67th Sewer Interceptor Upsizing
Project Information
- Bid Title
- 67th Sewer Interceptor Upsizing
- Issuing Agency
- Arlington city
- Location
- Washington
- Published Date
- Apr 17, 2026
- Closing Date
- May 5, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- P02.530
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Number: P02.530
Bid Title: 67th Sewer Interceptor Upsizing
Category: Open Status: Open Description: Notice is hereby given that sealed proposals will be received by the City of Arlington Public Works Department, 154 W. Cox, Arlington, Washington 98223, until 2:00 PM, local timeTuesday, May 5, 2026, for furnishing the necessary labor, materials, equipment, tools, and guarantees thereof to perform the project.
Engineer's estimate is $2,150,000.00
A non-mandatory pre-bid meeting has been scheduled for 9 AM, Thursday, April 23, 2026, to be held at the Public Works Department, address above.
Work shall include traffic control, sewer bypass system, pavement saw-cutting and removal, trench excavation, gravity sewer pipe and manhole upsizing and replacement, side sewer locating, side sewer reconnection, force main reconnection, surface restoration including trench patch, testing and all other incidental work for a complete upsizing of the 67 th Ave Sewer Interceptor.
This project is subject to Apprentice Utilization requirements. Please see contract general provisions.
All bidding and construction is to be performed in compliance with the Contract Documents for this project and any Addenda issued thereto, which are on file with the City of Arlington Public Works Department.
Proposals received after the date and time stated above will not be considered. Immediately following the deadline for submission, the proposals will be publicly opened and read aloud in the Stillaguamish Conference Room at the Public Works Administration Building located at 154 W. Cox Ave, Arlington, WA 98223. Proposals must be submitted on the forms provided with the contract documents. All proposals must be accompanied by a bid deposit in the form of a certified or cashier’s check, or bid bond, for not less than five percent (5%) of the total amount bid, including additives and alternates, if any. Refer to Instructions to Bidders for more information. Should the successful Bidder fail to enter into such contract and furnish satisfactory payment and performance bonds within the time stated in the specifications, the bid deposit shall be forfeited to the City of Arlington.
The City of Arlington expressly reserves the right to reject any and all bids, to waive minor irregularities or informalities, and to further make award of the project to the lowest responsible Bidder as it best serves the interest of the City of Arlington. No proposal may be withdrawn after the time stated above, or before Award of Contract, unless said award is delayed for a period exceeding sixty (60) calendar days after opening of the proposals, or Bidder withdraws proposal due to error in accordance with Section 1-03.1 of the WSDOT Standard Specifications.
Publication Date/Time: 4/17/2026 8:00 AM Publication Information: Everett Herald & DJC & OMWBE: 1st Pub 4/17/26; 2nd Pub 4/24/26 Closing Date/Time: 5/5/2026 2:00 PM Submittal Information: 154 W Cox Ave, Arlington WA 98223 Bid Opening Information: Public Bid Opening Pre-bid Meeting: April 23, 2026 @ 9:00 AM Contact Person: Linda Taylor
ltaylor@arlingtonwa.gov
360-403-3526Plan & Spec Available: Plans and specifications are available for viewing at the City of Arlington Public Works Department, 154 W. Cox Ave, Arlington, Washington 98223. Free-of-charge access to project bid documents (plans, specifications, addenda, and Bidders List) is provided to Prime Bidders, Subcontractors, and Vendors by going to www.bxwa.com and clicking on "Posted Projects", "Public Works", and "City of Arlington". This online plan room provides Bidders with fully usable online documents with the ability to: download, view, print, order full/partial plan sets from numerous reprographic sources, and a free online digitizer/take-off tool. It is recommended that Bidders “Register” in order to receive automatic e-mail notification of future addenda and to place themselves on the “Self-Registered Bidders List". Bidders that do not register will not be automatically notified of addenda and will need to periodically check the on-line plan room for addenda issued on this project. Contact Builders Exchange of Washington at (425) 258-1303 should you require assistance with access or registration. The content available through bxwa.com is our property or the property of our licensors and is protected by copyright and other intellectual property laws. Access to project documents is intended for use by bidders (general contractors/prime bidders, subcontractors and suppliers), agency personnel and agency’s consultants, as well as for personal, noncommercial, use by the public. You may display or print the content available for these uses only. "Harvesting" (downloading, copying, and transmitting ) of any project information and/or project documents for purposes of reselling and/or redistributing information by any other party is not allowed by BXWA.
