Coppermine LAS Spray Field Cutting
Project Information
- Bid Title
- Coppermine LAS Spray Field Cutting
- Issuing Agency
- County of Paulding
- Location
- Georgia
- Published Date
- Jul 30, 2025
- Closing Date
- Aug 13, 2025
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- RFQ 26004-5001
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Number: RFQ 26004-5001
Bid Title: Coppermine LAS Spray Field Cutting
Category: Goods/Services Status: Open Description: The Coppermine Land Application System (LAS) Spray Fields area consists of 9 Spray Fields covering a total wetted area of approximately 165 acres. The attached maps show the approximate location of these fields, which are defined by hydraulic grade line (elevation). The cutting limits are slightly larger than the wetted areas.
A land application system is a wastewater treatment process, where wastewater is treated, stored, then sprayed on the fields. As the grass grows, nutrients are absorbed by the grass, and when the hay is cut and removed from the site, treatment of the water is completed. As such, there are a minimum number of cuttings required per year, and a minimum number of bales of hay that must be removed in order to meet treatment requirements.
Spray field cutting must be performed within certain time restraints for irrigation schedules and volumes of treated water disposal. Depending on flows, weather, and operation or maintenance restrictions, the length of time that any one field can be off line is short and subject to change. Only one or two fields can be turned off at any one time, and drying time is required before cutting can begin. It is imperative that the bidder have the appropriate equipment and personnel to complete the cuttings in the available time, with as little as a 24-hour notice.
The grass grown on the spray fields is primarily fescue, and cannot be used for feed stock. Its primary use is to be for erosion control. An accurate record of the size and number of bales removed from the site must be maintained and reported to operational staff at the Coppermine WRF. The grass receives consistent water and nutrients, and as a result grows very thick and fast. It is anticipated that approximately 5 cuttings of all fields will occur in a calendar year from early March through late October.
Publication Date/Time: 7/30/2025 2:30 PM Closing Date/Time: 8/13/2025 10:00 AM Submittal Information: Paulding County Purchasing Office Contact Person: For questions, please send an email to Purchase@paulding.gov. Fee: No charge Business Hours: 8:00 am - 5:00 pm, Mon - Fri Special Requirements: RFQ submission instructions: Companies wishing to provide a quote should provide this document completed in it's entirety including:
- Please provide previous experience cutting wastewater treatment Land Application System spray fields.
- Provide a list of available equipment and staff.
- Provide references for similiar work.
- Provide a completed Contractor Affidavit E-verify Form (attached).
- Provide a Certificate of Liability InsuranceMiscellaneous: All quotes must be submitted in writing by the August 13, 2025 at 10:00 a.m. Late submissions will not be accepted. Quotes may be emailed to purchase@paulding.gov with the subject line "Quote Enclosed- Bid No. 26004-5001, Coppermine LAS Spray Field Cutting". Mailed quotes can be sent to Attn: Purchasing Office, "Quote Enclosed- Bid No. 26004-5001, Coppermine LAS Spray Field Cutting" to 240 Constitution Blvd. Dallas, GA 30132. Related Documents:
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Follow CNC Horizontal Boring Mill Active Contract Opportunity Notice ID SPE4A826P0066 Related Notice
Federal Agency
Bid Due: 7/08/2026
INVITATION FOR BID LMIG 2026 ...
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-66725-NONST-2026-000000016
State Government of Georgia
Bid Due: 7/06/2026