Fencing and column construction at Gage Park Play Land.
Project Information
- Bid Title
- Fencing and column construction at Gage Park Play Land.
- Issuing Agency
- Shawnee County
- Location
- Kansas
- Published Date
- Jan 27, 2026
- Closing Date
- Feb 13, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- 004-26
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Request Department Description Due Date Parks and Recreation Fencing and column construction at Gage Park Play Land. 2/13/2026 2:00 PM - Attachment Preview
-
SHAWNEE COUNTYREQUEST FOR PROPOSAL(RFP)Quotation Number: 004-26Date Issued:01-27-2026Closing Date:02-13-2026 2:00pmVendor Name: ______________________________Address: ___________________________________Phone Number:______________________________THIS IS NOT AN ORDER1. In communications, always refer to the above quotation number.2. All prices and conditions must be shown. Additions or conditions not shown on this bid will not beallowed.3. Shawnee County reserve the right to accept or reject any part of, or all of, any bid or proposal.4. All prices quoted are to be less Federal Excise Tax and Kansas Sales Tax.5. Price quoted shall remain firm for ninety (90) days after bid closing date.*SHAWNEE COUNTY HAS AN ELECTRONIC BID SYSTEM*All vendors are required to create an online portal account (www.snco.gov/purchasing) in order to receiveor submit bid requests. All responses must be submitted through the bid portalITEM AND DESCRIPTIONShawnee County is soliciting sealed proposals from qualified contractors to provide fencing servicesand column construction for the reconstruction of Play Land located in Gage Park and operated bythe Shawnee County Parks and Recreation Department.PRE-BID MEETINGA MANDATORY pre-bid meeting and on-site inspection is being held as part of the RFP process. Themeeting will be held on:Thursday, February 5, 2026 at 1:00 pmGage Park Playland (near train depot)635 SW Gage Blvd. Topeka, KS 66606Attendance is mandatory at the pre-proposal conference. All questions requesting clarification ofitems/issues discussed at the pre-proposal conference must be submitted in writing via the online bid portal.Proposers should clearly understand that the only official answer or position of Shawnee County will be inwriting. Any modification to this Request arising from the pre-proposal conference, as well as answers towritten questions shall be made in writing by addendum and will be issued through the online bid portal.INTRODUCTIONShawnee County Parks and Recreation Department (SCP+R) is seeking proposals from qualified contractorsto provide all labor, materials, construction equipment, coordination, and supervision necessary for thefencing and column services of the Gage Park Play Land prior to June 2026.SCOPE OF WORKSteel picket fencing shall be provided for the following areas located in the Play Land Park.1. Sky Trail Retaining Wall: Fencing shall be provided and installed between the existing Sky Trailsteel pipe columns indicated as T 5.1, T6, T6.1, and T7 on the supplemental drawings. An optional 8’segment may be located between T5.1 and the existing sidewalk. The fencing shall be surfacemounted along the top of the existing concrete retaining wall. Fencing shall be based on existingdimensions between Sky Trail columns.2. PA-2: Fencing shall be provided and installed along the indicated 24” x 6” concrete mow strip on thenorth side of PA-2 (points 26A to 79). The fencing shall be mounted on the surface along the top ofthe existing mow strip (26A to 79) and include the installation of stone columns (26A, 27, 28A, and79) on existing concrete footings. Placement of columns and fencing shall be compatible with theexisting concrete footings. As an option, the fence posts may be core drilled with acceptance bySCP+R.3. RR-Trickle Channel: Fencing shall be provided and installed along the indicated concrete entrywalkway, 12” x 12” curbing, or mow strip on the west side of the RR tracks and trickle channel. Thefencing shall be surface mounted along the top of the existing concrete walkway (20 to 14A), andinclude the installation of stone columns (14A, 14B, 38, 16, 17, 17A, 17B, 17C, 17D, 17E, 20) onexisting concrete footings. Placement of columns and fencing shall be compatible with the existingconcrete footings. As an option, the fence posts may be core drilled with acceptance by SCP+R.4. Note: Meri-Crete currently has the