Construction Management & Inspection Services for Phase 3: Superstructure (Multipurpose Laboratory Building) Addendum 2
Project Information
- Bid Title
- Construction Management & Inspection Services for Phase 3: Superstructure (Multipurpose Laboratory Building) Addendum 2
- Issuing Agency
- Las Gallinas Valley Sanitary District
- Location
- California
- Published Date
- Jan 15, 2026
- Closing Date
- Jan 23, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
RFP - CM & Inspection Services for Phase 3: Superstructure (Multipurpose Lab Building) Addendum 1 (11/20/2025) Addendum 2 (1/15/2026)
Project Name Job Number Proposal Deadline Construction Management & Inspection Services for Phase 3: Superstructure (Multipurpose Laboratory Building) 24600-01 1/23/2026, 2:00 PM - Attachment Preview
-
October 9, 2025To: Interested PartiesRe: Request for Proposals (RFP) forConstruction Management and Inspection ServicesPHASE 3: SUPERSTRUCTURE (Multipurpose Laboratory Building)Job No. 24600-01Dear Prospective Consultants:Las Gallinas Valley Sanitary District is soliciting proposals from qualified consultants to provideConstruction Management and Inspection Services for the PHASE 3: SUPERSTRUCTURE(Multipurpose Laboratory Building) project. The project and scope of work are described in theenclosed RFP.If you would like your firm to be considered, an electronic copy of your proposal in PDF formatmust be emailed to the attention of Michael P. Cortez at mcortez@lgvsd.org cc: Patty Quinn atpquinn@lgvsd.org with the project name as subject heading, no later than 2:00 PM onNovember 24, 2025. Proposer shall call the District Engineering Department at 415-472-1734after submitting the proposal to confirm receipt before the deadline.An interview process for the selection of a consultant, if deemed necessary by the District, istentatively scheduled for the week of December 1, 2025. The award of a contract for this RFP isscheduled for December 18, 2025.Please contact me or Patty Quinn via email if you have any questions related to the contentsand requirements of the RFP. Questions received after the inquiry deadline of October 27, 2025may not be addressed.Please call me at (415) 472-1734, extension 18, if you have any questions.Sincerely,Michael Cortez, PEDistrict Engineer101 Lucas Valley Road Suite 300 • San Rafael, CA 94903 • 415.472-1734 • Fax 415.499-7715 • WWW.LGVSD.ORGRFP - CM & Inspection ServicesPhase 3: Superstructure (Multipurpose Lab Building)Page 1 of 57REQUEST FOR PROPOSALSFOR CONSTRUCTION MANAGEMENT AND INSPECTION SERVICESPHASE 3: SUPERSTRUCTURE (Multipurpose Laboratory Building)JOB NO. 24000-011.0 BACKGROUNDPHASE 3: SUPERSTRUCTURE (Multipurpose Laboratory Building) project (Project) is thefinal phase of a three-phase project consisting of a two-story building elevated on araised level 1 structural deck. PHASE 1: PLANT UTILITIES RELOCATION and PHASE 2:FOUNDATION INSTALLATION were issued under separate contracts to finishconstruction before the commencement of Phase 3. The scope of Phase 3 includes theconstruction of the superstructure on the foundation installed in Phase 2. Also includedare site improvements and phased demolition of the existing laboratory, which is toremain operational until the new laboratory space is complete and occupiable. Theproject is expected to achieve LEED Gold certification, and the General Contractor isresponsible for tracking and submitting the required documents to the U.S. GreenBuilding Council (USGBC).The design consultant for the Project is Noll and Tam Architects. The Engineer’s estimateof construction costs is $18,400,000 and the construction duration is 365 calendar days.See Attachments 2a, 2b, and 2c for the bidding documents.2.0 TENTATIVE CONSTRUCTION SCHEDULEBid Opening of Construction Bids:Award of Construction Contract:Preconstruction Meeting with Contractor:Notice to Proceed to Contractor:Construction Period:November 20, 2025December 18, 2025Late December 2025January 2025365 Calendar Days3.0 SCOPE OF WORKThe scope of work shall be sufficient to address the following tasks:Task 1: Construction Management1. Act as the District's primary contact with Contractor, City of San Rafael, and otheragencies having jurisdiction, such as BCDC, County of Marin, etc.2. Provide oversight for the construction management of all testing, construction,inspection, acceptance, and other requirements of the Project.3. Conduct and document the