City of Orrick, Install sidewalks on both sides of the street along Elm Street (Kirkham to Bissell) and Pine Street (Kirkham to Bissell)
Project Information
- Bid Title
- City of Orrick, Install sidewalks on both sides of the street along Elm Street (Kirkham to Bissell) and Pine Street (Kirkham to Bissell)
- Issuing Agency
- Missouri Department of Transportation(MDOT)
- Location
- Missouri
- Published Date
- Nov 12, 2025
- Closing Date
- Nov 26, 2025
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
New Posting Posting Date Project Number Solicitation LPA Contact LPA Phone LPA Email Due Date NEW 11/12/25 STBG-3301(539) City of Orrick, Install sidewalks on both sides of the street along Elm Street (Kirkham to Bissell) and Pine Street (Kirkham to Bissell) Deanna Hufford 816-770-3607 deanna.hufford@cityoforrick.org 11/26/25 - Attachment Preview
-
City of OrrickPO Box 227205 W South Front St.Orrick, MO 64077November 3, 2025Dear Consultant:The City of Orrick, Missouri is requesting the services of a consulting engineering firm toperform the described professional services for the project included on the attached list. If yourfirm would like to be considered for these consulting services, you may express your interest byresponding to the appropriate office, which is indicated on the attachments. Limit your letter ofinterest to no more than THREE PAGES. This letter should include any information that mighthelp us in the selection process, such as the persons or team you would assign to each project, thebackgrounds of those individuals, and other projects that your company has recently completedor that are now active. It is required that your firm’s Statement of Qualification (RSMo 8.285through 8.291) be submitted with your firm’s Letter of Interest or be on file with the City ofOrrick. The statement of qualification is not included in the total page-count limit.DBE firms must be listed in the MRCC DBE Directory located on MoDOT’s website atwww.modot.gov, in order to be counted as participation towards an established DBE Goal. Weencourage DBE firms to submit letters of interest as prime consultants for any project they feelcan be managed by their firm.Pursuant to the Brooks Act for Consultant Selection – the following criteria will be the basis forselection.• Project Approach/Innovation and Understanding:• Experience and Technical Competence:• Capacity and Capability/Schedule:• Past Record of Performance on Similar Projects:• Firm’s Proximity and Familiarity:40 Max Points30 Max Points10 Max Points10 Max Points10 Max PointsWe request all letters be received by 4:00 PM, Wednesday, November 26th, 2025 at Orrick CityHall, located at 207 West South Front Street, Orrick, MO 64077.Sincerely,Deanna HuffordClerk, City of OrrickAttachmentCity of Orrick, MissouriFederal Aid No:Location:Proposed Improvement:Length:Approximate Construction Cost:DBE Goal Determination:Consultant Services Required:Other Comments:Contact:Deadline:STBG: 3301539Orrick, MissouriInstall sidewalks on both sides of the street along Elm Street(Kirkham to Bissell) and Pine Street (Kirkham to Bissell) with bidoptions to construct sidewalks along Elm Street (Bissell to Floyd),Pine Street (Bissell to Creason), and Kirkham Street (Sibley toElm).(base plus options; see alignment alternatives above)$495,0000%SIDEWALK DESIGN & CONSTRUCTION:Design Phase: The design phase engineering responsibilities mayinclude but are not limited to: preparing conceptual plans,preliminary plans, contract plans, and right-of-way plans;preparing and submitting necessary permits and contractdocuments; assisting with the bidding process for ADA compliantsidewalks; and preparing PS&E and final documents. Theengineer must manage easement acquisition of both temporaryconstruction easements and permanent easements, and gathertopographic surveying data for design.Construction Phase: The construction phase engineeringresponsibilities may include but are not limited to: working withthe contractor on behalf of the City, assisting with thepreconstruction conference, performing periodic site inspections,preparing change orders, inspecting construction materials,checking shop drawings submitted by the contractor, observing thecontractor’s construction material testing and quality controlprocedures, observing critical construction operations, performingfull-time inspections, and reporting and participating in the finalinspection.Administrative Coordination: as required, the engineer mustmanage administrative processes related to grant coordinationbetween the City of Orrick, MoDOT, and MARC.N/AName: Deanna HuffordAddress: 207 West South Front Street, Orrick, MO 64077Phone: 816-770-3607Email: deanna.hufford@cityoforrick.org4:00 PM, Nov 26, 2025• Submit: Letter of interest should not exceed THREE PAGES total. A page is defined as 8-1/2 by11 inches and printed on one side. Seven copies of the letter interest should be received at theaddress and by the time specified.
- Commodity Codes
-
- NAICS 237310Highway, Street, and Bridge Construction
- NAICS 238110Poured Concrete Foundation and Structure Contractors
- NAICS 238990All Other Specialty Trade Contractors
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
City of Ladue Exterior Buildi...
City of Ladue Exterior Building Improvements StatusAccepting Bids Bid Date 7/13/26 10:00am Company
Drexel Technologies
Bid Due: 7/13/2026
SW District, City of Clinton,...
Status Bid Advertisement Post Date Revision Date Letting Date NEW SW District, City
Missouri Department of Transportation(MDOT)
Bid Due: 7/08/2026