Ustach Middle School Roofing Project
Project Information
- Bid Title
- Ustach Middle School Roofing Project
- Issuing Agency
- Sylvan Union School District
- Location
- California
- Published Date
- Jan 7, 2026
- Closing Date
- Jan 16, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Ustach Middle School Roofing Project , Bid No. 2025-26 #5Bids Due Date: 1/16/26 @1:00 PM, Mandatory Job Walk: 1/6/26 @ 8:00 AMQuestions Due: 1/8/26 @ 12:00 PM, Answers Posted: 1/12/26 @ 3:00 PME-Rate 2026 - Core Network Equipment , RFP 2025-26 #9 CLOSEDRFP Due: January 5, 2026 @ 2:00 PMQuestions Due: December 15, 2025 @ 3:00 PM
- Attachment Preview
-
GENERAL CONDITIONSforCONTRACT OF CONSTRUCTIONBID NO: 2025-26 #5FOR USTACH MIDDLE SCHOOL ROOFING PROJECT2701 KODIAK DRIVEMODESTO, CA 95355SYLVAN UNION SCHOOL DISTRICT605 SYLVAN AVENUEMODESTO, CA 95350Mandatory Job Walk: January 6, 2026 @ 8:00 am, Ustach MSBid Due: January 16, 2026 @ 1:00 pmQuestions Due: January 8, 2026 @ 12:00 pmAnswers Posted: January 12, 2026 @ 3:00 pmBoard Approval: January 27, 2026ii4908-7426-7151, v. 1SUMMARY OF CONTENTSARTICLE 1: GENERAL CONDITIONS ...................................................................................1ARTICLE 2: OWNER ................................................................................................................7ARTICLE 3: THE CONTRACTOR ...........................................................................................10ARTICLE 4: ADMINISTRATION OF THE CONTRACT ......................................................30ARTICLE 5: SUBCONTRACTORS .......................................................................................47ARTICLE 6: CONSTRUCTION BY OWNER OR BY SEPARATE CONTRACTORS ........53ARTICLE 7: CHANGES IN THE WORK ...............................................................................55ARTICLE 8: TIME ....................................................................................................................63ARTICLE 9: PAYMENTS AND COMPLETION ....................................................................68ARTICLE 10: PROTECTION OF PERSONS AND PROPERTY............................................79ARTICLE 11: INSURANCE AND BONDS ..........................................................................85ARTICLE 12: UNCOVERING AND CORRECTION OF WORK ..........................................91ARTICLE 13: MISCELLANEOUS PROVISIONS ..................................................................93ARTICLE 14: TERMINATION OR SUSPENSION OF THE CONTRACT ...........................105i4908-7426-7151, v. 1TABLE OF CONTENTSARTICLE 1 ...................................................1GENERAL CONDITIONS ...........................11.1 BASIC DEFINITIONS ........................11.1.1 THE CONTRACT DOCUMENTS................11.1.2 THE CONTRACT.....................................11.1.3 THE WORK............................................11.1.4 THE PROJECT ........................................21.1.5 THE DRAWINGS.....................................21.1.6 THE SPECIFICATIONS.............................21.1.7 THE PROJECT MANUAL .........................21.1.8 OR 21.1.9 COMPLETION.........................................21.1.10 COMPLETION........................................31.2 EXECUTION, CORRELATION ANDINTENT ..............................................31.2.1 CORRELATION AND INTENT...................31.2.1.1 Documents Complementary andInclusive 31.2.1.2 Coverage of the Drawings andSpecifications ............................................. 