Business Hours: 7:30 AM to 4:00 PM Miscellaneous: The City of Arlington, in accordance with Title VI of the Civil Rights Act of 1964, (78 Stat. 252, 42 U.S.C. 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. Related Documents: - Attachment Preview
-
LEGENDEXISTING LEGENDPROPOSED LEGENDSEWER PIPESEWER MANHOLEABANDONED SEWERCDF FILLSEE BELOW FOR SUBSURFACEUTILITY LEGENDGENERAL NOTES1. ALL WORKMANSHIP, CONSTRUCTION AND MATERIALS SHALL BE PERFORMED OR SUPPLIED IN ACCORDANCE WITH THESE SPECIALPROVISIONS, PLANS, CITY OF ARLINGTON (CITY) STANDARD DETAILS, AND THE WSDOT STANDARD SPECIFICATIONS FOR ROAD,BRIDGE, AND MUNICIPAL CONSTRUCTION, 2023 EDITION, AS ISSUED BY THE WASHINGTON STATE DEPARTMENT OFTRANSPORTATION AND THE AMERICAN PUBLIC WORKS ASSOCIATION, WHICH IS HEREINAFTER REFERRED TO AS THE STANDARDSPECIFICATIONS.2. THE CONTRACTOR SHALL CONTACT THE CITY'S PUBLIC WORKS DEPARTMENT (360.403.3500) TO SCHEDULE A PRE-CONSTRUCTIONCONFERENCE AFTER PLANS ARE APPROVED AND BEFORE STAKING AND CONSTRUCTION START. THE CONFERENCE SHALLINCLUDE THE CONTRACTOR, REPRESENTATIVES FROM THE PERMIT AGENCIES, OTHER UTILITY COMPANIES, AND CITY STAFF.ARRANGE A MEETING A MINIMUM OF 48 HOURS PRIOR TO COMMENCING CONSTRUCTION.3. STAKING SHALL BE PERFORMED BY OR UNDER THE DIRECT SUPERVISION OF THE CONTRACTOR’S LAND SURVEYOR LICENSED INTHE STATE OF WASHINGTON. PROVIDE THE CITY WITH TWO (2) BUSINESS DAYS NOTICE TO INSPECT CONSTRUCTION STAKINGBEFORE CONSTRUCTION BEGINS.4. THE EXISTING TOPOGRAPHIC AND PHYSICAL FEATURES SHOWN ON THESE PLANS ARE BASED ON A FIELD SURVEY BY METRONAND ASSOCIATES, (SEE SURVEY NOTES), RECORD DRAWINGS, AND FIELD RECONNAISSANCE BY RH2.5. THE LOCATIONS AND ELEVATIONS OF EXISTING UNDERGROUND UTILITIES SHOWN ON THE PLANS ARE APPROXIMATE. THECONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES PRIOR TO COMMENCING WORK TO AVOIDDAMAGE OR DISTURBANCE, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE CAUSED BYTHE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ALL UNDERGROUND UTILITIES. IT IS UNDERSTOOD THATOTHER ABOVE GROUND AND UNDERGROUND FACILITIES NOT SHOWN ON THE PLANS MAY BE ENCOUNTERED DURING THE COURSEOF THE WORK.6. THE CONTRACTOR SHALL PROTECT IN PLACE BUILDINGS, FENCES, APPURTENANCES, ABOVE GROUND UTILITIES, AND OTHERPROPERTY ADJACENT TO ALL CONSTRUCTION AREAS. