Bid No. B2026-002 Mira Costa H.S Sports Field Barrier Netting #2 Addendum 1
Project Information
- Bid Title
- Bid No. B2026-002 Mira Costa H.S Sports Field Barrier Netting #2 Addendum 1
- Issuing Agency
- Manhattan Beach Unified School District
- Location
- California
- Published Date
- Jan 13, 2026
- Closing Date
- Jan 13, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid No. B2026-002 Mira Costa H.S Sports Field Barrier Netting #2
NOTICE CALLING FOR BIDS – Bid No. B2026-002
The Board of Education of the Manhattan Beach Unified School District is requesting bids for the Mira Costa H.S. Sports Field Barrier Netting #2 (Bid No. B2026-002). All bids must be submitted on forms furnished by the District to the District Office.Please see Bid Documents for full information and requirements:
- B2026-002 Mira Costa H.S. Sports Field Barrier Netting #2
- B2026-002 Scope of Work
- B2026-002 Project Plans DSA
- B2026-002 Project Plans DSA - Addendum 1
Key dates:
-
Mandatory Job Walk………………………………..December 19th, 2026 @ 10:00 AM
- Location: Mira Costa High School Front Office
- Deadline for Submittal of Questions…….….December 30th, 2025 @ 3:00 PM
- Responses to the Questions Submitted ……January 6th, 2026 @ 3:00 PM
- Due Date for Submittal of Bids………………..January 13th, 2026 by 3:00 PM
- Attachment Preview
-
Mira Costa H.S. Sports Field Barrier Netting #2ATMira Costa High School1401 Artesia BlvdDSA Application No. A#03-124951Bid No. B2026-002Manhattan Beach Unified School District325 South Peck AveManhattan Beach, CA 90266THIS PAGE INTENTIONALLY LEFT BLANK FOR PRINTING PURPOSESTABLE OF CONTENTSPageNOTICE INVITING BIDS..............................................................................................................1INSTRUCTIONS TO BIDDERS ....................................................................................................3DESIGNATION OF SUBCONTRACTORS ................................................................................10DESIGNATION OF SUBCONTRACTORS FORM....................................................................11BID FORM ....................................................................................................................................13CONTRACTOR’S CERTIFICATE REGARDING WORKERS’ COMPENSATIONFORM ................................................................................................................................18NON-COLLUSION DECLARATION .........................................................................................19BID GUARANTEE FORM ...........................................................................................................20BID BOND FORM ........................................................................................................................21AGREEMENT FORM...................................................................................................................24PAYMENT BOND ........................................................................................................................28PERFORMANCE BOND..............................................................................................................31GUARANTEE ...............................................................................................................................35ESCROW AGREEMENT FOR SECURITY DEPOSITS IN LIEU OF RETENTION ...............36CONTRACTOR CERTIFICATION REGARDING BACKGROUND CHECKS.......................39ARTICLE 1 DEFINITIONS.......................................................................................................411.1 BASIC DEFINITIONS ..........................................................................................411.2 EXECUTION, CORRELATION AND INTENT .................................................461.3 OWNERSHIP AND USE OF ARCHITECT’S DRAWINGS,SPECIFICATIONS AND OTHER DOCUMENTS..............................................481.4 INFORMATION AND SERVICES REQUIRED OF THE OWNER ..................49ARTICLE 2 OWNER .................................................................................................................502.1 [Reserved] ..............................................................................................................502.2 OWNER’S RIGHT TO CARRY OUT THE WORK DUE TO PARTIALDEFAULT IN A SPECIFIC SEGREGATED AREA OF WORK (TWO (2)BUSINESS DAY NOTICE TO CURE AND CORRECT)...................................50Table of ContentsPage 1ARTICLE 3 THE CONTRACTOR............................................................................................523.1 SUPERVISION AND CONSTRUCTION PROCEDURES .................................523.2 SUPERVISION......................................................................................................533.3 LABOR AND MATERIALS ................................................................................543.4 WARRANTY ........................................................................................................573.5 TAXES...................................................................................................................573.6 PERMITS, FEES AND NOTICES........................................................................573.7 SUBMITTALS REQUIRED AT THE COMMENCEMENT OF THEPROJECT ...............................................................................................................583.8 DOCUMENTS, SAMPLES, AND COMPUTER AT THE SITE.........................583.9 SUBMITTALS INCLUDING SHOP DRAWINGS, PRODUCT DATA,AND SAMPLES ....................................................................................................593.10 SUBSTITUTIONS.................................................................................................633.11 INTEGRATION OF WORK .................................................................................633.12 CLEANING UP .....................................................................................................643.13 ACCESS TO WORK.............................................................................................653.14 ROYALTIES AND PATENTS .............................................................................653.15 [Reserved] ..............................................................................................................663.16 [Reserved] ..............................................................................................................663.17 AS-BUILT DRAWINGS AND ANNOTATED SPECIFICATIONS...................663.18 