Parks: RFP Design-Build Soccer Field Conversion
Project Information
- Bid Title
- Parks: RFP Design-Build Soccer Field Conversion
- Issuing Agency
- City of Manchester
- Location
- New Hampshire
- Published Date
- May 27, 2026
- Closing Date
- Jun 25, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- FY26-650-56
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid # Description Download PDF Bid Opening Addenda Results FY26-650-56 Parks: RFP Design-Build Soccer Field Conversion
Questions:Kate Waldo
(603) 792-5373
kwaldo@manchesternh.gov
RFP RFP DUE:
June 25, 2026
By 1:00PM
- Attachment Preview
-
REQUEST FOR PROPOSALSANDSUPPORTING DOCUMENTSDesign-Build Soccer Field ConversionFY26-650-56CITY OF MANCHESTER, NEW HAMPSHIREDEPARTMENT OF PUBLIC WORKSPARKS, RECREATION AND CEMETERY DIVISIONSubmissions Deadline1:00 pm, Thursday, June 25, 2026PARKS, RECREATION, AND CEMETERY COMMISSIONColin ManningChairErin Loomis LaughlinSecretaryThomas BozoianJen DrociakDavid FlureyMark GomezTimothy J. CloughertyChief of Parks, Recreation, and CemeteryPublic Work DirectorDesign-Build Soccer Field ConversionFY26-650-56Request For ProposalsGeneral NoticeThe Parks, Recreation, and Cemetery Division of the City of Manchester is requesting Proposalsfor the following Project:Design-Build Soccer Field ConversionFY26-650-56Time, Date, and Place for Receipt of Proposals: Proposal for the Project will be received at theDepartment of Public Works located at 475 Valley Street, Manchester, NH 03103, untilThursday, June 25, 2026, at 1:00 P.M. local time. At that time, the Proposals received will bepublicly opened and read.Project Overview: The City of Manchester is seeking to enter into a single contract for theDesign-Build Soccer Field Conversion project at two existing baseball fields at Sheehan-BasquilPark.The selected Design-Build Contractor will provide all design services, permitting, Sitepreparation, construction labor, materials, and equipment necessary to deliver a fullyfunctional natural-grass soccer field complex. The project includes:• One (1) U11/U12 natural-grass soccer field, 165 ft wide × 240 ft long within the limit ofwork as designation on Appendix 1. Sheehan-Basquil Existing Conditions & Limit of Work• Two (2) U9/U10 natural-grass soccer fields, 105 ft wide × 165 ft long placed inside thesingle U11/U12 field (Appendix 2. Conceptual Drawing)• Efficient and safe orientation of fields, including appropriate spacing and maintenanceaccess• Installation of no less than a 6-foot perimeter commercial grade, black vinyl, chain-linkfencing, and post extensions with netting for safety and ball containment• Design and install drainage improvements that fully integrate existing perimeterdrainage structures• Irrigation system designed, furnished, and installed for natural-grass athletic use• Furnish and install player amenities, including benches, appropriate permanent goals foreach field size, and any associated minor fixtures needed for full field functionality• Establishment of natural grass using sod• Compliance with Site restrictions: no more than 12 inches of excavation may occuranywhere onsite• Project phasing and scheduling to ensure sod will be installed and rooted within thesame construction season• Provide a maintenance plan outlining routine maintenance procedure andtroubleshooting guidelines of field and associated amenities• Deliver as-built design plans and warranty manualsRequest For Proposals_Page 1 of 3Design-Build Soccer Field ConversionFY26-650-56Schedule of Work: The City requires that all Work be completed in time for sod to take root inthe same growing season. Respondents must include:• A detailed construction schedule• Milestones for design, permitting, procurement, construction, and sod installationProposal RequirementsProposals must include the following (more detailed included in the section, Instructions forRespondents):1. Cover Letter2. Team Qualifications3. Warranty Statement4. Project Approach5. Proposal Form6. Statement of Understanding: Project Safety7. Statement of Compliance: Drug Testing ProgramProposal Basis: Design-Build Service – Lump SumRespondents must submit a Proposal on a lump-sum price to complete the full design andconstruction of the new soccer field and associated amenities in accordance with the RFP, allspecifications, and applicable regulations. All labor, materials, equipment, overhead, andincidentals shall be included.In the comparison of Proposal, alternates will be applied in the same order of priority as listedin the Proposal Form.Evaluation CriteriaProposals will be evaluated