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR REPAIRING ALLDAMAGE CAUSED BY CONSTRUCTION ACTIVITIES.7. IN ACCORDANCE WITH THE DEPARTMENT OF ECOLOGY AIR QUALITY STANDARDS, THE CONTRACTOR SHALL BE RESPONSIBLE FORCONTROLLING ALL FUGITIVE DUST THAT MAY BE GENERATED BY THE CONSTRUCTION PROJECT.8. THE CONTRACTOR SHALL CONTAIN WORK TO WITHIN RIGHT-OF-WAY AND THE CONSTRUCTION LIMITS AS ILLUSTRATED IN THEPLANS.9. SEE TECHNICAL SPECIFICATIONS FOR FURTHER INFORMATION REGARDING PERMITS.10. ONSITE TEMPORARY EROSION AND SEDIMENT CONTROL (TESC) MEASURES SHALL BE THE RESPONSIBILITY OF THE CONTRACTORAND BE IN PLACE PRIOR TO CONSTRUCTION. ANY PROBLEMS OCCURRING BEFORE FINAL ACCEPTANCE BY THE CITY SHALL BECORRECTED BY THE CONTRACTOR. UPON FINAL ACCEPTANCE BY THE CITY, OR AS OTHERWISE DIRECTED BY THE ENGINEER, THECONTRACTOR SHALL REMOVE ALL TEMPORARY, NON-DEGRADABLE TESC MEASURES. THE STORM DRAIN INLET PROTECTIONDEVICE SHALL BE SILT SACK OR EQUAL. ALL CATCH BASINS WITHIN THE VICINITY OF THE CONSTRUCTION SHALL HAVE INLETPROTECTION MEASURES.11. ANY REVISIONS TO PLANS MUST BE MADE BY THE ENGINEER AND APPROVED BY THE CITY PRIOR TO ANY IMPLEMENTATION IN THEFIELD.12. ALL PAVEMENT MARKINGS, SIGNING AND TRAFFIC CONTROL AS REQUIRED BY THE CONSTRUCTION SHALL CONFORM TO THEREQUIREMENTS OF THE MUTCD.13. A COPY OF THE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS.14. WHERE NEWLY CONSTRUCTED PAVING MEETS EXISTING PAVING, THE CONTRACTOR SHALL SAW CUT TO PROVIDE A SMOOTHTRANSITION FROM EXISTING TO PROPOSED PAVING. APPLICATION OF A THIN TACK COAT OF EMULSIFIED ASPHALT SHALL BEAPPLIED TO INSURE PROPER BONDING.15. THE COMPLETED SURFACE OF ALL COURSES SHALL BE OF UNIFORM TEXTURE, SMOOTH, UNIFORM AS TO CROWN AND GRADE,AND FREE FROM DEFECTS OF ALL KINDS. THE COMPLETED SURFACE OF THE WEARING COURSE SHALL NOT VARY MORE THAN 1/8INCH FROM THE LOWER EDGE OF A 10-FOOT STRAIGHTEDGE PLACED ON THE SURFACE PARALLEL TO THE CENTERLINE. THETRANSVERSE SLOPE OF THE COMPLETED SURFACE OF THE WEARING COURSE SHALL VARY NOT MORE THAN 1/4 INCH IN 10- FEETFROM THE RATE OF TRANSVERSE SLOPE SHOWN ON THE PLANS.16. MATERIALS SAMPLING AND TESTING SHALL BE AT A FREQUENCY AND MAGNITUDE AS SPECIFIED IN THE TECHNICALSPECIFICATIONS OR DETERMINED BY THE ENGINEER. A PRIVATE AND INDEPENDENT TESTING LABORATORY SHALL PERFORMTESTING AND SAMPLING. CERTIFIED TEST REPORTS SHALL BE FURNISHED FOR ALL TESTS PERFORMED BY PRIVATE TESTINGLABORATORIES. THE CITY WILL BE RESPONSIBLE FOR ACCEPTANCE TESTING. IF TESTS FAIL, RETESTS SHALL BE PAID FOR BY THECONTRACTOR.SUBSURFACE UTILITY LEGENDTHE CLASSIFICATIONS FOR SUBSURFACE UTILITIES ARE OUTLINED AND EXPLAINED IN THE FOLLOWING LIST:UTILITY QUALITY LEVEL A.POTHOLE LOCATION- PRECISE HORIZONTAL AND VERTICAL LOCATION OF UTILITIES