Opens March 31 ? EV Charging Facility Project ? Plan Drawings

Project Information

Bid Title
Opens March 31 ? EV Charging Facility Project ? Plan Drawings
Issuing Agency
Effingham city
Location
Illinois
Published Date
Mar 2, 2026
Closing Date
Mar 31, 2026
Government Level
State & Local
Status
Closed
Original Source
Join to Access Full Details
Attachment Preview
BM #1
Concrete
CP #1
Concrete
596.5
Rock
Cleanout
Fence
TO BE PLUGGED AND
ABANDONED
597.0
T
Inlet, T1F, OL
Top\Rim=595.51
S
Asphalt
Exist. 1¼" PE Gas Main
E
Fiber Handhole E
597.5
CP #2
Sanitary MH
Top\Rim=595.83
Exist. 10" Watermain
Fiber Handhole
UNDERGROUND FACILITIES, STRUCTURES AND UTILITIES HAVE BEEN PLOTTED
FROM AVAILABLE SURVEYS, RECORDS AND INFORMATION, AND, THEREFORE DO
NOT NECESSARILY REFLECT THE ACTUAL EXISTENCE, NON-EXISTENCE, SIZE,
TYPE, NUMBER, OR LOCATION OF THESE FACILITIES, STRUCTURES AND
UTILITIES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE
ACTUAL LOCATION OF ALL UNDERGROUND FACILITIES, STRUCTURES, AND
UTILITIES, EITHER SHOWN OR NOT SHOWN ON THESE PLANS. THE
UNDERGROUND FACILITIES, STRUCTURES, AND UTILITIES SHALL BE LOCATED IN
THE FIELD PRIOR TO ANY GRADING, EXCAVATION OR CONSTRUCTION OF
IMPROVEMENTS. THESE PROVISIONS SHALL IN NO WAY ABSOLVE ANY PARTY
FROM COMPLYING WITH THE UNDERGROUND FACILITY SAFETY AND DAMAGE
PREVENTION ACT. CONTRACTOR MUST CONTACT J.U.L.I.E. 48 HOURS PRIOR TO
THE BEGINNING OF CONSTRUCTION.
CONTRACTOR SHALL REPAIR ANY DAMAGED UTILITY LINES CAUSED BY HIS/HER
ACTIVITIES. ALL WORK REQUIRED TO PERMANENTLY REPAIR THE UTILITY TO THE
ENGINEER'S SATISFACTION SHALL BE AT THE CONTRACTORS EXPENSE.
CONTRACTOR SHALL POTHOLE ALL LOCATIONS WHERE PROPOSED UTILITIES, OR
DRAINAGE IMPROVEMENTS ( DITCHES, SWALES, OUTFLOW STRUCTURES) THAT
WILL CROSS EXISTING UTILITIES TO VERIFY THERE WILL NOT BE A CONFLICT.
IF A CONFLICT IS FOUND THE CONTRACTOR SHALL CONTACT THE ENGINEER.
R
Know what's below.
Callbefore you dig.
DESIGN STAGE J.U.L.I.E. TICKET NUMBER
Ticket No:
A253162466
596.5
Cleanout
597.0
Fence
TO BE PLUGGED AND
ABANDONED
Exist. 1¼" PE Gas Main
597.5
SITE
LOCATION
LOCATION MAP
INDEX OF SHEETS
1
EXISTING TOPOGRAPHY SHEET
2
SITE PLAN SHEET
3
ELECTRICAL PLAN
EV CHARGING STATION DETAILS
FO
S
LEGEND
IRON PIN FOUND
TREE (DECIDUOUS)
TREE (CONIFER)
FIRE HYDRANT
WATER METER
WATER MAIN (EXISTING)
VALVE (GAS OR WATER)
TELEPHONE CABLE (EXISTING)
FIBER OPTIC POLE
FIBER OPTIC CABLE (EXISTING)
POWER POLE
POWER POLE w/LIGHT
GUY ANCHOR
OVERHEAD ELECTRIC (EXISTING)
UNDERGROUND ELECTRIC (EXISTING)
SANITARY SEWER MANHOLE (EXISTING)
SANITARY SEWER (EXISTING)
STORM SEWER MANHOLE (EXISTING)
STORM SEWER INLET (EXISTING)
STORM SEWER (EXISTING)
CONTROL POINTS
Point # Northing Easting Elevation Description
1 893822.30 923830.66 596.89 Iron Pin (CP #1)
2 893742.05 923801.00 596.80 Iron Pin (CP #2)
