Bid No 08-25/26 Addendum No 2_Unit Price GC Services
Project Information
- Bid Title
- Bid No 08-25/26 Addendum No 2_Unit Price GC Services
- Issuing Agency
- Lake Elsinore Unified School District
- Location
- California
- Published Date
- Mar 23, 2026
- Closing Date
- Mar 31, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
- Attachment Preview
-
LAKE ELSINORE UNIFIED SCHOOL DISTRICTADDENDUM NUMBER TWOUNIT PRICE GENERAL CONTRACTOR SERVICESBID NO. 08-25/26March 23, 2026General: The following changes, additions and clarifications have been made to the original BidDocuments for the above referenced project and shall be incorporated into the Bidder’s response. Allproject documents provided with, and referenced in, the District’s Bid No. 08-25/26, including contractdocuments and specifications (collectively, the “Bid Documents”) shall remain unchanged with theexception of those elements added, revised, deleted, or clarified by this Addendum. In case of conflictbetween the Bid Documents and this Addendum, this Addendum shall govern and shall supersede anyterm in the Bid Document that contradicts or otherwise clashes with this Addendum.All bidders must acknowledge receipt of Addendum Number Two on the Bid Form and failure todo so may subject Bidder to disqualification.ANSWERS to Pre-Bid Clarifications:(4 RFI’s were received)Q: What is the payment and performance bond requirement? Will the payment and performance bondcover the master agreement or individual purchase orders over a certain threshold? Will the masteragreement be issued in the amount of $1,000,000? (JS Easterday Construction, Inc.)A: The Master Agreement shall be issued for not to exceed five million dollars ($5,000,000.00)during the first term of Bid No. 08-25/26 pursuant to Public Contracting Code section 20919.25.Bidders are not required to include Payment and Performance Bonds with their Bid Submittal.Payment and Performance Bonds will be required on each individual Project/Job Order andcorresponding Contract/Purchase Order from the Master Agreement exceeding $25,000.00.Q: Line items 31 thru 33 starting rates of $64.47-$65.96 appears to be based on basic hourly rate, notincluding fringe benefits. Shouldn't these lines include fringe benefits to match all other lines, thereforebe based off total hourly rates instead? (New Dimension General Construction, Inc.)A: Yes, the referenced prevailing wage rates for Items 31-33 are as follows:ITEM 31: OPERATING ENGINEER: BOBCAT (SKID STEER) - GROUP 3 - $99.82 - $166.29ITEM 32: OPERATING ENGINEER: SKIPLOADER - GROUP 2, 6, OR 8 - $99.53 - $169.93ITEM 33: OPERATING ENGINEER: BACK HOE - GROUP 4, 8, 10, OR 12 - $101.31 - $170.51Q: Line items 31 thru 33 (Operating Engineer) the Higher listed prevailing wage rates on this documentare the Sunday/Holiday Overtime Hourly Rate for a "Special Shift". A "Special Shift" is defined as "Aprevailing wage special shift in California refers to higher, legally mandated pay rates for working non-standard hours (e.g., evening, night, or 24-hour schedules) on public works projects". Please clarify whichSunday/Holiday Overtime Hourly Rate should be used.? (New Dimension General Construction, Inc.)A: The range of prevailing wage rates are included as a reference. The District is requestingStandard Hourly Rates, Standard Overtime/Saturday Rates & Standard Holiday/Sunday Rates.1Q: Line items 32 and 33 (Operating Engineer) have 3 different group number listed. Each group numberhas a different prevailing wage rate. Please clarify if each group should get its own hourly rate, or if only1 group rate is to be chosen for pricing. (New Dimension General Construction, Inc.)A: The District is requesting a single rate per shift for Item 32 (Operating Engineer-Skiploader) &Item 33 (Operating Engineer - Back Hoe). The various groups are included as a reference. Theactual size of the required equipment to complete a future project is