OBTAINED BY THE ACTUAL EXPOSURE OF (ORVERIFICATION OF PREVIOUSLY EXPOSED AND SURVEYED UTILITIES) AND SUBSEQUENT MEASUREMENT OFSUBSURFACE UTILITIES, USUALLY AT A SPECIFIC POINT. UNLESS OTHERWISE NOTED, QUALITY LEVEL A ISONLY APPLICABLE AT POTHOLED LOCATIONS ON THE PLANS. AT ALL OTHER AREAS, THE UTILITY SHOULD BEASSUMED TO BE QUALITY LEVEL B.UTILITY QUALITY LEVEL B. - INFORMATION OBTAINED THROUGH THE APPLICATION OF APPROPRIATE SURFACE GEOPHYSICAL METHODSTO DETERMINE THE EXISTENCE AND APPROXIMATE HORIZONTAL POSITION OF SUBSURFACE UTILITIES.UTILITY QUALITY LEVEL C. - INFORMATION OBTAINED BY SURVEYING AND PLOTTING VISIBLE ABOVE-GROUND UTILITY FEATURESUTILITY QUALITY LEVEL D. - INFORMATION DERIVED FROM EXISTING RECORDS OR ORAL RECOLLECTIONSNOTE: THE USE OF THE LINE TYPES PROVIDED ABOVE WAS A PRIMARY METHOD FOR INDICATING THE ACCURACY OF THE UTILITIES SHOWN WITHINTHESE PLANS. WHEN THE SOURCE OF THE INFORMATION WAS UNKNOWN OR THE METHOD FOR LOCATING THE UTILITIES WASUNAVAILABLE, QUALITY LEVEL D WAS USED AS THE DEFAULT.SURVEY NOTESDATA FOR THIS SURVEY HAS BEEN GATHERED THROUGH FIELD OBSERVATIONS BY METRON ANDASSOCIATES AND THE CITY OF ARLINGTON.HORIZONTAL DATUM:WASHINGTON NORTH ZONE SPC NORTH AMERICAN DATUM 1983/2011 GEODETIC PROJECTIONVERTICAL DATUM:NAVD 88 (MEAN SEA LEVEL)UNDERGROUND UTILITY NOTE:UNDERGROUND UTILITY LOCATIONS FOR SEWER, WATER, ELECTRIC SERVICE, COMMUNICATIONSERVICES AND GAS, AS SHOWN HEREON, ARE BASED UPON THE CITY OF ARLINGTON UTILITYLOCATES AND “CALL BEFORE YOU DIG” UTILITY LOCATE SERVICE ALL PROVIDED BY CITY OFARLINGTON. THE USE OF THIS MAP FOR THE PRECISE LOCATION OF THE UTILITY LINES IS NOTWARRANTED OR GUARANTEED.RCW 19.122 REQUIRES 48 HOUR NOTIFICATION PRIOR TO UNDERGROUND CONSTRUCTIONACTIVITY. CONTACT “CALL BEFORE YOU DIG” UTILITY LOCATE SERVICE AT 811 OR 1-800-424-5555.SEWER GENERAL NOTES1. SEE SPECIFICATION APPENDICES FOR CITY SEWER GENERAL NOTES (CH. 5). SEE DWG NO. D01 FOR CITY STANDARD DETAILS.2. WHEN EXCAVATION OF ROCK IS ENCOUNTERED, ALL ROCK SHALL BE REMOVED TO PROVIDE A CLEARANCE BELOW, ON EACH SIDE OF ALL PIPE,AND FITTINGS OF AT LEAST 6 INCHES FOR PIPE SIZES 24 INCHES OR SMALLER. MATERIAL REMOVED SHALL BE REPLACED WITH APPROPRIATEBACKFILL MATERIAL, WHICH SHALL BE COMPACTED TO 95% OF MAXIMUM DRY DENSITY AS DETERMINED BY MODIFIED (ASTM D1557) PROCTORTEST.3. EXISTING SEWER MAINS TO BE ABANDONED SHALL BE FILLED WITH CDF WITHIN 10 FEET OF THE SEWER MAIN AND MANHOLE INTERFACE. SEALEND OF ABANDONED SEWER MAIN WITH PVC CAP.4. EXISTING SEWER MANHOLE LID AND RISERS TO