3 893845.30 923897.04 596.66
BM #1
0 5 10
Contour Interval = 1'
Referenced to the Illinois State Plane Coordinate
System East Zone Datum of NAD83(2011) Epoch
2010.00 ORTHO HEIGHT: NAVD 88(GEOID12B)
SHEET #
1 OF 3
JOB #
25011
BM #1
596.22
Concrete
P.C.C. PAVEMENT, 6" (286 SY)
596.85
CP #1
596.29
596.30
596.52
597.35(SW)
596.95
596.31
596.32
597.42(SW)
596.97
Concrete
596.31
596.31
596.34
596.38
Rock
597.01
597.51(SW)
20'
Fence
P.C.C. SIDEWALK, 4" (241 SF)
5'
3'
BUFFER \ LANDSCAPE AREA
(SEE NOTE 15)
597.18
597.42(SW)
596.42
T
596.79
CONCRETE FOUNDATION (12 CY)
SEE DETAIL "A"
597.39
Inlet, T1F, OL
Top\Rim=595.51
S
Exist. 1¼" PE Gas Main
597.16
Asphalt 597.66(SW)
597.74(SW)
E
BOLLARD (4 EACH)
Fiber Handhole E
CP #2
Sanitary MH
Top\Rim=595.83
Exist. 10" Watermain
Fiber Handhole
P.C.C. PAVEMENT, 6"
Variable
6"
5'
1.50%
P.C.C. SIDEWALK, 4"
TYPICAL SIDEWALK SECTION
3' (LANDSCAPE AREA)
Variable
Existing Fence
SET BACKS
Required for M-1 Zoning
Front Yard = 25'
Side Yard = 0'
Rear Yard = 0'
P.C.C. PAVEMENT, 6"
Variable
5'
#4 REBAR @ 12" CTR.
(TOP AND BOTTOM)
1.50%
3' (LANDSCAPE AREA)
Variable
Existing Fence
NOTE 1:#4 REBAR TO BE INCLUDED IN THE
UNIT COST OF CONCRETE FOUNDATION.
NOTE 2:SEE DWG #CHPT-CPE-E-7001 FOR MOUNTING
PLATE INSTALLATION DETAILS.
CONCRETE FOUNDATION
(2500 PSI Min.)
DETAIL "A" - CONCRETE FOUNDATION
FO
E
S
0 5 10
LEGEND
IRON PIN FOUND
TREE (DECIDUOUS)
SHRUB
FIRE HYDRANT
WATER METER
VALVE (GAS OR WATER)
FIBER OPTIC POLE
POWER POLE
POWER POLE w/LIGHT
GUY ANCHOR
YARD LIGHT (EXISTING)
ELECTRIC PEDESTAL
SANITARY SEWER MANHOLE (EXISTING)
STORM SEWER MANHOLE (EXISTING)
STORM SEWER INLET (EXISTING)
We hereby Certify we are the Owner of the property described on this Plan
and we hereby acknowledge the Plan made at the Developer's direction to be
filed with the City according to law.
Owner:
Date:
PRINTED NAME
NOTES:
1. The proposed project is not located in a flood plain.
2. The Effingham City Engineer (217-342-5303) or Building Official
(217-342-5300) shall be contacted 48 hours prior to construction.
3. A copy of the approved site plan and all pertinent documents
shall be readily available at the work site at all times.
4. Landscaping is required on the site along the abutting
public right-of-way.
5. All radii to be 5' to face of curb unless noted otherwise.
6. All work performed on Public R.O.W. will require a bond
from the Developer.
7. All construction shall be in accordance with the requirements
of the Americans with Disabilities Act.
8. Call J.U.L.I.E. 48 hours before construction begins.
9. For projects that require an IEPA NPDES Permit, no work shall
begin until 30 days from submittal of the NOI or receipt of the NPDES
Permit and filing of a copy with City Engineer.
10. Approval of the site plan by the City of Effingham in no way relieves
the developer's responsibility to construct the improvements in