unknown.Attachments: (4) Pre-Bid Clarification Forms, Exhibit A - Revised (3 pages)Except as specifically addressed herein, all other original provisions of Bid Documents issuedprior to this Addendum shall remain in effect as written. Addendum No. 02, taken together withAddendum No. 01 and the Bid Documents, represents the entire Bid Package associated with thisBid. The District, at its sole discretion, may issue additional addenda as necessary.END OF ADDENDUM NUMBER TWO2PRE-BID CLARIFICATION FORM (For Contractor’s Use)PROJECT NAME:PROJECT NUMBER:TO:Unit Price General Contractor Services08-25/26Ricardo FelixLacy Jane VanderboomEMAIL:DATE:0DUFKRicardo.Felix@leusd.k12.ca.usLacy.Vanderboom@leusd.k12.ca.us-6(DVWHUGD\&RQVWUXFWLRQ,QFFROM:DOCUMENT/DIVISIONNUMBER:EMAIL:DRAWINGNUMBER:HDVWFR#VEFJOREDOQHW1$REQUESTED CLARIFICATION: BOND REQUIREMENTS:KDWLVWKHSD\PHQWDQGSHUIRUPDQFHERQGUHTXLUHPHQW":LOOWKHSD\PHQWDQGSHUIRUPDQFHERQGFRYHUWKHPDVWHUDJUHHPHQWRULQGLYLGXDOSXUFKDVHRUGHUVRYHUDFHUWDLQWKUHVKROG":LOOWKHPDVWHUDJUHHPHQWEHLVVXHGLQWKHDPRXQWRI"RESPONSE TO CLARIFICATION:The Master Agreement shall be issued for not to exceed five million dollars ($5,000,000.00)during the first term of Bid No. 08-25/26 pursuant to Public Contracting Code section 20919.25.Bidders are not required to include Payment and Performance Bonds with their Bid Submittal.Payment and Performance Bonds will be required on each individual Project/Job Order andcorresponding Contract/Purchase Order from the Master Agreement exceeding $25,000.00.Attach additional numbered sheets as necessary; however, only one (1) request shall be contained on eachsubmitted form.Unit Price General Contractor Services, Bid No. 08-25/26Lake Elsinore Unified School DistrictPre-Bid ClarificationPage 15PRE-BID CLARIFICATION FORM (For Contractor’s Use)PROJECT NAME:PROJECT NUMBER:TO:Unit Price General Contractor Services08-25/26Ricardo FelixLacy Jane VanderboomEMAIL:Ricardo.Felix@leusd.k12.ca.usLacy.Vanderboom@leusd.k12.ca.usDATE: March 20, 2026New Dimension General Construction,Inc.ddahlberg@newdimension.bizFROM:DOCUMENT/DIVISIONNUMBER:General Contractor Services Unit Prices DocumentEMAIL:DRAWINGNUMBER:REQUESTED CLARIFICATION:Line items 31 thru 33 starting rates of $64.47-$65.96 appears to be based on basic hourly rate,not including fringe benefits. Shouldn't these lines include fringe benefits to match all otherlines, therefore be based off total hourly rates instead? See below:RESPONSE TO CLARIFICATION:Yes, the referenced prevailing wage rates for Items 31-33 are as follows:ITEM 31: OPERATING ENGINEER: BOBCAT (SKID STEER) - GROUP 3 - $99.82 - $166.29ITEM 32: OPERATING ENGINEER: SKIPLOADER - GROUP 2, 6, OR 8 - $99.53 - $169.93ITEM 33: OPERATING ENGINEER: BACK HOE - GROUP 4, 8, 10, OR 12 - $101.31 - $170.51Attach additional numbered sheets as necessary; however, only one (1) request shall be contained on eachsubmitted form.Unit Price General Contractor Services, Bid No. 08-25/26Lake Elsinore Unified School DistrictPre-Bid ClarificationPage 15PRE-BID CLARIFICATION FORM (For Contractor’s Use)PROJECT NAME:PROJECT NUMBER:TO:Unit Price General Contractor Services08-25/26Ricardo FelixLacy Jane VanderboomEMAIL:Ricardo.Felix@leusd.k12.ca.usLacy.Vanderboom@leusd.k12.ca.usDATE:FROM:DOCUMENT/DIVISIONNUMBER:REQUESTED CLARIFICATION:EMAIL:DRAWINGNUMBER:RESPONSE TO CLARIFICATION:Attach additional numbered sheets as necessary; however, only one (1) request shall be contained on eachsubmitted form.Unit Price General Contractor Services, Bid No. 08-25/26Lake Elsinore Unified School DistrictPre-Bid ClarificationPage 15
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Follow Ice and Reefer Rental Active Contract Opportunity Notice ID W912LA26QA018 Related Notice
DEPT OF DEFENSE
Bid Due: 7/06/2026
RFQ - AS-NEEDED VECTOLEX AND ...
RFx Name: BPM013241 RFx Begin Date (UTC+0): RFQ - AS-NEEDED VECTOLEX AND VECTOPRIME
San Diego County
Bid Due: 7/22/2026