EQUIPMENT MANUALS....................................................................................663.19 DIR REGISTRATION...........................................................................................67ARTICLE 4 ADMINISTRATION OF THE CONTRACT AND CLAIMS..............................684.1 ARCHITECT .........................................................................................................684.2 ARCHITECT’S ADMINISTRATION OF THE CONTRACT ............................684.3 PROJECT INSPECTOR ........................................................................................694.4 STOP WORK ORDER ..........................................................................................704.5 RESPONSIBILITY FOR ADDITIONAL CHARGES INCURRED BYTHE OWNER FOR PROFESSIONAL SERVICES .............................................714.6 DISPUTES AND CLAIMS ...................................................................................72ARTICLE 5 SUBCONTRACTORS ..........................................................................................785.1 DEFINITIONS.......................................................................................................78ARTICLE 6 CONSTRUCTION BY OWNER OR BY SEPARATE CONTRACTORS..........796.1 OWNER’S RIGHT TO PERFORM CONSTRUCTION AND TO AWARDSEPARATE CONTRACTS ..................................................................................796.2 [Reserved] ..............................................................................................................796.3 OWNER’S RIGHT TO CLEAN UP .....................................................................79ARTICLE 7 CHANGES IN THE WORK .................................................................................807.1 CHANGES.............................................................................................................807.2 CHANGE ORDERS (“CO”) .................................................................................80Table of ContentsPage 27.3 CONSTRUCTION CHANGE DOCUMENT (CCD Category A, and CCDCategory B) and IMMEDIATE CHANGE DIRECTIVE (ICD) ...........................817.4 REQUEST FOR INFORMATION (“RFI”) ..........................................................827.5 REQUEST FOR PROPOSAL (“RFP”) .................................................................837.6 CHANGE ORDER REQUEST (“COR”) ..............................................................837.7 COST OF CHANGE ORDERS.............................................................................84ARTICLE 8 TIME AND SCHEDULE ......................................................................................908.1 DEFINITIONS.......................................................................................................908.2 HOURS OF WORK...............................................................................................908.3 PROGRESS AND COMPLETION .......................................................................908.4 EXTENSIONS OF TIME - LIQUIDATED DAMAGES .....................................93ARTICLE 9 PAYMENTS AND COMPLETION .....................................................................949.1 CONTRACT SUM ................................................................................................949.2 COST BREAKDOWN ..........................................................................................949.3 PROGRESS PAYMENTS.....................................................................................949.4 APPLICATIONS FOR PROGRESS PAYMENTS...............................................959.5 STOP NOTICE CLAIMS AND WARRANTY OF TITLE ..................................979.6 DECISIONS TO WITHHOLD PAYMENT .........................................................979.7 NONCONFORMING WORK...............................................................................999.8 [Reserved] ..............................................................................................................999.9 COMPLETION OF THE WORK..........................................................................999.10 PARTIAL OCCUPANCY OR USE....................................................................1039.11 COMPLETION AND FINAL PAYMENT .........................................................1039.12 SUBSTITUTION OF SECURITIES ...................................................................106ARTICLE 10 PROTECTION OF PERSONS AND PROPERTY.........................................10710.1 SAFETY PRECAUTIONS AND PROGRAMS .................................................10710.2 SAFETY OF PERSONS AND PROPERTY.......................................................10810.3 EMERGENCIES..................................................................................................11110.4 HAZARDOUS MATERIALS .............................................................................111ARTICLE 11 INSURANCE AND BONDS ..........................................................................11311.1 CONTRACTOR’S LIABILITY INSURANCE ..................................................11311.2 WORKERS’ COMPENSATION INSURANCE ................................................11511.3 BUILDER’S RISK/ “ALL RISK” INSURANCE ...............................................11511.4 FIRE INSURANCE .............................................................................................11611.5 AUTOMOBILE LIABILITY ..............................................................................11611.6 OTHER INSURANCE ........................................................................................11611.7 PROOF OF INSURANCE...................................................................................11611.8 COMPLIANCE....................................................................................................11711.9 WAIVER OF SUBROGATION..........................................................................11711.10 PERFORMANCE AND PAYMENT BONDS ...................................................117Table of ContentsPage 3
- Commodity Codes
-
- NAICS 237990Other Heavy and Civil Engineering Construction
- NAICS 238990All Other Specialty Trade Contractors
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Follow Ice and Reefer Rental Active Contract Opportunity Notice ID W912LA26QA018 Related Notice
DEPT OF DEFENSE
Bid Due: 7/06/2026
RFQ - AS-NEEDED VECTOLEX AND ...
RFx Name: BPM013241 RFx Begin Date (UTC+0): RFQ - AS-NEEDED VECTOLEX AND VECTOPRIME
San Diego County
Bid Due: 7/22/2026