accordance with the requirements of the Americans with Disability Act,
the Environmental Protection Act and other laws and regulations of the
City, County and/or State.
11. It is the responsibility of the developer to repair and/or replace any
roadway, sidewalks, curb & gutters and entrances damaged during the
course of the construction of the project. Such repairs of replacements
shall be in accordance with IDOT standards and shall be ADA compliant
where applicable.
12. This plan has been prepared to comply with the provisions of the NPDES
Permit Number ILR10, issued by the Illinois Enviromental Protection
Agency for storm water discharges from Construction Site Activities.
13. City Approval of a Site Plan does not "approve" encroachment on
adjacent property to construct the improvements as shown.
14. Milano & Grunloh Engineers, LLC does not bear responsibility for existing
easements, and/or property claims unless a TITLE SEARCH is provided
by the OWNER or DEVELOPER.
15. Landscape Area to include 6" of topsoil, 2" of mulch with landscape fabric
and Emerald Green Arborvitae (5' min. height) planted at 4' spacings.
Referenced to the Illinois State Plane Coordinate
System East Zone Datum of NAD83(2011) Epoch
2010.00 ORTHO HEIGHT: NAVD 88(GEOID12B)
Lee R. Beckman
My License Expires
11-30-27
P.E. No. 52890
SHEET #
2 OF 3
JOB #
25011
CP #1
BM #1
PROPOSED AMEREN POWER POLE w/TRANSFORMER
CONTRACTOR TO SUPPLY THE FOLLOWING FOR EACH
SECONDARY RUN:
10' OF 4" SCH 80 CONDUIT, 20' OF 4" SCH 40 CONDUIT,
4" LONG SWEEP 90 CONDUIT AND 4" WEATHER HEAD.
THE CONTRACTOR SHALL PROVIDE A SUFFICIENT
LENGTH OF ELECTRICAL WIRE FOR THE UTILITY COMPANY
ConcreteTO INSTALL UP THE POWER POLE.
0 5 10
FO
E
S
LEGEND
IRON PIN FOUND
TREE (DECIDUOUS)
SHRUB
FIRE HYDRANT
WATER METER
VALVE (GAS OR WATER)
FIBER OPTIC POLE
POWER POLE
POWER POLE w/LIGHT
GUY ANCHOR
YARD LIGHT (EXISTING)
ELECTRIC PEDESTAL
SANITARY SEWER MANHOLE (EXISTING)
STORM SEWER MANHOLE (EXISTING)
STORM SEWER INLET (EXISTING)
ELECTRICAL NOTES:
1. A ¾" x 10'-0" ground rod shall be embedded in the foundation at each charger station.
2. All conduits to enter and exit at the bottom of the cabinets. No side or top entrance
condiuts in NEMA 3R equipment.
3. The H-Structure to be constructed using 3" RMC conduit embedded 36" below grade.
Galvanized Caps or equivalent. Galvanized strut for mounting of equipment.
4. 4" service conduit MUST have an expansion coupling above grade and below structure
attachment point per "Ameren 2021 Service Manual - Continuous Conduit Run".
5. The Electrical Contractor must be ICC certified to receive incentives.
CP #2
4" SCH 80 PVC CONDUIT w/500 MCM CU CONDUCTORS (B, O, Y,G)
(36" Min. BURY DEPTH TO TOP OF THE CONDUIT)
Concrete
Rock
Fence
SEE ELECTRICAL NOTE 1
Inlet, T1F, OL
Top\Rim=595.51