concrete placement contract for all concrete column footings,walks, curbing, and mow strips indicated. Coordination of fence (post) placement with Meri-Crete’splacement of concrete may be considered for acceptance by SCP+R.5. Reference attached Supplemental Detail Drawings and PEC Project Plans for locations and additionaldetail.SCOPE OF WORK – Basis of Payment1. Installation of steel picket fencing along the entry walk and RR track on the east side of the site($/LF).a. Installation of steel picket fencing along the north side of PA-2 with surface mount to the 12” x 12”concrete curbing or an option for in-ground installation. ($/LF)2. Installation of stone columns along the fencing as indicated in the drawings. ($/Each)3. Installation of steel picket fencing along the top of the concrete retaining wall between existingsidewalk and Sky Trail Towers 5.1 to 7.1 with surface mounting. ($/LF)4. Installation of stone columns on each designated column footing location. ($/EA)CONTRACTOR RESPONSIBILITIES AND RESTRICTIONS1. Surface Mount Fence Between Sky Trail Towers T5 to T7: Contractor shall field measureinstalled distances between Sky Trail Towers (Sidewalk to T5.1, T5.1 - T6.0, T6.0 - TY6.1,and T6.1 - T7.0) to provide base information for fence configuration. Field measurementsmust consider base plate flange and the vertical pipe column for single towers and the centervertical panel between the “goal post’ towers T5.1 and T6.1. All fencing for this segmentshall be surface mount. Remaining gap(s) between the last post and vertical tower elementsshall not be more than 4”. Fence along retaining wall (T5.0 to T7.0) shall only be placed afterthe Sky Trail elements in this area have been installed.2. Fencing Between Stone Columns: Contractor shall field measure distances between allinstalled concrete footings to confirm installed CL to CL distances. Column sizing and fenceconfiguration to accommodate footings and CL/CL distances shall be confirmed prior toinstallation of fence. Fencing for these segments shall be a combination of surface mount orcore drill. Remaining gap(s) between the last post and the stone column face(s) shall not bemore than 4”. Fence along the RR tracks (east side) shall only be placed after the installationof the concrete trickle channel, sidewalks, and mow strips.3. Contractor shall provide a detailed shop drawing for all fence and stone column components.4. The contractor shall protect all trees and existing play equipment remaining on theconstruction site. No further trees will be removed without SCP+R discussion and approval.5. The contractor shall be responsible for obtaining all utility locates prior to any work.6. A project access map has been provided to indicate that all construction activities mustingress and egress from SW Blaisdell Drive along the west side of Play Land. Noconstruction access will be allowed from the east across the Mini-Train RR tracks unlessspecifically authorized by SCP+R.7. There will be no access, storage, or construction within the adjacent Animal Landimmediately north of Play Land.8. Site cleanup will be subsidiary to all construction. Contractor shall remove all debris, toapproved sites.9. See criteria and specifications below for additional requirements.FENCE SPECFICATIONS1.0 General1.1 DescriptionFurnish and install a complete steel picket fence system, 48 inches in height above finished grade, with bothsurface-mounted and core drill posts as indicated on the attached drawings. All components shall be plainsteel with black powder-coated finish and welded construction throughout.1.2 Scope of Work (Fencing and Stone Columns)This specification covers the complete furnishing and installation of a welded steel picket fence systemincluding steel posts, rails, pickets, base plates, anchors, and all associated hardware.Steel picket fencing shall be compatible and adaptable to the stone columns provided as part of this work.Dimensions, connections, and fence post anchoring shall be coordinated with column sizing (dimensions)and surface stone materials. The gap between the posts adjacent to stone columns shall be 4” or less.1.3 Related Work (Stone Columns)Stone columns shall be provided along the fencing proposed at the RR track area and PA-2. Columns shallbe placed on existing concrete footings 24” Diameter or 24” x 24” x 36” D as constructed by others.Columns shall be 52” tall. Columns may be laid