Spillway Replacement at Caw Caw Interpretive Center
Project Information
- Bid Title
- Spillway Replacement at Caw Caw Interpretive Center
- Issuing Agency
- Charleston County Park & Recreation commission
- Location
- South Carolina
- Published Date
- Dec 29, 2025
- Closing Date
- Jan 26, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- 2026-013
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Number: 2026-013
Bid Title: Spillway Replacement at Caw Caw Interpretive Center
Category: Construction Status: Open Description: Charleston County Park and Recreation Commission is seeking proposals for Construction Services for Caw Caw Interpretive Center – Spillway Replacement. The intent of this project is to replace wood spillway box WCS#4 and wood spillway box WCS#5 extension of top bulkhead boards to control erosion.
Submit proposal online: https://www.ccprc.com/FormCenter/Procurement-35/Bid-Proposal-Submission-173
Publication Date/Time: 12/29/2025 12:00 AM Closing Date/Time: 1/26/2026 2:00 PM Pre-bid Meeting: 1/14/26, 10 a.m. Contact Person: prcprocurement@ccprc.com Related Documents: - Attachment Preview
-
RFP # 2026-013Date: December 29, 2025SPIILLWAY REPLACEMENT ATCAW CAW INTERPRETIVE CENTER5200 SAVANNAH HIGHWAYRAVENEL, SC 29470CHARLESTON COUNTY PARK &RECREATION COMMISSIONTable of ContentsIntroduction .................................................................................................................................................. 2Scope of Work............................................................................................................................................... 2General Scope of Construction:................................................................................................................ 2Contractor Project Requirements: ........................................................................................................... 2Schedule.................................................................................................................................................... 3Proposal Requirements ................................................................................................................................ 4Selection Criteria .......................................................................................................................................... 5Criteria for Selecting based on Qualifications......................................................................................... 5Basis of Award ......................................................................................................................................... 5Basis of Evaluation Criteria for each Factor ............................................................................................ 6Submittal Requirements .............................................................................................................................. 8How to Submit .......................................................................................................................................... 8Electronic Submittals: .......................................................................................................................... 8Addenda ....................................................................................................................................................10COST PROPOSAL FORM: ..........................................................................................................................11Attachments1a- Proposer Qualification FormAttachment - Require Forms1-Equal Employment Opportunity Certification1-Non-Collusion Oath1-Drug-Free Work-place Certification1 - Compliance with Illegal Immigrant Act1-Insurance Requirement1 - Taxpayer Identification Form W91- Subcontractor FormAttachment 2 – 501 Wooden WCS ControlStructure Attachment 3 - DrawingsSample Contract1CCIC Spillway ReplacementRFP # 2026-013IntroductionCharleston County Park and Recreation Commission (CCPRC) is seeking proposals for Construction Services forCaw Caw Interpretive Center – Spillway Replacement. The intent of this project is to replace wood spillwaybox WCS#4 and wood spillway box WCS#5 extension of top bulkhead boards to control erosion. This historicsite was once part of several rice plantations and the home to enslaved Africans who applied their technologyand skills in agriculture to carve the series of rice fields out of cypress swamps. Caw Caw Interpretive Center(“CCIC”) is managed as a low-impact wildlife preserve and Member of the National Park Service’s NationalUnderground Railroad Network to Freedom Program.Scope of WorkThe Scope of Work (“SOW”) required under this Request for Proposal (“RFP”) includes all labor, materials,taxes, equipment, and services required to complete the wood spillway box WCS#4 &5. This shall alsoinclude any and all costs for permits, permitting, and compliance with all state and local codes as applicable.Submitted proposals shall include Proposer’s approach.Work should be done in a manner according to the drawings named "Caw Caw spillway replacementdrawings" (See attachment 3) and consists of furnishing of all materials, labor, equipment and other itemsincidental and necessary to install the following:• Wood spillway box (WCS #4) removal and installation of new.• Wood spillway box (WCS #5) extension of top bulkhead boards to control erosion.