Request for Proposals: 2026 Paving Services
Project Information
- Bid Title
- Request for Proposals: 2026 Paving Services
- Issuing Agency
- Gunnison County
- Location
- Colorado
- Published Date
- Jun 2, 2026
- Closing Date
- Jul 1, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Title: Request for Proposals: 2026 Paving Services
Category: Public Works Status: Open Description: Gunnison County Public Works is requesting sealed proposals from qualified asphalt paving contractors to furnish and place hot-mix asphalt (HMA) for multiple County Road approaches throughout Gunnison County, Colorado. All asphalt placed under this contract shall meet current CDOT specifications for mountain paving conditions.
Gunnison County will provide all traffic control and all dirt work / subgrade preparation. The contractor will be responsible for asphalt production, placement, compaction, and quality control testing as specified. A bid alternate exists for hauling/trucking of material where either the contractor or the County will be responsible for this task.
Gunnison County wants to be a supportive and collaborative owner of this contract. The successful delivery of road paving is important to the annual safety and maintenance of the public roadways.
Responses to this Request for Proposal (RFP) will be used to identify a qualified contractor to lead this project.
Publication Date/Time: 6/2/2026 8:00 AM Closing Date/Time: 7/1/2026 4:00 PM Contact Person: Martin Schmidt, Assistant County Manager for Public Works
mschmidt@gunnisoncounty.orgRelated Documents: - Attachment Preview
-
Request for Proposals(RFP)2026 Paving ServicesA Public Improvement Project inGunnison County, ColoradoPrepared by:Gunnison County Public Works195 Basin Park Drive Gunnison, CO812301Table of ContentsSECTIONIIIIIIIVVVITITLESummary IntroductionProject ScopeProcessSubmission RequirementsEvaluation Criteria & Review ProcessGeneral ConditionsPAGE34679102Section ISummary IntroductionIntroductionGunnison County Public Works is requesting sealed proposals from qualified asphalt pavingcontractors to furnish and place hot‑mix asphalt (HMA) for multiple County Road approachesthroughout Gunnison County, Colorado. All asphalt placed under this contract shall meet currentCDOT specifications for mountain paving conditions.Gunnison County will provide all traffic control and all dirt work / subgrade preparation. Thecontractor will be responsible for asphalt production, placement, compaction, and quality controltesting as specified. A bid alternate exists for hauling/trucking of material where either the contractoror the County will be responsible for this task.Gunnison County wants to be a supportive and collaborative owner of this contract. The successfuldelivery of road paving is important to the annual safety and maintenance of the public roadways.Responses to this Request for Proposal (RFP) will be used to identify a qualified contractor to lead thisproject.3Section IIProject ScopeProject Description:A. Project Locations and QuantitiesThe project consists of paving work at the following County Road approaches. Lengths areapproximate and will be field fit. “Quads” refer to heavy-haul tandem trucks with drop axles thatcarry approximately 28 tons.1. Park and Bevington (CR 16 & CR 19): Approach – 400 ft – 8 quads;2. Bassel Road (CR 10C): Approach – 80 ft – 2 quads;3. Cranor Subdivision (CR 10C): Approach – 80 ft – 2 quads;4. Candlelight Lane (CR 10F): Approach – 150 ft (both sides of well house) and paving of islandbetween mailboxes and CR 10 – 4 quads;5. Lost Canyon (CR 743): Approach – 150 ft – 4 quads;6. Allen Lane (CR 8 off CR 730): Approach – 300 ft – 6 quads;7. Wiley Lane (CR 818): Approach – 250 ft – 6 quads;8. Miller Lane (CR 7): Approach – 100 ft – 4 quads;9. Stubbs (CR 41): Approach – 80 ft – 2 quads;10. Hartman’s Entrance: Approach – 80 ft – 2 quads;11. CR 44 (Woods Gulch Cutoff / Quartz Creek): Approach – 120 ft – 2 quads;12. CR 771 (Gold Creek): Approach – 80 ft – 2 quads;13. Kebler Pass Overlay – From Crested Butte Town Limits to Trappers Curve – approx. 1,600 ftat 22‑ft width;The bid assumes a mat thickness of 3 inches. Exact paving widths, tie‑ins, and limits will bereviewed with the contractor during a pre‑construction meeting. Alignment with CDOTSection 401, CP 52, and/or the CAPA design guide for HMA mix design.B. The contractor is responsible for:1. Producing and/or supplying HMA meeting CDOT mountain-region specifications;2. Place and compact asphalt;3. Perform compaction testing;4. Shape, finish, and uniformly match existing roadway and approach grades;5. Conduct any required QC testing;6. Coordinate daily operations with County Public Works staff;7. Protect adjacent surfaces and infrastructure during paving;8. Complete all cleanup work after paving.Alternate A:1. Contractor provides trucking of material to job site location and includes this cost in the per-ton rate.The County does not truck materials. Please provide two separate cost breakdowns.4C. County responsibilities:1. All traffic control;2. All subgrade preparation and dirt work;3. Trucking of asphalt to the sites unless Alternate A is awarded.CI. Additional Information about scope:1. Overnight parking accommodations during the project can be arranged in advance in Gunnisonor Crested Butte.2. Prices are expected to be expressed on a per ton basis.3. Contractor shall supervise and direct the Work competently and efficiently, devoting suchattention thereto and applying such skills and expertise as may be necessary to perform theWork in accordance with the Contract Documents. Contractor shall be solely responsible forthe means, methods, techniques, sequences, safety, and procedures of construction (paving).4. Contractor shall assign a competent resident superintendent who is to be present at all timesduring the execution of the Work.5. Contractor shall at all times maintain good discipline and order at the Site.6. Except as otherwise required for the safety or protection of persons or the Work or property atthe Site or adjacent thereto, and except as otherwise stated in the Contract Documents, allWork at the Site shall be performed during regular working hours, Monday through Friday.7. Unless otherwise specified in the Contract Documents, Contractor shall provide and assumefull responsibility for all services, materials, equipment, labor, transportation, constructionequipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitaryfacilities, temporary facilities, and all other facilities and incidentals necessary for theperformance, testing, start up, and completion of the Work, whether or not such items arespecifically called for in the Contract Documents.8. Contractor shall be solely responsible for initiating, maintaining, and supervising safetyprecautions and programs in connection with the Work.9. Contractor warrants and guarantees to Owner that all Work will be in accordance with theContract Documents and will not be defective. Engineer and its officers, directors, members,partners, employees, agents, consultants, and subcontractors shall be entitled to rely onContractor's warranty and guarantee.5
- Commodity Codes
-
- NAICS 237310Highway, Street, and Bridge Construction
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Hover over Oligarchy Ditch Br...
Type Number Description Due By Opening Status IFB 426053 Hover over Oligarchy Ditch
City of Longmont
Bid Due: 7/08/2026
Fort Carson Equipment Concent...
Follow Fort Carson Equipment Concentration Site: Potential Use of Progressive Design Build using
DEPT OF DEFENSE
Bid Due: 7/10/2026