31.2.1.3 Conflicts.....................................31.2.1.4 Conformance With Laws............31.2.1.5 Ambiguity...................................41.2.1.6 Execution ...................................41.2.2 ADDENDA AND DEFERRED APPROVALS 51.2.2.1 Addenda .....................................51.2.2.2 Deferred Approvals ...................51.2.3 SPECIFICATION INTERPRETATION ..........51.2.3.1 Titles ..........................................51.2.3.2 As Shown, Etc ............................51.2.3.3 Provide.......................................51.2.3.4 General Conditions....................51.2.3.5 Abbreviations.............................51.2.3.6 Plural .........................................51.2.3.7 Metric.........................................51.2.3.8 Standard Specifications .............61.2.3.9 Absence of Modifiers .................61.3 OWNERSHIP AND USE OFARCHITECT’S DRAWINGS,SPECIFICATIONS AND OTHERDOCUMENTS ....................................6ARTICLE 2 ...................................................7OWNER 72.1 DEFINITION .......................................72.2 INFORMATION AND SERVICESREQUIRED OF THE OWNER ......... 72.2.1 INTENTIONALLY LEFT BLANK .............. 72.2.2 SITE SURVEY ........................................ 72.2.3 SOILS .................................................... 72.2.3.1 Owner Furnished Services ........ 72.2.3.2 Contractor Reliance .................. 72.2.4 UTILITY SURVEY .................................. 82.2.5 INFORMATION....................................... 82.2.6 EXISTING UTILITY LINES; REMOVAL,RELOCATION ....................................... 82.2.6.1 Removal, Relocation ................. 82.2.6.2 Assessment ................................ 82.2.6.3 Notification................................ 82.2.6.4 Underground Utility Clearance 92.2.7 EASEMENTS .......................................... 92.2.8 REASONABLE PROMPTNESS .................. 92.2.9 COPIES FURNISHED............................... 92.2.10 DUTIES CUMULATIVE .......................... 92.3 OWNER’S RIGHT TO STOP THEWORK ................................................ 92.4 OWNER’S RIGHT TO CARRY OUTTHE WORK ....................................... 9ARTICLE 3 ................................................... 10THE CONTRACTOR ................................... 103.1 DEFINITION ...................................... 103.2 SUPERVISION AND CONSTRUCTIONPROCEDURES .................................. 103.2.1 CONTRACTOR ....................................... 103.2.2 CONTRACTOR RESPONSIBILITY ............ 113.2.3 OBLIGATIONS NOT CHANGED BY OTHER’SACTIONS .............................................. 113.2.4 CONTRACTOR RESPONSIBILITY FORREADINESS FOR WORK ........................ 113.2.5 PROJECT MEETINGS.............................. 113.3 SUPERINTENDENT .......................... 113.3.1 FULL TIME SUPERINTENDENT............... 113.3.2 STAFF ................................................... 123.3.3 RIGHT TO REMOVE ............................... 123.4 LABOR AND MATERIALS .............. 123.4.1 CONTRACTOR TO PROVIDE ................... 123.4.2 QUALITY .............................................. 123.4.3 REPLACEMENT...................................... 123.4.4 DISCIPLINE ........................................... 13ii4908-7426-7151, v. 13.5 WARRANTY.......................................133.6 TAXES.................................................133.7 PERMITS, FEES AND NOTICES.......133.7.1 PAYMENT ..............................................133.7.2 COMPLIANCE.........................................133.7.3 CONTRACT DOCUMENTS .......................143.7.4 RESPONSIBILITY....................................143.8 ALLOWANCES ..................................143.8.1 CONTRACT ............................................143.8.2 SCOPE ...................................................143.8.2.1 Prompt Selection........................143.8.2.2 Cost ............................................143.8.2.3 Cost Included in Contract Sum..143.8.2.4 Contract Sum Adjustment ..........143.9 CONTRACTOR’S CONSTRUCTIONSCHEDULES ...................................... 