BE ABANDONED SHALL BE BROKEN DOWN TO A DEPTH OF AT LEAST 2 FEET BELOW FINISHEDGRADE AND REMOVED. PUNCH TWO, 2" DIAMETER HOLES COMPLETELY THROUGH THE CONCRETE FLOOR FOR DRAINAGE. FILL THE REMAININGINTERIOR STRUCTURE WITH GRAVEL BORROW (9-03.14(1)) AND COMPACT TO 95% MAX. DRY DENSITY PER ASTM D-1557, MODIFIED PROCTOR.RESTORE SURFACE AND SUBSURFACE TO EXISTING OR BETTER CONDITION TO MATCH THE ADJACENT FEATURES. SEE GENERAL DETAILS FORVARIOUS SURFACE/SUBSURFACE RESTORATION REQUIREMENTS.CITY SEWER CONSTRUCTION NOTES1. ALL WORK SHALL BE IN ACCORDANCE WITH THE APPROVED PLANS, AND CURRENT EDITION OF THE CITY OF ARLINGTON STANDARDS ANDSPECIFICATIONS. ANY CHANGES TO THE DESIGN REQUIRES CITY APPROVAL.2. ALL MATERIALS SHALL CONFORM TO THE CITY OF ARLINGTON STANDARDS AND SPECIFICATIONS AND THE MATERIAL SUBMITTALS SHALL BEAPPROVED BY THE CITY BEFORE SCHEDULING THE PRECONSTRUCTION CONFERENCE AND BEFORE THE MATERIALS ARE DELIVERED TO THE JOBSITE. ONCE THE MATERIALS ARE DELIVERED TO THE JOB SITE THE INSPECTOR WILL DETERMINE IF THE MATERIALS WERE MANUFACTURED TOMEET THE REQUIREMENTS OF THE CITY OF ARLINGTON STANDARDS AND SPECIFICATIONS BEFORE THE MATERIALS CAN BE INSTALLED.3. ALL SEWER MAINS AND SIDE SEWER STUBS SHALL BE FIELD STAKED FOR GRADES AND ALIGNMENT BY A SURVEYOR PRIOR TO CONSTRUCTION.THE CONSTRUCTION STAKES MUST SHOW THE STATION AND OFFSET TO THE ALIGNMENT.4. THE CITY OF ARLINGTON WASTEWATER DIVISION SHALL BE NOTIFIED A MINIMUM OF 48 HOURS IN ADVANCE OF A TAP OR CONNECTION TO ANEXISTING SANITARY SEWER MAIN. THE INSPECTOR SHALL BE PRESENT AT THE TIME OF THE TAP OR CONNECTION.5. GRAVITY SEWERS LARGER THAN 15 INCHES IN DIAMETER SHALL BE PVC ASTM F679 (PS46). GRAVITY SEWERS 15 INCHES IN DIAMETER OR LESSSHALL BE PVC ASTM D3034 (SDR 35).6. PRE-CAST MANHOLES SHALL MEET THE REQUIREMENTS OF ASTM C-478. JOINTS SHALL BE RUBBER GASKETED AND GROUTED BOTH INSIDE ANDOUTSIDE OF THE MANHOLE PER CITY OF ARLINGTON STANDARDS AND SPECIFICATIONS. ALL LIFT HOLES CUT THROUGH THE WALLS OF THEMANHOLE SHALL BE GROUTED FROM THE INSIDE AND OUTSIDE OF THE MANHOLE TO BE WATERTIGHT. ADDITIONAL WATERPROOFING MAY BEREQUIRED.7. SIDE SEWER SERVICES SHALL BE PVC ASTM D3034 (SDR 35) WITH FLEXIBLE GASKETED JOINTS. SIDE SEWER CONNECTIONS SHALL BE MADE BY ATAP TO AN EXISTING MAIN OR A TEE FROM A NEW MAIN CONNECTED ABOVE THE SPRING LINE OF THE PIPE. WYES ARE NOT ALLOWED ON LINES 8”OR LARGER. SIDE SEWERS CAN NOT BE INSTALLED UNDER DRIVEWAYS UNLESS APPROVED BY THE CITY INSPECTOR.8. ALL SEWER PIPE SHALL BE INSTALLED WITH A CONTINUOUS