Addendum #1 - Bid #25-10, Ritchen School Roofing Improvement Project
Project Information
- Bid Title
- Addendum #1 - Bid #25-10, Ritchen School Roofing Improvement Project
- Issuing Agency
- Oxnard School District
- Location
- California
- Published Date
- May 27, 2026
- Closing Date
- Jun 2, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid #25-10, Ritchen School Roofing Improvement Project
- Attachment Preview
-
Wednesday, May 27, 2026ADDENDUM #1 – RITCHEN SCHOOLOXNARD SCHOOL DISTRICTBID #25-10 – RITCHEN SCHOOL ROOFING IMPROVEMENT PROJECT 2026NOTICE TO ALL CONTRACTORS SUBMITTING BIDS FOR THIS WORK:You are hereby notified of the following changes, clarifications or modifications to the original ContractDocuments, Project Manual, Drawings, Specifications, and subsequent Addenda. This Addendum shallsupersede the original; Contract Documents, and previous Addenda wherein it contradicts the same and shalltake precedence over anything to the contrary therein. All other conditions remain unchanged.CHANGES AND/OR CLARIFICATIONS TO THE PROJECT MANUAL, CONTRACT DOCUMENTS, DRAWINGS ANDSPECIFICATIONS:CLARIFICATION/CHANGES/ADDITIONS TO THE PROJECT MANUAL:1. Include in base bid a $40,000 allowance for damaged wood replacement at Ritchen School.2. Install vertical Kynar “L” metal panels at designated metal wall panel to stucco terminations; see mapfor locations. “L” panels are to be a minimum of 8”x8” by height of wall. Include underlayment andsealants as needed. Submit shop drawing for review and approval. Color to be selected by Owner3. See Attached map for coping replacement areas.QUESTIONS AND ANSWERS:1. Page 10 of 17 Per 2.8 “Roof Insulation and Insulation Accessories” B. Roof Insulation c. is callingNo insulation size” and ¼” dens deck but on page 12 of 15 the spec’s is calling for 1” see D.2 can youplease confirm will it be 2.5” or 1”?A: Per the specification the total thickness of Polyiso insulation is 1”. Coverboard is ¼”2. Per 075416 page 10 of 15 2.9 Walkway Materials we need a walk pad layout or liner feet so we all couldbid apples to apples?See page 14 of 15 3.8 Walkway Installation calling to install walk pad at all rooftop units and roof hatchwith a walkway path from roof hatch to all roof tops (HVAC units) provide walk pad layout?A: Duplicate question. See addendum for clarification3. At walls where there is wall panels there is no counterflashing do we install a skirt metal?With new insulation the Base flashing at wall is going to be around 4" will that be acceptable?A: Yes, skirt metal is required where missing.Yes, 4-6” base flashing have been approved4. At existing duct supports has L brackets can you provide a detail so we all bid apples to apples?A: See 3.7 Item CEND OF ADDENDUM #1
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
- NAICS 238160Roofing Contractors
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Southeast Water Pollution Con...
Bid Details RFP for DB-140 Southeast Water Pollution Control Plant - Secondary Clarifiers
San Francisco Public Utilities Commission
Bid Due: 8/05/2026
Project: TEC Modernization Addition Ref. #: 2026-1683 Type: ITB Status: Open Open Date:
Alameda-Contra Costa Transit District
Bid Due: 7/21/2026