153.9.1 Requirements........................................153.9.2 DSA OVERSIGHT PROCESS...................173.9.3 FAILURE TO MEET REQUIREMENTS .......173.10 DOCUMENTS AND SAMPLES ATTHE SITE............................................183.11 SHOP DRAWINGS, PRODUCT DATA,AND SAMPLES .................................183.11.1 SUBMITTALS DEFINED .........................183.11.1.1 Shop Drawings..........................183.11.1.2 Samples ......................................183.11.1.3 Contractor’s Responsibility .......193.11.1.4 Extent of Review ........................193.11.2 DRAWING SUBMISSION PROCEDURE ....203.11.2.1 Transmittal Letter and OtherRequirements .............................................203.11.2.2 Copies Required.........................203.11.2.3 Corrections ................................203.11.2.4 Approval Prior to Commencementof Work 203.11.3 SAMPLE SUBMISSIONS PROCEDURE......203.11.3.1 Samples Required ......................203.11.3.2 Labels and Instructions..............213.11.3.3 Architect’s Review .....................213.11.3.4 Record Drawings and AnnotatedSpecifications ............................................. 213.11.3.5 Equipment Manuals ...................213.11.3.6 Owner’s Property ......................223.11.4 SUBSTITUTIONS ....................................223.11.4.1 One Product Specified ...............223.11.4.2 Two or More Products Specified .223.11.4.3 Substitution Request Form ........ 223.11.4.4 List of Manufacturers and ProductsRequired 233.11.5 DEFERRED APPROVALS ....................... 233.12 CUTTING AND PATCHING ............. 233.12.1 SCOPE .................................................. 233.12.2 CONSENT ............................................. 233.12.3 STRUCTURAL MEMBERS ...................... 233.12.4 Subsequent Removal .......................... 233.13 CLEANING UP................................... 243.13.1 CONTRACTOR’S RESPONSIBILITY ........ 243.13.2 FAILURE TO CLEANUP ......................... 243.13.3 CONSTRUCTION BUILDINGS ................. 243.14 ACCESS TO WORK ........................... 243.15 ROYALTIES AND PATENTS ........... 243.15.1 PAYMENT AND INDEMNITY.................. 243.15.2 REVIEW ............................................... 253.16 INDEMNIFICATION ......................... 253.16.1 SCOPE: CONTRACTOR .......................... 253.16.2 SCOPE: SUBCONTRACTORS .................. 263.16.2.1 Indemnity................................... 263.16.2.2 Joint and Several Liability ........ 263.16.3 NO LIMITATION ................................... 263.17 OWNER AS INTENDEDBENEFICIARY.................................. 273.18 NOTICE OF EXCUSE FORNONPERFORMANCE ...................... 273.19 RECOVERY OF COSTS, DAMAGES,OR TIME EXTENSIONS FROMOWNER.............................................. 273.20 USE OF FEDERAL FUNDS ............... 27ARTICLE 4 ................................................... 40ADMINISTRATION OF THE CONTRACT 404.1 ARCHITECT....................................... 404.1.1 DEFINITION........................................... 404.1.2 MODIFICATION ..................................... 404.1.3 TERMINATION....................................... 404.2 ARCHITECT’S ADMINISTRATION OFTHE CONTRACT .............................. 414.2.1 STATUS................................................. 414.2.2 SITE VISITS........................................... 414.2.3 LIMITATIONS OF CONSTRUCTIONRESPONSIBILITY .................................. 414.2.4 COMMUNICATIONS FACILITATINGCONTRACT ADMINISTRATION.............. 414.2.5 PAYMENT APPLICATIONS ..................... 41ii4908-7426-7151, v. 14.2.6 REJECTION OF WORK ............................414.2.7 CHANGE ORDERS ..................................424.2.8 WARRANTIES UPON COMPLETION ........424.2.9 INTERPRETATION...................................424.2.10 ADDITIONAL INSTRUCTIONS.................424.2.10.1 Architect’s Interpretations andDecisions 424.2.10.2 Typical Parts and Sections ........434.2.10.3 Dimensions ................................434.3 INSPECTOR OF RECORD .................434.3.1 GENERAL ..............................................434.3.2 INSPECTOR’S OF RECORD’S DUTIES ......434.3.3 INSPECTOR OF RECORD’S AUTHORITY TOREJECT OR STOP WORK........................434.3.4 INSPECTOR OF RECORD’S FACILITIES ....434.4 RESPONSIBILITY FOR ADDITIONALCHARGES INCURRED BY THEOWNER FOR PROFESSIONALSERVICES ..........................................444.5 NOTICES OF POTENTIAL CHANGE,CHANGE ORDER REQUESTS, ANDCLAIMS .............................................. 