S
Sanitary MH
Top\Rim=595.83
T
Asphalt
Exist. 1¼" PE Gas Main
E
Fiber Handhole E
Exist. 10" Watermain
FUTURE EV CHARGING STATION
BASE OF THE CHARGING STATION AND PROTECTIVE
COVER TO BE SUPPLIED BY THE CITY.
CONTRACTOR TO INSTALL.
PROPOSED EV CHARGING STATION (SEE DETAIL SHEETS)
CHARGING STATION AND BASE TO BE SUPPLIED BY THE CITY.
CONTRACTOR SHALL INSTALL MOUNTING BASE.
EQUIPMENT INSTALLATION BY OTHERS.
ELECTRIC METER H-FRAME STRUCTURE
(SEE ELECTRICAL NOTE 2, 3 & 4)
(SEE TABLE FOR EQUIPMENT LIST)
Fiber Handhole
H - FRAME STRUCTURE
EQUIPMENT MANUFACTURER
or EQUIVALENT
Milbank CT364811-HCAMS
Milbank PT48AL or PT48 AR PT Cabinet
Milbank K5930 CT Rack
Milbank 496XLWc41AMS - 20a CT
Meter Base
Square D NF NEMA 3R Panelboard (30
Space) - 3 Phase
Square D NF\EDB SE Rated 400 Amp
Main Breaker - 65kaic Rating
(2) Square D EDB 125 Amp 3-Pole
25kaic Breakers
SCHNEIDER ELECTRIC
OR EQUIVALENT
¾" CONDUIT FOR FUTURE
EV CHARGING STATION
(CAT 5E CABLE)
3" CONDUIT FOR FUTURE
EV CHARGING STATION
(DC SUPPLY)
2" CONDUIT FOR FUTURE
EV CHARGING STATION
(AC SUPPLY)
(3) 1/0 AWG, 600V CONDUCTORS
AND (1) #6 AWG, 600V GROUND,
2" CONDUIT (AC POWER SUPPLY)
SHEET #
3 OF 3
JOB #
25011
GLOBAL HEADQUARTERS
240 EAST HACIENDA AVENUE
CAMPBELL, CA 95008
TEL: +1 (408) 841-4500
CABLE REACH
12'-4"
WHEEL STOP TO
STATION FRONT
4'-6"
2'
SIDE ELEVATION | SCALE: 21" = 1'
2' - RECOMMENDED
MINIMUM DISTANCE
FOR WALK-UP ACCESS
12'-4"
2'
2' - RECOMMENDED
MINIMUM DISTANCE
FOR WALK-UP ACCESS
SIDE ELEVATION | SCALE: 21" = 1'
RECOMMENDED DISTANCE
FOR WALK-UP ACCESS: 2'
(STATION FRONT TO VEHICLE)
CABLE REACH
12' 4" FROM STATION FRONT
@ 2' ABOVE GRADE
2'
CURB
WHEEL STOP
(TYP.)
4'-6"
CPE280 STATION
CENTERED ON
PARKING SPOT
CABLE REACH
12' 4" FROM STATION FRONT
@ 2' ABOVE GRADE
CPE280 STATIONS
CENTERED ON ISLAND
ONE STATION PER SIDE
CONCEPT DRAWING
NOT FOR CONSTRUCTION
DRAWING TITLE:
CHARGEPOINT CPE280
PARKING SPACE DESIGN
RECOMMENDATIONS
BOLLARD (TYP.)
(RECOMMENDED)
EDGE OF
CONCRETE SLAB
m$/R! SITE PLAN | SCALE: 21" = 1'
1 - PULL-IN PARKING SPACES
SERVICE
CLEARANCE OF
OPEN SPACE (NOT
NECESSARILY AT
SYSTEM GRADE)
SITE PLAN | SCALE: 21" = 1'
2 - CHARGING ISLANDS
DOCUMENT #: 33128001a
DATE:
09.08.2025
DRAWN BY: CMT
SCALE:
AS NOTED
SHEET:
EV501
DEFINITIONS
x CMK = CABLE MANAGEMENT KIT
x CMT = CONCRETE MOUNTING TEMPLATE
x PM = POWER MODULE
x SCEK = SURFACE CONDUIT ENTRY KIT
x UNI = UNIVERSAL
2.5" 4.7"
21.5"
1.8"
1.8"
2.5" 4.7"
MAX CONDUIT LEGEND
AC POWER: 2"
DC PAIRED POWER: 3"
CONDUIT STUB-UP &
ANCHOR BOLT HEIGHT
COMMUNICATION: 3/4"
3"
GRADE
OPTIONAL SHUNT TRIP: 3/4"
2"
3"
3"
24"
CPE2xx UNI-CMT CONDUIT CONFIGURATION
SCALE: 1/2" = 1'
12" 6"
14.2"
10.7"
5"
12"
9"
17.9"
29.5"
CPE2xx UNI-CMT FRONT ELEVATION
SCALE: 1/2" = 1'
THE STATION CAN BE INSTALLED ON EITHER A NEWLY POURED PAD OR AN EXISTING CONCRETE SURFACE.
