CONTRACT NO. C211 - FEMA SANDY POWER SUPPLY AND PLANT WIDE PROJECT

Project Information

Bid Title
CONTRACT NO. C211 - FEMA SANDY POWER SUPPLY AND PLANT WIDE PROJECT
Issuing Agency
Bergen County
Location
New Jersey
Published Date
Mar 8, 2026
Closing Date
Apr 15, 2026
Government Level
State & Local
Status
Closed
Ref. #
BCUA-25-C211
Original Source
Join to Access Full Details
Project Description
Project: CONTRACT NO. C211 - FEMA SANDY POWER SUPPLY AND PLANT WIDE PROJECT
Ref. #: BCUA-25-C211
Department: BC Utilities Authority
Type: RFB
Status:
Open
Open Date: Dec 24th 2025, 9:00 AM EST
Questions Due Date: Mar 13th 2026, 12:00 PM EDT
Close Date: Apr 15th 2026, 3:00 PM EDT

Project Description: A. The Work is located in Little Ferry, New Jersey at the Bergen County Utilities Authority Little Ferry Water Pollution Control Facility (BCUA LFWPCF) near the intersection of Empire Blvd and Mehrhof Road.
B. The Work to be performed under Contract No. C211 – FEMA Sandy Power Supply and Plant Wide Project includes, furnishing all labor, materials, equipment and incidentals required to complete the Power Supply, Floodwall and Plantwide Improvements in their entirety as shown on the Contract Documents and as specified herein.
C. This project consists of restoration and mitigation of power supply and plantwide systems throughout the Little Ferry Water Pollution Control Facilities. The power supply flood mitigation measures also include elevating, replacing and flood proofing major electrical components and constructing elevated platforms above the 500 year flood elevation at the Main Switchyard, Main Switchgear Building, six critical Substations (No. 1 through 6), replacing existing feeders, existing cables and existing duct banks, constructing a second story on and reinforcing the Main Switchgear building, constructing parallel duct bank, and performing other related activities like installation of fencing, gates, stairs, and concrete pads.
D. The proposed plantwide scope of work includes the installation of flood walls and flood barriers, dry flood proofing wall apertures, sealing pipe penetrations, raising and replacing existing electrical equipment, and replacing mechanical equipment with submersible type equipment which are all better suited for future flooding conditions. This work impacts the following locations: Main Pump Buildings No. 1 and 2, Primary Sludge Pumping Stations No. 1 through 4, Grit Building, Secondary Sludge Pumping Stations No. 1 through 4, Dewatering Building, Sludge Storage Building, the Control Building, the Administrative Building, Pipe Galleries, and the Lagoon Pumping Station.


Commodity Codes
  • NAICS 236220Commercial and Institutional Building Construction
  • NAICS 335999All Other Miscellaneous Electrical Equipment and Component Manufacturing
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.

Government Bids

Empower Your Bidding Strategy

Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.

  • Access an extensive database of bids, including comprehensive local and state opportunities.
  • Receive customized alerts for the bids that matter most to your business.
  • Explore detailed specifications to ensure precise and competitive submissions.
  • Gain a competitive edge with up-to-date information and exclusive opportunities.

See Also

Environmental Commission Spec...

Bid Title: Environmental Commission Special Meeting February 20, 2026 Category: Environmental Commission Notices

Township of Millburn

Bid Due: 12/31/2026

Alert Generator

Follow Alert Generator Active Contract Opportunity Notice ID W50S8F26QA017 Related Notice Department/Ind. Agency

DEPT OF DEFENSE

Bid Due: 7/14/2026