454.5.1 NOTICE OF POTENTIAL CHANGE ...........454.5.2 CHANGE ORDERS REQUESTS.................464.5.3 DEFINITION OF CLAIM...........................474.5.4 TIME FOR SUBMITTING CLAIM; WAIVER484.5.5 CONTENT OF CLAIM ..............................494.5.5.1 Claim Format; Waiver.......................494.5.5.2 Claims for Additional Money.............504.5.5.3 Claims for Additional Time ...............514.5.5.3.1 Notice of Extent of Claim..............514.5.5.3.2 Unusual and Uncommon WeatherClaims .................................................514.5.5.4 Subcontractor Requests for Money orTime ..................................................... 514.5.6 PROCEDURES FOR CLAIMS (PUBLICCONTRACT CODE SECTION 9204) .........524.5.6.1 Claims ................................................524.5.6.2 Meet and Confer ................................534.5.6.3 Government Code Claim ...................544.5.7 CONTINUING CONTRACT PERFORMANCE554.5.8 CLAIMS FOR CONCEALED OR UNKNOWNCONDITIONS .........................................554.5.8.1 Trenches or Excavations Less ThanFour Feet Below the Surface .............. 554.5.8.2 Trenches or Excavations Greater ThanFour Feet Below the Surface .............. 554.5.9 INJURY OR DAMAGE TO PERSON ORPROPERTY............................................ 56ARTICLE 5 ................................................... 56SUBCONTRACTORS.................................. 565.1 DEFINITIONS .................................... 565.1.1 SUBCONTRACTOR ................................. 565.1.2 SUB-SUBCONTRACTOR ......................... 575.1.3 SPECIALTY CONTRACTORS ................... 575.2 AWARD OF SUBCONTRACTS ANDOTHER CONTRACTS FOR PORTIONSOF THE WORK.................................. 575.2.1 ASSIGNMENT OR SUBSTITUTION - CONSENTOF OWNER ........................................... 575.2.2 GROUNDS FOR SUBSTITUTION ............... 575.2.2.1 No Change in Contract ............. 585.2.2.2 Substitution Due to Clerical Error585.3 SUBCONTRACTUAL RELATIONS. 595.4 CONTINGENT ASSIGNMENT OFSUBCONTRACTS............................. 595.5 SUBCONTRACTOR’SRESPONSIBILITIES ......................... 605.5.1 SUPERVISION BY SUBCONTRACTORS .... 605.5.2 DISCIPLINE AND ORDER ....................... 605.5.3 DEFECTS DISCOVERED ......................... 605.5.4 SUBCONTRACTOR INFORMATION.......... 605.5.5 TEMPORARY STRUCTURES.................... 615.5.6 CHARGES TO SUBCONTRACTOR ............ 615.5.7 FINES IMPOSED ..................................... 615.5.8 PROJECT SIGNS ..................................... 615.5.9 REMEDIES FOR FAILURE TO PERFORM .. 615.5.10 DISPUTES NOT TO AFFECT WORK ....... 625.5.11 APPLICATION FOR PAYMENT ............... 625.5.12 COMPLIANCE WITH PROCEDURES ........ 625.5.13 ON-SITE RECORD KEEPING ................. 625.5.14 NON-EXCLUSIVE OBLIGATIONS........... 62ARTICLE 6 ................................................... 63CONSTRUCTION BY OWNER OR BYSEPARATE CONTRACTORS.......... 636.1 OWNER’S RIGHT TO PERFORMCONSTRUCTION AND TO AWARDSEPARATE CONTRACTS ............... 63iii4908-7426-7151, v. 1
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
- NAICS 238160Roofing Contractors
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
UW18030 MORMON SLOUGH SANITAR...
General Information Due Date: Thursday, July 9, 2026 Opening Time: 2:00 PM Published
City of Stockton
Bid Due: 7/09/2026
Specification No. 26-03, C516...
Specification No. 26-03, C51692, Spillway Maintenance, Pyramid DamDetails Event ID 0000039684 Format/Type: Sell
State Government of California
Bid Due: 7/22/2026