stone or filled concrete block with artificial stone veneerwith 2” stone cap (see attached for reference). Fence to be installed between stone columns but not attach tocolumn or footing. SCP+R will approve the column design and stone type selection prior to installation.Column voids to be filled with concrete. Each stone column shall be secured to its respective concretefooting with 4 #4 vertical rebar (min. 8” in length) drilled and securely doweled with 4” min. embedmentinto the footing and into column concrete fill above the footing. Column cap shall be securely fastened totop of column to prevent any movement. SCP+R will approve the column design and stone type selectionprior to installation.1.4 Applicable Standards• ASTM A653/A653M: Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated by Hot-DipProcess• ASTM A500: Cold-Formed Welded and Seamless Carbon Steel Structural Tubing• ASTM A36/A36M: Carbon Structural Steel• ASTM D523: Specular Gloss Test Method• ASTM D3359: Rating Adhesion by Tape Test• ASTM B117: Operating Salt Spray (Fog) Apparatus• AWS D1.1: Structural Welding Code - Steel (American Welding Society)• AAMA 2604: Voluntary Specification for High Performance Organic Coatings on Aluminum Extrusions• SSPC-SP6: Commercial Blast Cleaning2.0 MATERIALS2.1 Steel PostsSize: 2" x 2" square Hollow Structural Section (HSS) tube steelWall Thickness: 1/4" (0.250") nominal - equivalent to 7-gaugeMaterial: ASTM A500 Grade B or C cold-formed steel tubing, or ASTM A653 galvanized steelSpacing: 8'-0" center-to-center typicalSurface Mount Posts: Finished height 52" maximum above grade (to allow for base plate and post cap)Core Drill Posts: Set in concrete footings per drawings2.2 Steel RailsSize: 1-1/4" x 1-1/4" square HSS tube steelWall Thickness: 1/8" (0.125") nominal - equivalent to 11-gaugeMaterial: ASTM A500 Grade B or CConfiguration: Three (3) horizontal rails per fence panel:• Top rail: At fence top (48" above finished grade)• Middle rail: 3-1/2" clear below bottom of top rail (approximately 44-1/2" above grade)• Bottom rail: Top at 8" above finished grade2.3 Steel PicketsSize: 1-1/4" wide x 5/8" thick hot-rolled steel flat barMaterial: ASTM A36 hot-rolled steel flat barSpacing: 4" center-to-center (resulting in 3-1/2" maximum clear spacing between pickets)Height: As required to accommodate indicated rail positions.Bottom Clearance: 3" minimum above finished grade2.4 Base Plates (Surface Mount Posts)Size: 6" x 6" minimumThickness: 1/4" (0.250") plateMaterial: ASTM A36 steel platePost Connection: Welded connection all post sides with steel plateMounting: Surface mount on concrete, one plate per postAnchor Holes: Four (4) holes per plate for 1/2" diameter anchors-embedded min. 4” in concrete.Finish: The surface mount post base plate shall either be powder coated to match fence system per specs orshall be fully coated with an approved exterior UV resistant epoxy following necessary cleaning of the platefollowing welding to the posts.2.5 Post CapsSize: 2" x 2" flat plate cap or suggested alternativeThickness: 1/4" (0.250") thickMaterial: ASTM A36 steel plateStyle: Flat cap, welded to top of post or suggested alternativeOverall Post Height: Not greater than 52” from finished grade.2.6 Concrete Anchors (Surface Mount Posts)Type: Wedge expansion anchors or sleeve anchorsMaterial: Stainless steel AISI 304 or 316Size: 1/2" diameter minimumQuantity: Four (4) anchors per base plateEmbedment: 4" minimum into concreteCapacity: Minimum 2,000 lbs tensile strength per anchorStandard: ICC-ES approved2.7 Welding MaterialsElectrodes: AWS classification E7018 or suitable for base metalFiller Metal: Matching base metal compositionAll welding materials shall conform to AWS specifications3.0 FABRICATION3.1 General Requirements• All fabrication shall be performed in accordance with AWS D1.1 Structural Welding Code - Steel• All members shall be straight, true, and free from defects• All cuts shall be straight and square• Sharp edges and weld spatter shall be removed
- Commodity Codes
-
- NAICS 238990All Other Specialty Trade Contractors
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Event Name On Call Concrete Business Unit Department of Administration Event ID EVT0010768
State Government of Kansas
Bid Due: 7/15/2026
Contract: 526072515 Call #: 251 Project Number: U054-048 KA 6452-01 Federal Project Number:
State Government of Kansas
Bid Due: 7/22/2026