2026 Water Treatment Plant Roof Improvements
Project Information
- Bid Title
- 2026 Water Treatment Plant Roof Improvements
- Issuing Agency
- City of Aberdeen
- Location
- South Dakota
- Published Date
- Jan 6, 2026
- Closing Date
- Jan 20, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Title: 2026 Water Treatment Plant Roof Improvements
Category: City of Aberdeen Bid Postings Status: Open Description: The City of Aberdeen South Dakota is accepting sealed bids for the 2026 Water Treatment Plant Roof Improvements with bids to be opened and read on January 20th, 2026 at 2:00 PM in the 3rd floor conference room at City Hall 123 South Lincoln Street. The link for the download of the complete bid packet is available below - please allow extra time for downloading large documents.
Please click on this link to download the response form so that we
can add your information to the plan holders list, thank you for your cooperation.
http://www.aberdeen.sd.us/FormCenter/BID-DOCUMENTS-PLAN-HOLDERS-FORMS-2/Bid-Submission-Form2-36
Please also use this link http://www.aberdeen.sd.us/index.aspx?NID=38 and go to the bids section to sign up to receive either a text or email when new addendums are added so that your bid will have everything that is required when you submit it.
Publication Date/Time: 1/6/2026 12:00 AM Closing Date/Time: 1/20/2026 2:00 PM Bid Opening Information: 2:00 PM 01/20/2026 Contact Person: Stu Nelson 605-626-7011 Plan & Spec Available: A COPY OF THE ENTIRE BID PACKET IS AVAILABLE BELOW FOR DOWNLOAD.
ANY ADDENDUMS WILL ALSO BE LISTED ON THIS WEBSITE, PLEASE DOWNLOAD AND ATTACH ANY ADDENDUM AND ACKNOWLEDGE EACH ADDENDUM ON YOUR BID.Plan Holders List: Construction Industry Center
Attn: Beverly Wittmeier
Rapid City, SD 57702Miscellaneous: Please check periodically for any necessary addendums to this bid before returning your bid documents Related Documents: - Attachment Preview
-
ROOF DIAGNOSTIC SURVEY FOR CITY OF ABERDEEN, SDWATER TREATMENT BUILDINGS12668 391ST AVENUE, ABERDEEN, SOUTH DAKOTA 57401THIS IS A WTI BRANDED REPORT. THE TEMPLATE AND ORREPORT CAN NOT BE REPRODUCED IN ANY MANNER.DRAWINGSTITLE PAGESHEET ASHEET BSHEET B1SHEET CMOISTURE SURVEY - BUILDING 1MOISTURE SURVEY - BUILDING 2WET DIMENSIONS & SQ.FT.ROOF DATA, THERMOGRAMS & PHOTOSNROOF PLAN - BUILDING 1SCALE: NO SCALENROOF PLAN - BUILDING 2SCALE: NO SCALEHow An Infrared Survey Works:Wet roof insulation absorbs more solar energy from thesun during the day than dry insulation. As the sun sets, thenighttime cools the roof surface. Wet insulation retainsmore solar energy than dry insulation. These temperaturedifferences are detected by the infrared camera. All fullservice scans are performed using a mid-wave IR camerawith a 2.5 - 5.6 spectral range. Suspected wet insulation isverified through core cuts and/or a Roof Moisture Meter.Core cuts are taken to establish acceptable levels ofmoisture. Confirmed wet areas are marked out on theroof surface with paint.How A Moisture Meter Works:During the daytime, readings are taken and recorded inrandom locations and at wet areas found by the infraredcamera.Fast neutrons are emittedfrom the source in the RoofMoisture Meter into the roofsystem. The presence ofhydrogen in the roof systemslows the neutrons. Theseslowed neutrons as well as the fast neutrons aredetected by the Roof Moisture Meter. A reading isdisplayed in the digital readout and gets recorded.Core cuts are taken to determine a baseline for dry roofmaterials. Wet areas of insulation are marked on theroof surface with paint.