Pool Liner Replacement & Pool Cover
Project Information
- Bid Title
- Pool Liner Replacement & Pool Cover
- Issuing Agency
- State Government of Arkansas
- Location
- Arkansas
- Published Date
- Mar 11, 2026
- Closing Date
- Mar 23, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- MMQB-26-028
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Current Solicitations Bid Information Bid Number: MMQB-26-028 Agency: Department of Parks and Tourism Opening Date & Time: 03/23/2026 04:00 PM CDT Description: Pool Liner Replacement & Pool Cover Buyer's Email: Jennifer.a.dury@arkansas.gov Bid Documents PDF XLS Other Web MMQB-26-028 Attachment 1 and 2 SOW and Specifications MMQB-26-028 Sample Service Contract (SRV-1) MMQB-26-028 Performance and Payment Bond Form MMQB-26-028 Bid Response Packet MMQB-26-028 Official Bid Price Sheet MMQB-26-028 Pool Liner Replacement and Pool Cover - Attachment Preview
-
MMQB-26-028Attachment # 1 Scope of Work & SpecificationsPark Contact Information:Superintendent: Jay SchneiderEmail: Jay.Schneider@arkansas.govPhone: (479) 761-3825Assistant Superintendent: Tim ScottEmail: Tim.Scott@arkansas.govPhone: (479) 761-3325Mailing Address: 11333 West AR Highway 74West Fork, AR 72774Delivery Address: 11333 West AR Highway 74West Fork, AR 72774Safety & Protection• Contractor shall furnish and maintain both Workmen’s Compensation and GeneralLiability Insurance.• Contractor shall construct and/or apply markers, barricades, and safety measuresto ensure safe working conditions for employees, Park Staff and Visitors.• Contractor shall protect work site(s) and adjacent park area(s) from onset to projectcompletion from debris that could impact parking areas, landscaping, walkwaysand other accessible buildings and common areas near and around the work site(s).• Contractor shall be responsible for all post-project clean-up.• Contractor shall remove all debris (including nails and metals, all disposablematerials offsite) at the end of each workday.• Contractor shall be responsible for all materials deliveries and protection ofmaterials and equipment during construction.• Contractor shall be responsible for any permits that may be required.• ADPHT is not responsible for equipment or materials left on project site.The Contractor shall furnish all labor, materials, tools, equipment, supervision,transportation, and incidentals necessary to complete the entire Scope of Work thatfollows.Page 1 of 5MMQB-26-028Scope of WorkContractor shall furnish, deliver, and fully install one (1) new commercial-grade swimmingpool liner replacement, inclusive of furnishing one (1) premium-grade in ground swimmingpool cover. Contractor is responsible for removal and proper disposal of existing pool liner.Building Number 16.03Common Name of Building: PoolGPS Coordinates: 35.7795,-94.2521Specifications: Pool Liner Replacement and Pool CoverGeneral Information:Devil’s Den State Park’s current pool liner, installed in 2002, needs to be replaced with aRenoSys Commercial liner or a similar, equivalent reinforced membrane liner. The poolmeasures 35’ by 68’ with an average depth of four (4) feet. The shallow end is three feetdeep with five (5) risers across the width of the pool. The deep end is five (5) feet deep. Theslope is 1:20. The 2002 construction prints are available for review upon request.This bid also includes a safety mesh pool cover.Project Location:The pool is located next to the Ridge Runner Cafe and store, adjacent to Lake Devil.Minimum Specifications for Pool Liner Replacement and Pool CoverPool Liner:• Contractor to remove and replace pool liner with RenoSys or similar reinforcedcommercial-grade membrane liner.• New liner shall be a RenoSys or similar reinforced commercial-grade membrane, 60mil PVC liner.• Contractor to provide proper disposal of old liner.• Contractor shall ensure proper preparation of pool surface for application ofgeotextile felt.• Install and secure liner.• Weld seams for a watertight seal.