THE MOUNTING SURFACE MUST BE SMOOTH AND CANNOT EXCEED A SLOPE OF 0.25" PER ft (6.35mm PER 305mm).
THE CHARGEPOINT DC UNIVERSAL CONCRETE MOUNTING TEMPLATE (CMT) CORRECTLY ALIGNS ANCHOR BOLTS
AND CONDUIT OPENINGS TO ENSURE THE STATION CAN BE EASILY INSTALLED AND CONNECTED.
A CMT IS REQUIRED FOR EACH STATION INSTALLED ON A CONCRETE FOUNDATION.
IT IS CRITICAL THAT THE CONDUITS ARE POSITIONED PROPERLY AND PLUMB.
BEFORE POURING CONCRETE, THE CMT AND CONDUIT SHALL BE SECURED IN PLACE TO PREVENT THEM FROM
RISING/MOVING OUT OF POSITION WHILE THE CONCRETE IS BEING POURED.
FOR PROPER INSTALLATION ENSURE AT LEAST 3" MINIMUM OF CONDUIT AND ANCHOR BOLT IS EXPOSED ABOVE
PAD AND THE CMT 2" BELOW SURFACE.
REFER TO THE SIGHT DESIGN GUIDE AND DC UNIVERSAL CMT INSTALLATION GUIDE FOR FURTHER DETAILS.
THE CONCRETE PAD MUST EITHER BE DESIGNED TO BE SIGHT-SPECIFIC, OR MUST MEET THESE SPECIFICATIONS.
x AT LEAST 12" (305mm) DEEP (OR DEEP ENOUGH TO BE 12" (305mm) BELOW THE FROST LINE).
x AT LEAST 51" (1296mm) ON EACH SIDE.
x CONTAINS #4 REBAR OR LARGER, TOP AND BOTOM AT 12" (305mm) ON CENTER.
x CONCRETE IS 2500 PSI MINIMUM.
M16 ANCHOR BOLT
(TYPICAL)
PL CONCRETE PAD
CPE2xx UNI-CMT RIGHT ELEVATION
SCALE: 1/2" = 1'
28"
24"
(SCEK)
12"
17.4"
28.7"
46.3"
(CMK)
17.9"
34"
CPE250 OUTLINE
IN SOME EXTREME CONDITION, A LARGER PAD WOULD BE REQUIRED. FOR SITES WITH LESS STRINGENT SEISMIC,
SOIL, OR WIND CONDITIONS, A SMALLER PAD MIGHT BE POSSIBLE.
IF THE PAD DOES NOT MEET THE SPECIFICATIONS ABOVE, IT MUST BE INSPECTED AND APPROVED BY A LICENSED
STRUCTURAL ENGINEER FOR THE STATIONS DIMENSIONS AND WEIGHT.
THE PAD SPECIFICATIONS ARE DESIGNED TO MEET THESE CONDITIONS:
x 170mph WIND SPEED, CATEGORY I, EXPOSURE D
x SEISMIC IMPORTANCE FACTOR 1.0, CATEGORY E
x HAYWARD FAULT WITH MAPPED SPECTRAL RESPONSE ACCELERATIONS Ss=2.45 S1=1.019
x FOUNDATION OF SANDY SOIL WITH ALLOWABLE STRESS = 1500psf, Cd = 1.33
12"
10.7"
26.3"
50.3"
COMPONENT WEIGHTS
COMPONENT
POWER MODULE (PM)
WEIGHT
98.5lb (45kg)
CPE250 W/(2) PM's
746lb (339kg)
CPE280 W/(2) PM's
750lb (340kg)
CG HEIGHT
3.66' (1.12m)
CPE250 DETAILS
DIMENSIONS (H) 7.917' (2.413m) x (W) 1.378' (0.42m), FRONTAL AREA HEIGHT * WIDTH
46.2" 23"
(CMK)
3'-6"
UNI. CMT
28.4"
10.7"
14.1"
17.9"
2'-9"
CPE280 OUTLINE
17.26"
36.4"
24.1" (SCEK)
20.1"
11"
51.4"
67"
85"
33.5"
PM ACCESS
AREA
24"
# OF ANCHOR
BOLTS
4
BOLT
PATTERNS
SEE CMT DIMENSIONS
BOLT TYPE M16 (5/8") 9" (229mm) EMBEDMENT
CPE280 DETAILS
DIMENSIONS (H) 7.317' (2.230m) x (W) 2.33' (071m), FRONTAL AREA HEIGHT * WIDTH
# OF ANCHOR
BOLTS
4
BOLT
PATTERNS
SEE CMT DIMENSIONS
BOLT TYPE M16 (5/8") 9" (229mm) EMBEDMENT
22.8"
40.3"
(CMK)
49.2"
(TALL CMK)
84"
PM ACCESS
AREA
CPE250 CLEARANCES
FRONT
CPE250 CLEARANCES
13" (33.2mm) AT GRADE; 24" 609.6mm MINIMUM OPEN SPACE
CPE280 CLEARANCES
SCALE: 1/2" = 1'
SIDE *
28" (711.2mm) REQUIRED; 34" (863.6mm) RECOMMENDED **