TRACER TAPE 18” ABOVE THE PROPOSED SEWER PIPE, OR AS DIRECTED BY THECITY INSPECTOR. THE MARKER SHALL BE PLASTIC, NON-BIODEGRADABLE, METAL CORE, AND DETECTABLE, WITH BACKING MARKED “SEWER”.9. SIDE SEWERS SHALL BE INSTALLED BY THE CONTRACTOR AND COORDINATED FOR CLEARANCE WITH POWER, GAS, TELEPHONE, CABLE, ANDOTHER UTILITIES. SIDE SEWERS SHALL BE A MINIMUM OF 10 FEET BEYOND PROPERTY LINES AND 5’ BEYOND ANY EASEMENT.10. THE SEWER PIPE SHALL BE INSTALLED STARTING FROM DOWNSTREAM OF THE POINT OF CONNECTION ON THE EXISTING SEWER OR FROM ADESIGNATED STARTING POINT. THE SEWER PIPE SHALL BE INSTALLED WITH THE BELL END UPSTREAM.11. ADEQUATE TRENCH SHEETING AND/OR SHORING SHALL BE PROVIDED BY THE CONTRACTOR AS REQUIRED BY OSHA AND WISHA.AR12. TO PREVENT WATER OR DEBRIS FROM DISCHARGING INTO THE CITY’S EXISTING SEWER SYSTEM, THE CONTRACTOR SHALL INSTALL A PLUG INTHE CONNECTION MANHOLE OR AS DIRECTED BY THE CITY INSPECTOR. THE PLUG SHALL NOT BE REMOVED UNTIL THE SEWER IS ACCEPTED BYTHE CITY.13. ALL SEWER LINES SHALL MAINTAIN A MINIMUM OF 10 FEET HORIZONTAL CLEARANCE AND A MINIMUM OF 18 INCHES VERTICAL CLEARANCE FROMWATER LINES. SEE STANDARDS AND SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS AND ALTERNATIVES.14. PIPE BEDDING SHALL BE IN ACCORDANCE WITH THE CITY OF ARLINGTON STANDARD AND WSDOT STANDARD SPECIFICATIONS. 3/8-INCH MINUSMANUFACTURED CLEAN PEA GRAVEL IS THE REQUIRED BEDDING MATERIAL. ALL PIPE SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION.THIS SHALL INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION MATERIALS AS WELL AS PLACEMENTAND COMPACTION OF REQUIRED BEDDING MATERIAL TO UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE WILL BE SUPPORTED BY AUNIFORMLY DENSE UNYIELDING BASE.15. THE CONTRACTOR SHALL COMPACT TRENCH BACKFILL WITHIN THE CITY RIGHT-OF-WAY TO AT LEAST 90% MAXIMUM DRY DENSITY FROM THEBOTTOM OF THE TRENCH TO A DEPTH OF 3’ BELOW THE SURFACE. THE TRENCH BACKFILL MUST BE COMPACTED TO AT LEAST 95% MAXIMUMDENSITY WITHIN 3’ OF THE SURFACE. MAXIMUM DENSITY AS DETERMINED BY MODIFIED PROCTOR TEST (ATSM-1557). ASPHALT MUST BECOMPACTED TO MEET THE REQUIREMENTS OF THE CITY OF ARLINGTON. THE INITIAL COMPACTION TEST SHALL BE FUNDED BY THE CITY;FURTHER COMPACTION TESTS SHALL BE PAID FOR BY THE CONTRACTOR.SECTION AND DETAIL REFERENCESTHE FOLLOWING CONVENTIONS HAVE BEEN USED WITHIN THESE DRAWINGS TO REFER THE READER BETWEEN THE SECTION/DETAIL AND THE PLANFROM WHICH IT IS REFERENCED.REFERENCE BUBBLESXPLAN REFERENCE BUBBLE - REFERS READER BACK TO THE PLAN FROM