Sheldon Road Profile Raising & Bridge Replacement

Project Information

Bid Title
Sheldon Road Profile Raising & Bridge Replacement
Issuing Agency
Northeast Ohio Regional Sewer District
Location
Ohio
Published Date
Sep 13, 2026
Closing Date
Sep 23, 2026
Government Level
State & Local
Status
Closed
Ref. #
EB-2512
Original Source
Join to Access Full Details
Project Description


Project ID: EB-2512

Title: Sheldon Road Profile Raising & Bridge Replacement

Addenda: 4

Release Date: 8/18/2026

Due Date: 9/23/2026

Follow
Sheldon Road Profile Raising & Bridge Replacement
Last updated by Addendum #4 on Sep 12, 2026 1:48 AM
Invitation For Bid
Watershed Programs
Project ID: EB-2512
Release Date: Tuesday, August 18, 2026
ยท Due Date: Wednesday, September 23, 2026 1:00pm
Posted Tuesday, August 18, 2026 8:00am
All dates & times in Eastern Time - New York
Draft Response Events RSVP No Bid9 days, 15 hours, 32 minutes


Post Information

Posted At:Tue, Aug 18, 2026 8:00 AM
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
Overview


Summary

The Sheldon Road Profile Raising & Bridge Replacement Project (Project) is located along Sheldon Road, on the community border of Brook Park and Middleburg Heights. The project is located within the Abram Creek watershed, a tributary to the Rocky River. Local flooding occurs as early as the 2-year storm event along a portion of Sheldon Road, between Eastland Road and Engle Road, leading to impassable flooding of Sheldon Road. A contributing factor to the flooding is the existing cast-in-place reinforced concrete rigid frame (box) structure beneath Sheldon Road, which is in a state of deterioration.

The project involves the construction of a 60' single span prestressed concrete box beam bridge to replace the existing box culvert. This design will result in a bridge structure with a profile set above the 100-year water surface elevation. The Project will also involve raising the profile of a 1,060-feet length of Sheldon Road by an average of 2.97-feet (maximum elevation change 5.53-feet). The raised roadway consists of 2 - 11 ft. lanes with 2 - 4 ft shoulders, 30 ft. total width, with a 1.25 ft wide parapet that does not extend beyond the bridge approach slab. The design includes a 10 ft wide sidewalk across the north side of the bridge/approach slabs and 5 ft. sidewalk on the north roadway approaches.

The objective of this project is to address the structural deterioration of the existing box culvert and improve the conveyance of stormwater flows up to the 100-year design storm, elimination the overtopping of Abram Creek onto Sheldon Road.



Background

The Northeast Ohio Regional Sewer District (Sewer District) protects public health and the environment by leading effective wastewater and stormwater management. As the largest wastewater treatment provider in the State of Ohio, the Sewer District spans 380 square miles, serves 62 communities and one million residents, treats 90 billion gallons of wastewater a year, and manages more than 400 miles of streams.

In addition to its award-winning treatment plant and laboratory performance, the Sewer District's Project Clean Lake construction program will reduce annual Lake Erie pollution by 4 billion gallons by 2035, while its Regional Stormwater Management Program addresses widespread inter-community problems like flooding, pollution, and erosion.

NEORSD is an Equal Opportunity Employer. We are committed to fostering a diverse and inclusive workforce, recognizing the full range of human differences and similarities. Through our unwavering efforts to leverage the potential of our diversity, we continually strive to build and foster an environment that respects each individual . We encourage and promote innovation and provide opportunities for all employees to interact, communicate, and realize the full potential of their talents.



Timeline

Bid Publish:
August 18, 2026
Pre-Bid Meeting (Non-Mandatory):
August 27, 2026, 10:00am
EMSC 4747 E. 49th St., Cuyahoga Heights, Ohio 44125 Conference Rooms A and B
Question Submission Deadline:
September 4, 2026, 1:00pm
Bid Opening:
September 23, 2026, 1:00pm
Commodity Codes
  • NAICS 237310Highway, Street, and Bridge Construction
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.

Government Bids

Empower Your Bidding Strategy

Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.

  • Access an extensive database of bids, including comprehensive local and state opportunities.
  • Receive customized alerts for the bids that matter most to your business.
  • Explore detailed specifications to ensure precise and competitive submissions.
  • Gain a competitive edge with up-to-date information and exclusive opportunities.

See Also

Bid Opening-Construction Insp...

Bid Opening-Construction Inspection and Administration for the replacement of the Main Street Bridge

Allen County

Bid Due: 10/30/2026

Mosquito Lake Control Tower S...

Follow Mosquito Lake Control Tower Structural Standing Seam Metal Roof Replacement Active Contract

DEPT OF DEFENSE

Bid Due: 10/26/2026