preconstruction conference.4. Conduct and document weekly construction job site meetings with the Contractor’ssupervisor and other required meetings as necessary.RFP - CM & Inspection ServicesPhase 3: Superstructure (Multipurpose Lab Building)Page 2 of 575. At least three (3) years of recent experience using construction management softwaresystems.6. Review, coordinate, and track submittals, shop drawings, requests for information(RFIs), and change orders between Contractor and District staff.7. Prepare responses to RFIs and miscellaneous correspondence related to the Project.8. Prepare and submit to the District a weekly progress report.9. Review payment requests from the Contractor and recommend payment by the District.10. Review Project schedules submitted by Contractor and track construction progress.11. Meet with District staff to advise on overall Project progress and to notify them of anypotential delays, scheduling conflicts, or other conflicts with the Project.12. Determine changed conditions, define scope, prepare an independent cost estimate,negotiate with the Contractor, and prepare and process change orders for incorporationinto the contract.13. Coordinate and manage the drawings and specifications, clarification and interpretation,shop drawings, and submittal review processes.14. Ensure that the Contractor maintains field mark-up drawings for use in preparation ofas-builts and verify records for accuracy before final close-out.15. Collect, compile, review, and ensure that as-built information is accurately shown in theoriginal set of plans.16. Review as-builts from Contractor and submit to the District a final set of as-builts.17. Coordinate the activities of the materials testing sub-consultant(s).18. Identify plan/construction issues and bring them directly to the attention of the Districtbefore discussing them with the Contractor.19. Work to resolve conflicts that may arise during construction of the Project.20. Coordinate with the District’s Labor Compliance consultant (CCMI) for Contractorcertified payrolls and other requirements.21. Provide Inspector and field personnel certified payrolls and comply with laborcompliance requirements.22. Provide claims management services and coordinate the resolution and processing of allclaims related to the construction of the Project.23. Additional tasks that the Consultant feels should be added to the Scope of Work tobetter meet the objective.24. Materials Testing:a. Provide management and coordination of special laboratory testing on selectsuitable samples to assure compliance with the quality and functionalrequirements of the specifications.b. Quality Assurance: Manage quality assurance material testing, review technicalsubmittals for conformance with the contract documents, read and interprettechnical specifications, and recommend to the District issuance of deficiencynotices for non-conformances.c. Consultant shall include a third-party materials testing firm in the proposal andprovide an allowance of approximately half of one percent (½ %) of theengineer’s construction cost estimate for materials testing. The third-partytesting firm shall be compensated on a time-and-materials basis.RFP - CM & Inspection ServicesPhase 3: Superstructure (Multipurpose Lab Building)Page 3 of 57Task 2: Inspection Services1. Provide ongoing construction inspection for all aspects of the Project throughout allstages of construction to ensure that construction complies with the plans andspecifications. Tentative working hours are between 7:30 AM and 4:00 PM. The Districtoffice is open on weekdays from 6:00 AM to 3:30 PM, closed on alternate Fridays. TheInspector shall plan his schedule between the working hours at the jobsite and Districtbusiness hours as necessary.2. The Project may require some work to be done at night between 7:00 PM and 5:00 AM.The Inspector shall be at the job site during construction.3. Acts as liaison in the field between Contractor, District, and representatives from City ofSan Rafael, and all other utility owners throughout all phases of construction.4. Monitor and coordinate overall safety at the jobsite.5. Monitor and coordinate Contractor maintenance of field changes to plans andspecifications during construction.6. Review the Project for safety issues and concerns and bring these to the attention of theContractor and District.7. Perform final inspection for all aspects of construction, including