WHICH THE DETAIL OR SECTION ORIGINATED.DETAIL/SECTION REFERENCE BUBBLE - REFERS READER TO THE DRAWING ON WHICH THE DETAIL OR SECTION IS LOCATED.XWHERE, ID = SECTION/DETAIL REFERENCE NUMBER## = DRAWING NUMBER ON WHICH DETAIL ORIGINATED OR RESIDES.SCALE: SHOWN0"1"2"DRAWING IS FULL SCALE WHENBAR MEASURES 2"DWG NO.:SHEET NO.:G01 1 12GAYTEWAYPROPERTIESSS01SS02BNSF RAILROAD ROWSS03SS04SS0567TH AVE NESS06SS07CUZPRECASTPLANT67TH AVE NE & BNSFRAILROAD CROSSINGARPROJECT ALIGNMENT MAPSITE CONSTRUCTION NOTES1. CONTRACTOR SHALL PROVIDE BYPASS PUMPS AND PIPING. CITY TO REVIEW AND APPROVE BYPASS PUMPING PLAN ANDDEWATERING PLAN PRIOR TO CONSTRUCTION. SEE SPECIFICATIONS FOR DETAILS.2. CONTRACTOR SHALL PROVIDE TRAFFIC CONTROL PLAN FOR REVIEW AND APPROVAL BY THE CITY PRIOR TO CONSTRUCTION.TRAFFIC CONTROL PLAN SHALL INCLUDE PEDESTRIAN AND BICYCLE TRAFFIC CONTROL FOR CENTENNIAL TRAIL ANDSIDEWALKS IF NECESSARY. CENTENNIAL TRAIL SHALL HAVE MIN. 10' PATH IN STREET AND TEMPORARY RAMPS SUITABLE FORALL BICYCLE AND WHEEL CHAIR TYPES WHEN SEWER IS BUILT BELOW IT. MAINTAIN 2-WAY TRAFFIC AFTER EACH WORK DAY.1-WAY TRAFFIC ALLOWED FROM 8:30 AM TO 3:30 PM.3. CONTRACTOR SHALL POTHOLE CROSSING UTILITIES TO CONFIRM LOCATION AND DEPTH ONE CALENDAR WEEK PRIOR TOEXCAVATION AT THE CROSSING UTILITY LOCATION. REPORT ELEVATIONS AND CONFLICTS TO THE CITY AFTER POTHOLE ISCOMPLETE.4. CONTRACTOR SHALL PROTECT EXISTING UTILITIES TO REMAIN. ANY SERVICE INTERRUPTIONS FOR CROSSING UTILITIES MUSTBE APPROVED BY THE ENGINEER PRIOR TO STARTING WORK AND COORDINATED WITH THE APPROPRIATE SERVICE PROVIDER.5. CONTRACTOR SHALL DETERMINE EXISTING ELEVATIONS OF BOTH ENDS OF EACH PROPOSED PIPE SEGMENT AND CALCULATETHE SLOPE OF THE PROPOSED PIPE SEGMENT WHEN REPLACING IN PLACE. CONTRACTOR SHALL INSTALL PROPOSED PIPESEGMENTS SO INVERT AT BOTH ENDS MATCHES EXISTING SEWER MAIN INVERT TO MAINTAIN A CONTINUOUS SLOPE IFPLACED IN THE SAME ALIGNMENT AS EXISTING.6. ALL CONNECTIONS TO MANHOLES SHALL USE KOR-N-SEAL BOOTS UNLESS INSTRUCTED OTHERWISE BY THE CITY.SCALE: SHOWN0"1"2"DRAWING IS FULL SCALE WHENBAR MEASURES 2"DWG NO.:SHEET NO.:G02 2 1224" PVC PIPE,LENGTH AS REQ'DTPN 3105140020380020101 67TH AVE NE(GAYTEWAY NORTH)SSMH #2001N: 432615.83E: 1321531.52-0+100+001+002+00TPN 3105140020370019927 67TH AVE NE(GAYTEWAY SOUTH)3+00KEY NOTESCONNECT TO EXISTING PIPE WITH RIGID TRANSITIONCOUPLINGS (ROMAC 501 OR EQUAL). CONTRACTOR TOVERIFY AND MATCH PIPE SIZE AND MATERIAL.REPLACE SIDEWALK, CURB, AND GUTTER TO NEARESTEXPANSION OR CONTRACTION JOINTS PER CITY OF ARLINGTONDETAILS