based on:• Demonstrated experience with athletic field design and construction• Ability to meet seasonal deadlines for sod establishment• Cost competitiveness• Understanding of project constraints and approach• Quality and clarity of proposed schedule• References and past performancePrequalification: All individuals, firms, partnerships, or corporations intending to submit mustbe prequalified for the project if their Proposal exceeds $250,000, per the City of Manchester’sprocurement code. Those Contractors interested in responding shall be required to submit theirproject-specific prequalification form at least five (5) working days prior to the Proposalopening. Prequalification forms may be obtained at the Office of the Department of PublicWorks (475 Valley Street) for $5.00 or downloaded from the following:https://www.manchesternh.gov/Departments/purchasing/Pre-Qualification ApplicationRequest For Proposals_Page 2 of 3Design-Build Soccer Field ConversionFY26-650-56Obtaining the Proposal Documents: Proposal Documents may be downloaded from the City ofManchester’s designated website:https://www.manchesternh.gov/Departments/Purchasing/Bid-Opportunities-and-ResultsThe designated website will be updated periodically with addenda and other informationrelevant to submitting a Proposal for the Project. All official notifications, addenda, and otherProposal Documents will be offered only through the designated website. Neither Owner norEngineer will be responsible for Proposal Documents, including any addenda, obtained fromsources other than the designated website.Pre-Submittal Conference: A pre-submittal conference for the Project will be held onWednesday, June 10, 2026, at 1:00 P.M. at Sheehan-Basquil Park located at 297 Maple St,Manchester, NH 03103. Attendance at the pre-submittal conference is encouraged but notrequired.Instructions to Respondents: For all further requirements regarding Proposal submittal,qualifications, procedures, and contract award, refer to the section, Instructions toRespondents included in the Request for Proposal.Proposal Security and Bonds: Each Proposal must be accompanied by a Bid Bond or certifiedcheck in the amount of 5% of the total Proposal, including Add Alternatives. A Performance andPayment Bond, each in the amount of 100% of the contract price, is required of the successfulRespondent.Questions: Direct questions regarding this Request for Proposals should to Kate Waldo, ParksProject Manager, at (603) 624-5373 or KWaldo@manchesternh.gov.All questions must be received no later than 10 am, seven (7) business days before thesubmission deadline.Equal Opportunity Agency: The City of Manchester is an equal opportunity agency. All qualifiedRespondents will receive consideration without regard to age, color, creed, marital status,national origin, race, religion, sex, or disability in consideration for an award.Issuing Office: Parks, Recreation, and Cemetery Division, Department of Public Works, City ofManchester, N.H.Request For Proposals_Page 3 of 3Design-Build Soccer Field ConversionFY26-650-56Table Of ContentsRequest For Proposals1Instructions For Respondents1DEFINITIONS 1PROPOSAL DOCUMENTS 1QUALIFICATION OF RESPONDENTS3PRE-SUBMITTAL CONFERENCE 3SITE EXISTING CONDITIONS AND EXAMINATION 3RESPONDENT’S REPRESENTATIONS AND CERTIFICATIONS 4INTERPRETATIONS AND ADDENDA5PROPOSAL SECURITY 5CONTRACT TIMES 6SUBSTITUTE AND “OR EQUAL” ITEMS 6PERMITS 7PROPOSAL REQUIREMENTS AND PREPARATION 7SUBMITTAL OF PROPOSAL9MODIFICATION AND WITHDRAWAL OF PROPOSAL 10OPENING OF PROPOSALS 10PROPOSALS TO REMAIN SUBJECT TO ACCEPTANCE 10EVALUATION OF PROPOSALS AND AWARD OF CONTRACT 10BONDS, INDEMNIFICATION, AND INSURANCE 11SIGNING OF AGREEMENT 11Proposal Form1Statement Of Understanding: Project Safety1Statement Of Compliance: Drug Testing Program 1Contracting Requirements 1BONDS, INDEMNIFICATION, AND INSURANCE 1CHANGE ORDERS 3CHOICE OF LAW 3CONTRACT 3DISPUTE RESOLUTION 4LIQUIDATED DAMAGES 4PAYMENT 5RETAINAGE5SUBSTANTIAL COMPLETION 5WARRANTY6Sample Contract Agreement8Prosecution Of Work 1GENERAL CONDITIONS 1SUMMARY OF WORK 2PROJECT DESCRIPTION 2SCOPE OF WORK 3
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
- NAICS 237990Other Heavy and Civil Engineering Construction
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Epoxy Floor Coating, Cold Reg...
Follow Epoxy Floor Coating, Cold Regions Research and Engineering Laboratory, Hanover, NH Active
Federal Agency
Bid 26-13 Sewer System Master...
Title Number Start Date End Date Status Bid 26-13 Sewer System Master PlanFY2026
City of Rochester
Bid Due: 7/08/2026