new items that mayarise resulting from the Contractor’s activities.8. Maintain project reports containing inspection reports, pictures during construction,and material testing reports, and submit to the District as requested.9. Schedule and conduct substantial completion inspections, issue punch lists, reviewcompliance, and recommend acceptance by the District.10. Certification in the appropriate category needed to perform construction inspectionaccording to the best industry practice, specifically:a. Civil/Structural/Architectural – nationally and construction industry recognizedtechnical certification.b. Mechanical – nationally and construction industry recognized technicalcertification.c. Electrical/I&C – International Code Council Commercial Electrical Certification.d. Other Certifications as needed for the Project.11. Consultants shall comply with prevailing wage and other California Labor Code Section1771 requirements for inspectors and other employees as may be required by law.4.0 DELIVERABLESConsultant shall process and submit the following promptly during all stages of construction asapplicable:1. Meetings: Upon receipt of a Notice of Award, Consultant shall schedule a pre-construction meeting with the Contractor. Consultant shall schedule weekly or biweeklyprogress meetings with the Contractor and the District, and prepare meeting agendasand minutes, as appropriate.RFP - CM & Inspection ServicesPhase 3: Superstructure (Multipurpose Lab Building)Page 4 of 572. Construction Management Documents: Consultant shall coordinate submittal andprocessing of change order forms, progress billings, pre-lien notices, submittals, andRFIs, etc., during construction and project closeout.3. Construction Inspection Documents: Consultant shall prepare inspection reports,coordinate testing of materials, and other requirements during construction.4. As-built Drawings. Consultant shall coordinate the preparation of final as-built drawingswith Contractor and ensure that all changes to the original plans and specifications havebeen incorporated before the release of final progress payment to the Contractor.Consultant shall submit a copy of the as-built drawings to the District.5. Operation and Maintenance Manuals: Consultant shall coordinate the compilation ofmanufacturer's Operation and Maintenance Manuals for the equipment and materialsinstalled on the Project, if applicable.6. Final Reports: Consultant shall prepare a final report containing copies of allcorrespondence, reports, daily reports, meeting notes, digital videos, digitalphotographs in an organized manner, payment requests, equipment submittals, changeorders, requests for information, punch lists, summary of contract start-up, closeoutand acceptance, lien-release forms, including the final resolution of claims or disputedwork and other documents associated with the Project generated, or received by theConstruction Manager.7. Electronic Media: Consultant shall provide District with a complete set of all records ofthe Project as outlined above in electronic format, such as a USB flash drive.5.0 FIELD OFFICEThe Contract Documents do not require the Contractor to provide for field offices for otherparties who may be working on the Project during construction. The Consultant shall include inthe proposal the cost of providing and maintaining temporary field offices necessary for theproper execution of its responsibilities as outlined in this RFP. District facilities will not beavailable to the Consultant during construction of the Project.6.0 TENTATIVE CM CONSULTANT SELECTION SCHEDULEProposal Deadline:Proposal Questions DeadlineInterviews if necessary:Award of Consultant Agreement:Construction Period/Contract DurationNovember 24, 2025 at 2:00 PMOctober 27, 2025Week of December 1, 2025 (tentative)December 18, 2025 (tentative)365 Calendar DaysRFP - CM & Inspection ServicesPhase 3: Superstructure (Multipurpose Lab Building)Page 5 of 57
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
- NAICS 541330Engineering Services
- NAICS 541350Building Inspection Services
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Purchase of six (6) Hi-Rail S...
Number Title Type NAICS Code(s) Due Date Issue Date Status DR135489 Purchase of
LA Metro
Bid Due: 7/09/2026
RFP 25-26-45 City of Visalia ...
RFP 25-26-45 City of Visalia Corporation Yard Master Plan Deadline extended to: July
City of Visalia
Bid Due: 7/09/2026