general direction of the City Engineer or designee, qualified firm(s) may be responsible for,but not limited to, the following tasks:• Hydraulic modeling to evaluate potential system improvement options (Consultant may bedirected to work in consort with the City’s existing Water Modeling Support Consultant)• The Consultant will perform predesign field investigations to assess existing pipe condition,quality of past installation practices, and corrosion extent. The goal of the pre-design fieldinvestigation will be to refine the limits of the pipe replacement project, determine if portions ofthe main have not deteriorated in the same manner as others, and evaluate if the project can besplit into phases.• Develop an alignment in collaboration with City Public Works and Engineering Staff• Provide a geotechnical/soil investigation for the selected alignment. It is understood thatportions of the existing alignment encountered bedrock; the investigation should identify similarconditions and associated constructability considerations.• Define limits of City led Topographical / ROW / Utility survey• Provide constructability and cost analysis for three material types; HDPE, Ductile Iron, C900 PVC.• 30% Design - conceptual design, and cost estimate• 90% Design - Package, Plans, Specifications, and Estimates• Final Bid Package, 100% Construction Plans, Specifications, Engineer’s Estimate• Bidding Support, Construction Engineering, and Project Management supportSCHEDULEAdvertisement Date: Wednesday, January 14th, 2026RFQ issued: [same date as Ad Date]Questions Due: 2:00 PM Thursday, February 19th, 2026The City will not respond to any inquiries submitted after this date/time.Due Date: 2:00 PM Thursday, March 5th, 2026REQUEST FOR QUALIFICATIONS CONTENTSubmittals must clearly demonstrate an understanding of the City’s objectives. The cost of developing thescope of services for a particular project shall be included in the consultants’ cost of doing business andthe City is not responsible for any costs associated with preparing it. The proposal shall be limited to 10pages (single-sided), although resumes may be attached in an appendix not included in the page limit. Theproposal should not include unnecessary promotional material, and shall be brief, precise, and organizedas follows:1. Cover LetterPlease include:• Firm name, address, telephone, email• A single point of contact for the RFQ process• General introduction to your firm with a summary of general qualifications and areas of expertise.2. Statement of QualificationsPlease include:• Description of firmo Type of ownership – individual, partnership, municipality, corporation, etc.o Size of firmo Number of years in businesso Description of qualifications in areas of expertise and services providedo Information relating your philosophy and general approaches to the work to be performed• A list of projects that demonstrates your firm’s experience with respect to water main design,hydraulic modeling, field investigations, installation of utilities in utilities-burdened rights-of-way,in addition to those specific the tasks listed in the Scope of Work above.o Include relevant background information on the projects (timeframe, major milestones, cost,firm’s role and relevant staff)o Maximum of 5 project examples3. Project ApproachPlease describe:• The approach your team would take to meet the City’s stated objectives. A short narrative of yourfirm’s specialized approach for the City of Port Angeles project with respect to water main design,including proposed schedule, project milestones, and the results expected at the conclusion of theproject.4. Key PersonnelPlease identify:• Key personnel for each service providedo Include resumes and certifications for key personnel and their experience on relevant projectsand contracts (resumes can be included in an appendix and do not count towards the pagelimit).o Identify project managers and any personnel that would interact with City staff and/or thepublic.5. ReferencesPlease include:• A list of up to three people whom City staff may contact for references regarding the pastperformance of the firm, including name, email and phone number.SELECTION PROCESSThe City of Port Angeles in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 USC2000d to 2000d-4 and Title 49, Code of Federal Regulations, Department of Transportation, Subtitle A,Office of the Secretary, Part 21, Nondiscrimination in Federally-Assisted Programs of the Department ofTransportation issued pursuant to such Act, hereby notifies all consultants that it will affirmatively ensurethat in any contract entered into pursuant to this advertisement, disadvantaged business enterprises asdefined at 49 CFR Part 26 will be afforded full opportunity to submit statement of qualifications in responseto this invitation and will not be discriminated against on the grounds of race, color, or national origin inconsideration for an award.The City of Port Angeles is an equal opportunity and affirmative action employer. Small, minority- andwomen-owned businesses are encouraged to submit statement of qualifications.The City of Port Angeles reserves the right to cancel this RFQ, reject any and all responses submitted, tonot award a contract, and to waive any minor irregularities of this RFQ if the best interest of the Citywould be served. No respondent may withdraw their proposal after the submittal deadline, unless theaward of contract is delayed for a period exceeding ninety (90) days.Submit an electronic copy (PDF) of the full SOQ via email no later than 2:00 PM, Thursday, March 5th,2026 to:lbaack@cityofpa.us; rfeller@cityofpa.us; & cc contracts@cityofpa.usThe maximum file size that can be emailed is 20MB. Please include “Transmission Main ReplacementPAWTP to D” on the subject line.Only emailed submittals will be accepted. Receipt time of submittal will be considered the timestampof the incoming email created automatically by the City’s email server. It is the responsibility of theConsultants to confirm that the electronic submittal has been received by the City prior to the submittaldeadline.All questions regarding this RFQ shall be submitted via email to lbaack@cityofpa.us &rfeller@cityofpa.us. No responses will be provided for questions submitted after 2:00 PM (PDT),
- Commodity Codes
-
- NAICS 237110Water and Sewer Line and Related Structures Construction
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Sumner Library Construction R...
Project: Sumner Library Construction Re-Bid - Pierce County Library System Ref. #: 062926
Sammamish Plateau Water
Bid Due: 7/17/2026
TDA Auxiliary Water Supply (A...
Follow TDA Auxiliary Water Supply (AWS) Backup Debris Management Active Contract Opportunity Notice
DEPT OF DEFENSE
Bid Due: 7/30/2026