• Removal and installation of new WCS #5 (alternate).All work associated with the project will be at Caw Caw Interpretive Center, 5200 Savannah Hwy Ravenel, SC29470.General Scope of Construction:Caw Caw Interpretive Center Spillway Replacement Construction Scope/Specification: 501- Wooden WaterControl Structure - See Attachment 2Contractor Project Requirements:Owner requires a general contractor, including all necessary subcontractors, with all applicable licenses andspecialized skills for work on this project.The Contractor's responsibility under this Agreement commences with the award of the Contract forConstruction and terminates upon completion of the Contractor’s obligation under the warranty period of 1year from Final Completion Date.1. Project scheduleWork shall begin on or before April 1, 2026, with Substantial Completion 13 weeks (90 work days) fromNotice-To-Proceed. Contractor shall reach Final Completion thirty (30) days after Substantial Completion.2CCIC Spillway ReplacementRFP # 2026-013Rain Days will be in accordance with contract clause 5.8.3.2. Project SubmittalsAll submittals are to be electronic files in PDF format, for approval by consultant prior to installation. Allapproved submittals are to be included as a part of Project Close-Out documents.3. Project PermitsThe water control system has a consistency letter from the Army corps of engineers. The work is coveredunder the managed tidal impoundment general permit. Work is subject to the requirements of this generalpermit.a. Any other required permits are the responsibility of the contractor. Contractor is to abide strictly by thepermit and restriction requirements.4. Project Management and Administration:a. Identify a construction superintendent in Proposer Qualification Form- Attachment 1b providing theirname, qualifications including a minimum of 5 years of experience on Historical and Combahee styled RiceTrunk Construction projects that will be committed through the duration of the project.ScheduleThe Request for Proposal shall be available to any qualified Prospector who chooses to respond. CCPRCreserves the right to waive any irregularities and/or to reject any or all proposals that do not adequately meetthe intent of the RFP or cannot be produced within the approved schedule. No proposal may be withdrawnfor a period of sixty (60) days after the date the proposals are due. CCPRC also reserves the right to acceptthe proposal as a whole, or any items listed in the RFP. Listed below is the anticipated schedule for theselection process.Proposal Site MeetingWritten Questions Deadline:Addenda issued, if deemed necessary:Proposal deadline:January 14, 2026 10:00 am ETJanuary 19, 2026 2:00 pm ETJanuary 21, 2026 2:00 pm ETJanuary 26, 2026 2:00 pm ETPROPOSAL SITE MEETING1. For all interested prospective contractors, a site visit provides an opportunity to view thesite, take measurements, and get a thorough project briefing directly from CCPRC’sconsultant and owner. Any questions that arise will need to be followed up in written formand submitted to receive answers.a. Meeting time: Wednesday, January 14, 2026, at 10:00am ET.b. Meeting location: begin at the Welcome Center at Caw Caw Interpretive CenterCounty Park.c. We will tour the site from Construction Access point to laydown site to embankmentrepair site. Prospectors will be allowed to drive their vehicle to the laydown site if3CCIC Spillway ReplacementRFP # 2026-013needed.2. All prospective contractors will be responsible for verification of the site conditions and bysubmittal of a proposal, certify that they have verified measurements and are familiar withthe facilities prior to submitting a proposal3. CCPRC will not meet with individual companies outside of the set Proposal Site Meeting dateand time. Prospective contractors who don’t attend the Proposal Site Meeting, or prefermultiple site visits, can visit the park during regular park hours, Tuesday – Sunday, 9am –5pm. Contractors not attending the Proposal Site Meeting may not ask park staff aboutthe project in person and must submit written questions before the deadline.WRITTEN QUESTIONSAll questions pertaining to the proposal documents shall be referred by e-mail toprcprocurement@ccprc.com. The last day and time for submittal of written questions shall be no later than2:00 p.m. ET, Monday, January 19, 2026. Any interpretation, correction or change of the RFP documentswill be made by addendum. It is your responsibility to monitor the Procurement website atwww.ccprc.com/bids for any additional information, revisions, or addenda that may be posted.ADDENDA:1. An addendum, if deemed necessary, will be posted on the website, www.ccprc.com/bids.2. It is the submitter’s responsibility to determine whether an Addendum has been issued. If so, thesubmitter must obtain copies of such Addendum from the Commission’s website www.ccprc.com/bidsand agrees to be bound by all Addenda that have been issued for this solicitation.DEADLINE:Proposals must be received no later than Monday, January 26, 2022, at 02:00 P.M. ET.Proposal RequirementsSubmitted proposals shall include the information and materials described below and organized in a mannerthat is consistent with the headings and sequence outlined herein and under the Submittal Requirementssection:1. Cost Proposal: provide a cost fee structure proposal in a separate sealed envelope, clearly marked“Cost Proposal”, Caw Caw Interpretive Center Rice Spillway Replacements RFP# 2026-013”.2. Technical Proposal: Narrative descriptions with construction drawings that will emphasizeknowledge and working expertise in the area of historic rice field infrastructure:a. Narrative descriptioni. Detailing the approach and activity detailing suggested materials to utilized in therepair and the approach used to facilitate the repairs, including slope/soil stabilizationfinishing and any appropriate construction drawings, detailed costs, bulkheadingtechniques and specific machines used to complete the task.ii. Detailing the activity detailing suggested materials to utilized in the repair and theapproach used to facilitate the repairs, including any appropriate construction4CCIC Spillway ReplacementRFP # 2026-013
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Snow Hill Water Project (Divi...
Project Name: Snow Hill Water Project (Division 2 - Tank) Agency/Owner: Town of
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/25/2026
HopeHealth Medical Plaza Door...
Project Name: HopeHealth Medical Plaza Door Installation Project Agency/Owner: HopeHealth Ad Publish Date:
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/30/2026