ON DWG NO. D02. SAWCUT AT EXPANSION JOINTS.EXISTING SEWER TO REMAIN IN SERVICE, PROTECT IN PLACE.REPLACE CONCRETE DRIVEWAY TO NEAREST EXPANSION ORCONTRACTION JOINTS PER CITY OF ARLINGTON DETAIL ON DWGNO. D02. SAWCUT AT CONTRACTION JOINTS.4+0067TH AVE NESSMH #2002N: 432603.60E: 1321515.5712" PVC PIPE,LENGTH AS REQ'DTPN 3105150010010020104 67TH AVE NESSMH #2003N: 432507.83E: 1321512.47TPN 31051500101700UNKNOWNTPN 3105150010020020020 67TH AVE NEPLAN VIEWTPN 31U0N51K5N00O1W03N400TPN 3105150010310020006 67TH AVE NE140'SSMH #2001PROVIDE: (1) - 54" TYPE I MHRE = 125.88'IE (SW) = 116.08'IE (N) = 116.00'SSMH #2002PROVIDE: (1) - 54" TYPE I MHRE = 126.01'IE (S) = 117.25'IE (NE) = 117.15'IE (SW) = 117.46'130'SSMH #2003PROVIDE: (1) - 54" TYPE I MHRE = 128.11'IE (S) = 117.65'IE (N) = 117.55'EXISTING AND FINAL GRADEOVER TOP OF PIPE, TYP.140'AR130'120'APPROX. 91'OF 24" PVC PIPE @ 0.33%APPROX. 16'OF 24" PVC PIPE @ 6.78%PROVIDE 18" MIN.110'CLEARANCE ANDETHAFOAM PADBETWEEN PIPESAPPROX. 491'OF 24" PVC PIPE @ 0.97%105'-0+10 0+001+002+003+00APPROXIMATE STATION LINE. SEEPLAN FOR EXACT LOCATION, TYP.SEWER SCEWNTEERR_ALILNIGENPMROENFITL_E67THKEY PLAN120'110'SS01SS0267TH AVE NESS03SS04SS05SS0667TH AVE NESS0767TH AVE NE & BNSFRAILROAD CROSSING105'4+00SCALE: SHOWN0"1"2"DRAWING IS FULL SCALE WHENBAR MEASURES 2"DWG NO.:SHEET NO.:SS01 3 12TPN 310514002037001992019927 67TH AVE NESSMH #2004N: 432012.94E: 1321495.84STA. 7+48.7A, 10.9' RTPN 31051400204000UNKNOWNKEY NOTESEXISTING SEWER TO REMAIN IN SERVICE, PROTECT IN PLACE.4+005+007+008+006+0067TH AVE NETPN 3105150010130019920 67TH AVE NEPLAN VIEW140'SSMH #2004PROVIDE: (1) - 54" TYPE I MHRE = 133.19'IE (S) = 122.51'IE (N) = 122.41'EXISTING AND FINAL GRADEOVER TOP OF PIPE, TYP.130'120'APPROX. 491'OF 24" PVC PIPE @ 0.97%APPROX. 477'OF 24" PVC PIPE @ 0.98%110'4+005+006+007+00APPROXIMATE STATION LINE. SEEPLAN FOR EXACT LOCATION, TYP.SSEEWWEERR_CAELINGTNEMRELINNTE_6P7RTOHFILE140'PROVIDE 18" MIN.CLEARANCE AND130'ETHAFOAM PADBETWEEN PIPES120'110'8+00ARKEY PLANSS01SS0267TH AVE NESS03SS04SS05SS0667TH AVE NESS0767TH AVE NE & BNSFRAILROAD CROSSINGSCALE: SHOWN0"1"2"DRAWING IS FULL SCALE WHENBAR MEASURES 2"DWG NO.:SHEET NO.:SS02 4 12
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Solicitation Close Date: 07/06/26 Title: Hate Crime Hotline Ref #:26-01 Contact: Meagan Metzger
State Government of Washington
Bid Due: 7/06/2026
Amendment #4 to RFA: DE-FOA-0...
Follow Amendment #4 to RFA: DE-FOA-0000001 Active Contract Opportunity Notice ID Related Notice
ENERGY, DEPARTMENT OF