• Contractor shall attach flanges at penetrations, if necessary, to ensure liner remainssecure and leak-free.• Contractor shall perform final inspection of liner prior to re-filling the pool.Page 2 of 5MMQB-26-028• Pool liner construction must meet or exceed the specifications for a RenoSys 60 mil,reinforced, textured PVC membrane.• Warranty: Shall cover delamination, pitting, leaks, tearing, cracking and/or failure toremain watertight.o Coverage Term - 10 years from the date of installationo Coverage Type - Full repair or replacement (not prorated)o Components - Minimum one (1) year warranty for fasteners, caulk, and fittingPool Cover:• Contractor to provide premium grade, in-ground swimming pool safety cover.• Pool Cover construction and fitments must meet or exceed the following minimumspecifications:o Two-ply/High-strength, heavy duty 98% shade mesho Load-bearing Capacity: Minimum Break strength of 4000 lbs.o Two (2) foot perimeters overlap for secure fit.o Must have wear-resistant strips on underside of covero Stitching: triple stitchingo Must have Double, reinforced strapso Stainless steel springso Buckleso Complete installation kit, including toolso Storage Bag• Warranty: Minimum pro-rated, ten (10) year warrantyWork Schedule:• Work will only be permitted Monday – Friday from 8:00 A.M. to 5:00 P.M. CST.• All workdays and work hour scheduling require prior approval from the ParkSuperintendent.Finalization:• All work must be completed and inspected within 60 days of award. (excludingapproved weather or material delays)• Perform final site clean-up.• Contact Park Superintendent Jay Schneider (479) 761-3825 once complete for finalinspection, acceptance and approval prior to invoicing.Page 3 of 5MMQB-26-028Additional/Other:• All Bidders are required to have an on-site visit scheduled with the ParkSuperintendent. Signed Site Visit Verification Form is required for bid submissionand acceptance. Make appointment with Park for site visit.• VENDOR IS RESPONSIBLE FOR ALL MEASUREMENTS BEING VERIFIED.Any damage discovered will be reported to park representative in writing and will besubmitted to ADPT Central Office Buyer, prior to any repair work being completed.Page 4 of 5MMQB-26-028CriteriaAttachment #2 Performance StandardsStandardDamagesCompliance withSpecifications of SOWAll materials, methods, andinstallation match contractspecifications and applicablecodes.Corrective work atContractor’s expense;withholding payment untilcorrected.Quality of WorkTimeliness of WorkMaterial Protection & SecuritySafety & Protection MeasuresPool membrane/liner must befree of leaks, defects or visibleinstallation errors. Noavoidable damage tostructure. Proper precautionsare taken to prevent waterintrusion.Passing inspection by ADPHTMaintenance Coordinator.Work to be completed within60 days of award. Contractorshall communicateanticipated delays within 24hours of recognizing orbecoming aware.All materials stored andprotected from weatherRepairs or replacement atContractor’s expense; delayedor possible reduced paymentfor work that does not passinspection.Extensions must be approvedby ADPHT ParkSuperintendent. Possibletermination for cause.Contractor shall beresponsible for thereplacement of damagedmaterials at no additional costto the State.Work areas are cordoned off,debris removed, and work areacleaned up daily, staff arefollowing industry standardsafety precautionsWork stoppage untilcompliant. Possibletermination for cause.Permit & InsuranceComplianceObtained and maintainedthroughout projectWork stoppage. Possibletermination for cause.Page 5 of 5
- Commodity Codes
-
- NAICS 238990All Other Specialty Trade Contractors
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Retrofit Metal Roof at Wright...
NOTICE TO CONTRACTORS Sealed bids will be received until 2:00PM, July 23, 2026,
Arkansas Democrat-Gazette
Bid Due: 7/23/2026
2024 CFP PHASE II Minor Const...
INVITATION TO BID JOB NO. AR-02-26H The Housing Authority of the City of
Arkansas Democrat-Gazette
Bid Due: 7/15/2026