Chavez High School Theater Stage Update Project- IFB 26-09 ADDENDUM #3
Project Information
- Bid Title
- Chavez High School Theater Stage Update Project- IFB 26-09 ADDENDUM #3
- Issuing Agency
- Stockton Unified School District
- Location
- California
- Published Date
- Apr 16, 2026
- Closing Date
- Apr 20, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
- Chavez High School Theater Stage Update Project- IFB 26-09
- Attachment Preview
-
John Sergio Fisher & Associates Inc.5567 Reseda Blvd. Suite 209Los Aneles, CA 91356818.344.3045Fax 818.344.0338ADDENDUM #3jsfaProject:Date:Owner:Architect:CESAR CHAVEZ H.S. THEATRE RENOVATION2929 Windflower LaneStockton, CA 95212April 15, 2026Stockton Unified School District1944 El Pinal DriveStockton, CA 95212John Sergio Fisher & Associates5567 Reseda Boulevard, Suite 209Los Angeles, CA 91356A. This Addendum of clarifications, modifications, changes, additions, and/or deletions containedherein shall be considered part of the Bid Documents for the above referenced Project asthough it had been issued at the same time and shall be incorporated integrally with theConstruction Documents for the project. Where provisions of the following supplementarydata differ from those of the Original Bid Documents, this Addendum shall govern and takeprecedence.B. Bidders are hereby notified that they shall make any adjustments in their estimates as aresult of this Addendum. It will be understood that each bidder's proposal is submitted withfull knowledge of all modifications and supplemental data specified herein.• Bid Due Date: Monday, April 20 at 3PM.•There is no Specification Division 27, all AV scope is included in the AVdrawings.• Answers for RFI questions:1.There are 16 channels of new SXLD+ wireless microphone receiversshown on the Sheet AV403 AV equipment riser, but there are no wirelesstransmitters described. What type (hand-held or beltpack, and how manyof each) are required?Answer: There are 16 SLXD1-G58 Transmitters in the BOM, Wireless bodypack.2.If there are beltpack transmitters required, what make/model/typemicrophones shall be included to work with them?Cesar Chavez Theatre RenovationAddendum 3Page 1 of 3jsfaAnswer: There are 16 SLXD1-G58 Transmitters in the BOM, Wireless bodypack.3.The 16 channels of new wireless receivers are shown connected usingboth analog and Dante on the riser diagram. How are the analogconnections intended to be landed on the sound system inputs? Pleaseprovide a one-line diagram indicating the complete wiring schematicand/or operational intent.Answer: Use the existing patch panel to land the microphones as per thedrawings.4.The new wireless equipment is shown being added to an existingrack of SLXD wireless equipment. What about the four channels of existingwireless in the Main Rack? Is the new wireless equipment intended toreplace or augment the existing equipment?Answer: It would be augmented, but check with client.5.Is this wireless rack intended to be mobile? If so, what antennas shallbe used when the rack is moved?Answer: It is in the existing rack, not mobile. Use the existing antennas.6.Would the District wish to take advantage of the new SLXD+ wirelessequipment’s optional rechargeable battery packs and drop-in charge docksfor maximum performance?Answer: Yes, if it is being replaced by the SLXD+.7.We would recommend the RF VENUE D-ARC as the best performingwireless antenna over the specified Shure ½ waves in this situation. Is thisacceptable?Answer: Please use the Shure since this is what the client requested, butsuggest once awarded.8.Sheet AV501, Detail 5 reads: “EXISTING IO PANEL, REMOVE VIDEO,ADD 4 NETWORK, PROVIDE NEW I/O PANEL, KEEP ALL OTHERCONNECTORS”. Would a new brushed/ anodized aluminum sub plate,Cesar Chavez Theatre RenovationAddendum 3Page 2 of 3containing (4) EtherCon RJ45 connectors attached over the old video jacklocation meet this requirement?Answer: Yes, since it’s an existing IO Panel.jsfa9.Sheet AV501, Detail 6 shows plate PR001, to be installed over centerstage, but the existing projector is mounted at the sound booth. Is this newplate intended for a new projector to be added in the future?Answer: Yes.10.A new Listen Technologies LT-800 ALS transmitter is shown replacingthe old Williams Sound ALS unit, but no ALS receivers or other accessoriesare specified. What quantity and model receiver is required, and whataccessories shall be included?Answer: The accessories are in the BOM, along with the LR-4200-072 Qty 16which are the receivers, universal eye pieces, and lanyards.11.The artist's representation of the new sound system on the planscover page shows the center speaker cluster intact, which makes sense. Theexisting system is set up as LCR, and the center speaker cluster is highquality. However, the riser diagram does not include the center cluster. Willthe center cluster be removed along with the left/right speakers, or not?Answer: The center cluster is existing and wired to the mixer. This does notchange. The drawings only show what is being added or changed, notnecessarily the existing system.12.Will the schedule allow for the above stage work to be completedprior to the stage being demoed and repaired? If not, who will beresponsible for protecting the stage?Answer: The Contractor shall include all necessary protection of the stageduring construction. The District will consider reasonable sequencingsuggestions from the Contractor to expedite the schedule; however,protection of existing conditions remains the Contractor’s responsibility.Cesar Chavez Theatre RenovationAddendum 3Page 3 of 3
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
- NAICS 541330Engineering Services
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Patient Queuing System (Kiosk...
Follow Patient Queuing System (Kiosk) - VA Bakersfield Activation Active Contract Opportunity Notice
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 7/06/2026
SIGN ASM - DESTINATION, SIDE ...
Number Title Type NAICS Code(s) Due Date Issue Date Status RQ143943 SIGN ASM
LA Metro
Bid Due: 7/07/2026