Addendum #1 - Bid #25-10, Ritchen School Roofing Improvement Project

Project Information

Bid Title
Addendum #1 - Bid #25-10, Ritchen School Roofing Improvement Project
Issuing Agency
Oxnard School District
Location
California
Published Date
May 27, 2026
Closing Date
Jun 2, 2026
Government Level
State & Local
Status
Closed
Original Source
Join to Access Full Details
Project Description
  • Bid #25-10, Ritchen School Roofing Improvement Project

  • Attachment Preview
    Wednesday, May 27, 2026
    ADDENDUM #1 – RITCHEN SCHOOL
    OXNARD SCHOOL DISTRICT
    BID #25-10 – RITCHEN SCHOOL ROOFING IMPROVEMENT PROJECT 2026
    NOTICE TO ALL CONTRACTORS SUBMITTING BIDS FOR THIS WORK:
    You are hereby notified of the following changes, clarifications or modifications to the original Contract
    Documents, Project Manual, Drawings, Specifications, and subsequent Addenda. This Addendum shall
    supersede the original; Contract Documents, and previous Addenda wherein it contradicts the same and shall
    take precedence over anything to the contrary therein. All other conditions remain unchanged.
    CHANGES AND/OR CLARIFICATIONS TO THE PROJECT MANUAL, CONTRACT DOCUMENTS, DRAWINGS AND
    SPECIFICATIONS:
    CLARIFICATION/CHANGES/ADDITIONS TO THE PROJECT MANUAL:
    1. Include in base bid a $40,000 allowance for damaged wood replacement at Ritchen School.
    2. Install vertical Kynar “L” metal panels at designated metal wall panel to stucco terminations; see map
    for locations. “L” panels are to be a minimum of 8”x8” by height of wall. Include underlayment and
    sealants as needed. Submit shop drawing for review and approval. Color to be selected by Owner
    3. See Attached map for coping replacement areas.
    QUESTIONS AND ANSWERS:
    1. Page 10 of 17 Per 2.8 “Roof Insulation and Insulation Accessories” B. Roof Insulation c. is calling
    No insulation size” and ¼” dens deck but on page 12 of 15 the spec’s is calling for 1” see D.2 can you
    please confirm will it be 2.5” or 1”?
    A: Per the specification the total thickness of Polyiso insulation is 1”. Coverboard is ¼”
    2. Per 075416 page 10 of 15 2.9 Walkway Materials we need a walk pad layout or liner feet so we all could
    bid apples to apples?
    See page 14 of 15 3.8 Walkway Installation calling to install walk pad at all rooftop units and roof hatch
    with a walkway path from roof hatch to all roof tops (HVAC units) provide walk pad layout?
    A: Duplicate question. See addendum for clarification
    3. At walls where there is wall panels there is no counterflashing do we install a skirt metal?
    With new insulation the Base flashing at wall is going to be around 4" will that be acceptable?
    A: Yes, skirt metal is required where missing.
    Yes, 4-6” base flashing have been approved
    4. At existing duct supports has L brackets can you provide a detail so we all bid apples to apples?
    A: See 3.7 Item C
    END OF ADDENDUM #1
    Commodity Codes
    • NAICS 236220Commercial and Institutional Building Construction
    • NAICS 238160Roofing Contractors
    * Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.

    Government Bids

    Empower Your Bidding Strategy

    Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.

    • Access an extensive database of bids, including comprehensive local and state opportunities.
    • Receive customized alerts for the bids that matter most to your business.
    • Explore detailed specifications to ensure precise and competitive submissions.
    • Gain a competitive edge with up-to-date information and exclusive opportunities.

    See Also

    Southeast Water Pollution Con...

    Bid Details RFP for DB-140 Southeast Water Pollution Control Plant - Secondary Clarifiers

    San Francisco Public Utilities Commission

    Bid Due: 8/05/2026

    TEC Modernization Addition

    Project: TEC Modernization Addition Ref. #: 2026-1683 Type: ITB Status: Open Open Date:

    Alameda-Contra Costa Transit District

    Bid Due: 7/21/2026