© 2025 BY TREMCO CONSTRUCTION PRODUCTS GROUP, ALL RIGHTS RESERVED. NO PART OF THISDOCUMENT MAY BE REPRODUCED OR TRANSMITTED IN ANY FORM OR BY ANY MEANS, ELECTRONIC,MECHANICAL, PHOTOCOPYING, RECORDING OR OTHERWISE WITHOUT THE EXPRESS PRIOR WRITTENCONSENT OF TREMCO CONSTRUCTION PRODUCTS GROUP. THE INFORMATION PROVIDED IN THISDRAWING IS CURRENT AS OF THE DATE OF INSPECTION BY TREMCO CONSTRUCTION PRODUCTS GROUP,WEATHERPROOFING TECHNOLOGIES, INC. OR THEIR DESIGNATED CONTRACTOR. ROOFING SYSTEMAND/OR BUILDING CONDITIONS CAN CHANGE AT ANY TIME, INCLUDING BUT NOT LIMITED TO THEAMOUNT OF WET INSULATION IN THE ROOFING SYSTEM, AND CAUSE THE INFORMATION PROVIDED INTHIS DRAWING TO CHANGE OR BECOME OUT OF DATE.TREMCO CONSTRUCTION PRODUCTS GROUP INFRARED INSPECTIONS ARE PERFORMED BY CERTIFIED(EXPERIENCED) INFRARED THERMOGRAPHERS UTILIZING STATE-OF-THE-ART EQUIPMENT. ALL WORK CONFORMSWITH CURRENT INDUSTRY BEST PRACTICES, AND IS PERFORMED IN ACCORDANCE WITH STANDARDS PUBLISHED BYASTM INTERNATIONAL AND INFRASPECTION INSTITUTE.Thermogram T-01Thermogram T-0285881-A 75807790190402-A40858045422-B29088991-B 808598903-A 909339995883-B 88904-A 60907063T-017044-B 658590805540405-A 50505405-B 40T-02AREA OF SURVEY424240NROOF PLANSCALE: NO SCALE# ROOF SECTIONDRY COREWET COREP-#PHOTOT-#THERMOGRAMN.A.F. (NO ANOMALIESFOUND)STANDARD KEY OF SYMBOLSWET INSULATIONR.I.M. (RANDOMINTERMITTENT MOISTURE)N.I.C.MOISTURE GRIDTRACE CORE# MOISTURE READINGCITY OF ABERDEEN - SDWATER TREATMENT BUILDING #0112668 391ST AVENUEABERDEEN, SOUTH DAKOTA 57401© 2025 BY TREMCO CONSTRUCTION PRODUCTS GROUP, ALL RIGHTS RESERVED. NO PART OF THIS DOCUMENT MAY BE REPRODUCED OR TRANSMITTED IN ANY FORM OR BY ANY MEANS, ELECTRONIC, MECHANICAL, PHOTOCOPYING, RECORDING OR OTHERWISE WITHOUT THE EXPRESS PRIOR WRITTEN CONSENT OF TREMCO CONSTRUCTION PRODUCTS GROUP. THE INFORMATION PROVIDED IN THIS DRAWING IS CURRENT AS OFTHE DATE OF INSPECTION BY TREMCO CONSTRUCTION PRODUCTS GROUP, WEATHERPROOFING TECHNOLOGIES, INC. OR THEIR DESIGNATED CONTRACTOR. ROOFING SYSTEM AND/OR BUILDING CONDITIONS CAN CHANGE AT ANY TIME, INCLUDING BUT NOT LIMITED TO THE AMOUNT OF WET INSULATION IN THE ROOFING SYSTEM, AND CAUSE THE INFORMATION PROVIDED IN THIS DRAWING TO CHANGE OR BECOME OUT OF DATE.NKEY PLANSCALE: NO SCALEDIAGNOSTIC TECHNICIAN:H. VARGASDRAWN BY:SRDATE:8/14/2025PROJECT NO.:9886191SHEET NO.:A78798899988277888884 837777888888881-B 108501-A718T-0389988999899787 5-A 760 7T-049888T-055-C 10899878885775 77298705-B788888T-0686-A 750 8878887887855 876786-B 988788877-B 10888899785587845407-A50 778 60T-0878T-0788888NROOF PLANSCALE: NO SCALE# ROOF SECTIONDRY COREWET COREP-#PHOTOT-#THERMOGRAMN.A.F. (NO ANOMALIESFOUND)STANDARD KEY OF SYMBOLSWET INSULATIONR.I.M. (RANDOMINTERMITTENT MOISTURE)N.I.C.MOISTURE GRIDTRACE CORE# MOISTURE READINGCITY OF ABERDEEN - SDWATER TREATMENT BUILDING #0212668 391ST AVENUEABERDEEN, SOUTH DAKOTA 57401© 2025 BY TREMCO CONSTRUCTION PRODUCTS GROUP, ALL RIGHTS RESERVED. NO PART OF THIS DOCUMENT MAY BE REPRODUCED OR TRANSMITTED IN ANY FORM OR BY ANY MEANS, ELECTRONIC, MECHANICAL, PHOTOCOPYING, RECORDING OR OTHERWISE WITHOUT THE EXPRESS PRIOR WRITTEN CONSENT OF TREMCO CONSTRUCTION