SCALE: 1/2" = 1'
ÌA00010NFU4Î NOTE:
A 11"x67" MINIMUM CLEARANCE NEEDED AT GRADE TO ACCESS THE POWER MODULES. IF KICKSTAND IS NOT
LEVEL AT GRADE, THE POWER MODULES MAY FALL OUT AND CAUSE PROPERTY DAMAGE AND/OR PERSONAL
INJURY. BOLLARDS INSTALLED WITHIN THIS SERVICE CLEARANCE AREA SHALL BE REMOVABLE.
MIN. OPERATIONAL CLEARANCE AREA
SERVICE CLEARANCE AREA
THIS PUBLICATION CONTAINS VALUABLE PROPRIETARY AND CONFIDENTIAL INFORMATION OF CHARGEPOINT,
INC. ("CHARGEPOINT") WHO RETAINS ALL COPYRIGHT RIGHTS TO IT UNDER 17 U.S.C. SECTION
106 AND IS PROTECTED BY U.S. AND INTERNATIONAL LAW. ANY REPRODUCTION, PREPARATION OF
DERIVATIVE WORKS, DISTRIBUTION, PUBLIC PERFORMANCE OR DISPLAY, DISCLOSURE, AND/OR USE
OF ALL, OR ANY PORTION, OF THIS PUBLICATION IN ANY FORM OR MEDIUM WITHOUT SPECIFIC
WRITTEN AUTHORIZATION FROM CHARGEPOINT IS STRICTLY PROHIBITED.
REAR
TOP
FRONT
SIDE
TOP
REAR
W/SCEK
12" (304.8mm) REQUIRED: 24" (609.6mm) RECOMMENDED
12" (304.8mm)
CPE280 CLEARANCES
20.1" (510mm) MEASURED FROM FRONT ANCHOR BOLT
42" (1072mm) MEASURED FROM CENTER OF STATION
1" (26mm) TOP OF CMK
24.1" (663mm) MEASURED FROM FRONT ANCHOR BOLT
36.4" (925mm) MEASURED FROM FRONT ANCHOR BOLT
CLEARANCES ARE MINIMUM REQUIREMENTS FOR PROPER OPERATION AND VENTILATION PURPOSES ONLY.
FOR EASE OF ROUGH-IN INSTALLATION USE RIGHT FRONT ANCHOR BOLT FOR MEASUREMENTS.
*SIDE CLEARANCES IS MEASURED FROM EXTRUSION TO EXTRUSION.
**SIDE CLEARANCES CAN BE SHARED BETWEEN TWO CPE250 CHARGING STATIONS. HOWEVER, IF THE
CHARGE HANDLES OF BOTH STATIONS FACE EACH OTHER, ADD AN EXTRA 10" (254mm).
NOTE:
CANNOT SHARE SIDE CLEARANCE WITH CMK
A 14"x23" MINIMUM FRONT CLEARANCE NEEDED AT GRADE TO ACCESS THE POWER MODULES.
THIS PRINT IS NOT TO BE USED FOR CONSTRUCTION
UNLESS NOTED AND SIGNED OKAY FOR CONSTRUCTION
ABOVE THE LAST REVISION.
Commodity Codes
  • NAICS 541310Architectural Services
  • NAICS 541330Engineering Services
  • NAICS 541340Drafting Services
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.

Government Bids

Empower Your Bidding Strategy

Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.

  • Access an extensive database of bids, including comprehensive local and state opportunities.
  • Receive customized alerts for the bids that matter most to your business.
  • Explore detailed specifications to ensure precise and competitive submissions.
  • Gain a competitive edge with up-to-date information and exclusive opportunities.

See Also

Request for Professional Serv...

#00-0000-0226 Request for Professional Services Qualifications (QBS): Architectural and Engineering Services NEIU #00-0000-0226:

Illinois Public Higher Education

Bid Due: 7/08/2026

IT General Controls and Cyber...

Project: IT General Controls and Cybersecurity Audit RFP Ref. #: NC2615 Department: Office

City Colleges of Chicago

Bid Due: 7/17/2026