PRODUCTS GROUP. THE INFORMATION PROVIDED IN THIS DRAWING IS CURRENT AS OFTHE DATE OF INSPECTION BY TREMCO CONSTRUCTION PRODUCTS GROUP, WEATHERPROOFING TECHNOLOGIES, INC. OR THEIR DESIGNATED CONTRACTOR. ROOFING SYSTEM AND/OR BUILDING CONDITIONS CAN CHANGE AT ANY TIME, INCLUDING BUT NOT LIMITED TO THE AMOUNT OF WET INSULATION IN THE ROOFING SYSTEM, AND CAUSE THE INFORMATION PROVIDED IN THIS DRAWING TO CHANGE OR BECOME OUT OF DATE.DIAGNOSTIC TECHNICIAN:H. VARGASDRAWN BY:SRDATE:8/14/2025PROJECT NO.:9886191SHEET NO.:B24'20 SQ. FT.3'69 SQ. FT.437'13'149 SQ. FT.4'16 SQ. FT.5100'4'5'116 SQ. FT.7' 3'61'6' 6'12'7246 SQ. FT.7'6'8'NROOF PLANSCALE: NO SCALE# ROOF SECTIONDRY COREWET COREP-#PHOTOT-#THERMOGRAMN.A.F. (NO ANOMALIESFOUND)STANDARD KEY OF SYMBOLSWET INSULATIONR.I.M. (RANDOMINTERMITTENT MOISTURE)N.I.C.MOISTURE GRIDTRACE CORE# MOISTURE READINGCITY OF ABERDEEN - SDWATER TREATMENT BUILDING #0212668 391ST AVENUEABERDEEN, SOUTH DAKOTA 57401© 2025 BY TREMCO CONSTRUCTION PRODUCTS GROUP, ALL RIGHTS RESERVED. NO PART OF THIS DOCUMENT MAY BE REPRODUCED OR TRANSMITTED IN ANY FORM OR BY ANY MEANS, ELECTRONIC, MECHANICAL, PHOTOCOPYING, RECORDING OR OTHERWISE WITHOUT THE EXPRESS PRIOR WRITTEN CONSENT OF TREMCO CONSTRUCTION PRODUCTS GROUP. THE INFORMATION PROVIDED IN THIS DRAWING IS CURRENT AS OFTHE DATE OF INSPECTION BY TREMCO CONSTRUCTION PRODUCTS GROUP, WEATHERPROOFING TECHNOLOGIES, INC. OR THEIR DESIGNATED CONTRACTOR. ROOFING SYSTEM AND/OR BUILDING CONDITIONS CAN CHANGE AT ANY TIME, INCLUDING BUT NOT LIMITED TO THE AMOUNT OF WET INSULATION IN THE ROOFING SYSTEM, AND CAUSE THE INFORMATION PROVIDED IN THIS DRAWING TO CHANGE OR BECOME OUT OF DATE.DIAGNOSTIC TECHNICIAN:H. VARGASDRAWN BY:SRDATE:8/14/2025PROJECT NO.:9886191SHEET NO.:B1Thermogram T-03Thermogram T-04Thermogram T-05Thermogram T-06Thermogram T-07Thermogram T-08# ROOF SECTIONDRY COREWET COREP-#PHOTOT-#THERMOGRAMN.A.F. (NO ANOMALIESFOUND)STANDARD KEY OF SYMBOLSWET INSULATIONR.I.M. (RANDOMINTERMITTENT MOISTURE)N.I.C.MOISTURE GRIDTRACE CORE# MOISTURE READINGCITY OF ABERDEEN - SDWATER TREATMENT BUILDING #0212668 391ST AVENUEABERDEEN, SOUTH DAKOTA 57401© 2025 BY TREMCO CONSTRUCTION PRODUCTS GROUP, ALL RIGHTS RESERVED. NO PART OF THIS DOCUMENT MAY BE REPRODUCED OR TRANSMITTED IN ANY FORM OR BY ANY MEANS, ELECTRONIC, MECHANICAL, PHOTOCOPYING, RECORDING OR OTHERWISE WITHOUT THE EXPRESS PRIOR WRITTEN CONSENT OF TREMCO CONSTRUCTION PRODUCTS GROUP. THE INFORMATION PROVIDED IN THIS DRAWING IS CURRENT AS OFTHE DATE OF INSPECTION BY TREMCO CONSTRUCTION PRODUCTS GROUP, WEATHERPROOFING TECHNOLOGIES, INC. OR THEIR DESIGNATED CONTRACTOR. ROOFING SYSTEM AND/OR BUILDING CONDITIONS CAN CHANGE AT ANY TIME, INCLUDING BUT NOT LIMITED TO THE AMOUNT OF WET INSULATION IN THE ROOFING SYSTEM, AND CAUSE THE INFORMATION PROVIDED IN THIS DRAWING TO CHANGE OR BECOME OUT OF DATE.DIAGNOSTIC TECHNICIAN:H. VARGASDRAWN BY:SRDATE:8/14/2025PROJECT NO.:9886191SHEET NO.:C
- Commodity Codes
-
- NAICS 237110Water and Sewer Line and Related Structures Construction
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Event ID: 26IFB19841 Event Name: Road Chemicals Published Date: Jun 10, 2026, 12:45
State Government of South Dakota
Bid Due: 7/08/2026
Surplus Property Sale of Lake...
Bid Number: 2026-0012 Bid Title: Surplus Property Sale of Lake Kampeska Treatment Plant,
City of Watertown
Bid Due: 9/10/2026