RFQ for Design Services for Plaza at 501
Project Information
- Bid Title
- RFQ for Design Services for Plaza at 501
- Issuing Agency
- City of Ferguson
- Location
- Missouri
- Published Date
- Mar 20, 2026
- Closing Date
- Apr 17, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Title: RFQ for Design Services for Plaza at 501
Category: Parks & Recreation Equipment and Services Status: Open Description: The City of Ferguson (population 18,527) is soliciting qualifications from experienced and qualified firms to provide professional planning, engineering, and design services for the phased re-development of Plaza at 501 located at 501 S. Florissant Rd. The selected firm will be responsible for developing a detailed, phased implementation plan and preparing construction documents for Phase I of the project. The total project budget has not yet been established.
The purpose of the redevelopment plan is to provide a multi-phase guide for the Parks Capital Improvement Plan to renovate the current Plaza at 501 facility (located at 501 S. Florissant Rd.) as well as expand the park onto additional property once obtained (see Appendix #1). Amenities are expected to include a large pavilion that can be used for the Ferguson Farmers Market and large community events, a plaza area with stage, restrooms, an inclusive playground, sport courts, parking areas, and other amenities that the community feels would allow Plaza @ 501 to become a destination park for the surrounding communities.
See attachment for details.
Publication Date/Time: 3/20/2026 11:00 AM Closing Date/Time: 4/17/2026 11:00 AM Submittal Information: 1050 Smith Ave, Ferguson, MO 63135 Related Documents: - Attachment Preview
-
City of Ferguson, MissouriParks & RecreationRequest for QualificationsForDesign ServicesFor Plaza at 501March 20th, 2026Submission Deadline: April 17th, 2026 at 11amProject OverviewThe City of Ferguson (population 18,527) is soliciting qualifications from experienced andqualified firms to provide professional planning, engineering, and design services for the phasedre-development of Plaza at 501 located at 501 S. Florissant Rd. The selected firm will beresponsible for developing a detailed, phased implementation plan and preparing constructiondocuments for Phase I of the project. The total project budget has not yet been established.The purpose of the redevelopment plan is to provide a multi-phase guide for the Parks CapitalImprovement Plan to renovate the current Plaza at 501 facility (located at 501 S. Florissant Rd.)as well as expand the park onto additional property once obtained (see Appendix #1). Amenitiesare expected to include a large pavilion that can be used for the Ferguson Farmers Market andlarge community events, a plaza area with stage, restrooms, an inclusive playground, sportcourts, parking areas, and other amenities that the community feels would allow Plaza @ 501 tobecome a destination park for the surrounding communities.Scope of ServicesThe selected firm will be responsible for developing a comprehensive, phasedimplementation plan along with design, engineering, and construction services related to theredevelopment, renovation, and improvements of Plaza at 501. The Scope of Services shallinclude, but is not limited to, the following tasks.A) Site Assessment and Analysis1. Conduct a thorough evaluation of the existing site conditions including topography,vegetation, infrastructure, and environmental considerations.2. Identify opportunities and constraints that may influence phased development.B) Design Plan and Phased Implementation Plan Development1. Develop a phased plan for the park’s redevelopment that addresses site preparation, utilitycoordination and alignment, stormwater management improvements, bioretention systeminstallation, structural engineering, roadway and parking design, and the construction andinstallation of site/park amenities.2. The final design/layout of the park, including new amenities and features, will be finalizedthrough this process. Elements and amenities currently in consideration can be found inAppendix #2 & #3.3. Establish clear priorities and sequencing for each phase.4. Provide preliminary cost estimates for each phase to assist with future budgeting.C) Site Preparation Plan1. Outline grading, clearing, demolition, drainage, and erosion control measures.D) Utility Coordination1. Identify existing utility infrastructure and coordinate with applicable utility providers todetermine necessary upgrades, relocations, or extensions.2. Ensure utility alignment is compatible with planned park improvements.City of Ferguson | Design Services RFQ for Plaza at 501 | Page 2E) Stormwater Management and Bioretention Design1. Assess current stormwater management needs and propose environmentally responsibleimprovements that comply with all relevant local, state and federal regulations.2. Incorporate bioretention and other BMPs as needed and required by coordination withMSD. Designs should consider aligning with the city’s sustainability goals and provideaesthetic and educational benefits.F) Construction Documents1. Develop complete construction drawings, technical specifications, and bid-readydocuments for the first phase of implementation.2. Coordinate with the city throughout the design process to ensure compliance with localstandards and the city’s goals for the park.3. Attend a kickoff meeting to confirm the design program for the project and set the projectschedule, submittal milestones, and construction budget requirements.4. Prepare and submit an initial set of Construction Documents for City review. This submittalshall be developed to a level sufficient for a detailed technical review of all major sitecomponents, grading, and utility connections.5. Provide an updated Estimate of Probable Cost accompanying the intermediate progresssubmittal6. Participate in a formal review meeting with City staff to discuss comments and requestedadjustments following the progress submittal.7. Firm will coordinate with the necessary utility agencies/companies; coordination willinclude submitting plans to each organization and receiving review comments. Reviewagencies anticipated to require coordination include MSD, Ameren UE and the City ofFerguson Planning and Development Department.8. Incorporate all revisions and adjustments resulting from the agency and City reviewprocess to produce a sealed, final (100% level) set of construction drawings andspecifications suitable for public bidding.9. Prepare an estimate of probably cost for the final (100% level) construction drawingpackage.G) Bidding1. Assist the City in preparation of the front end and contract bid procedure documents forthe project and submit to the City for bidding.2. Coordinate with the City the bid dates; pre-bid conference; and bid evaluation. Attend pre-bid conference.3. Answer questions during the bid period and assist the City in evaluating bids received.Provide City recommendations on the bids received.4. Evaluate low bidder contractor and sub-contractors.H) Construction Period Services1. General Administration• Firm shall be a representative of and shall advise and consult with the City during theprovision of the Construction Period Services.• Firm shall review properly prepared, timely Request for Information (RFI) by thegeneral contractor for additional information about the construction documents.• If deemed appropriate, Firm shall on the City’s behalf, prepare, reproduce anddistribute supplemental Drawings and Specifications in response to requests forinformation by the general contractor.• Firm shall provide the services of a full-time construction inspection person to giveCity of Ferguson | Design Services RFQ for Plaza at 501 | Page 3instruction to the general contractor(s) during the construction period.2. Evaluation of the Work• Firm representatives shall visit the site at intervals appropriate to the stage ofconstruction operations to:1. Become generally familiar with and to keep the City informed about the progressand quality of the portion of the work completed.2. Endeavor to guard the City against defects and deficiencies in the work.3. Determine in general if the work is being performed in a manner indicating that thework, when fully completed, will be in accordance with the constructiondocuments.• Firm shall report to the City known deviations from the construction documents andfrom the most recent construction schedule submitted.• Firm shall at all times have access to work wherever it is in preparation or progress.• Firm shall have authority to reject work that does not conform to the constructiondocuments.3. Submittals• Firm shall review and take appropriate action upon the general contractor’s submittalsof Shop Drawings, Product Data and Samples, for the purpose of checking forconformance with information given and the design concept expressed in theconstruction documents.• Firm shall act with reasonable promptness as to cause no delay in the work or in theactivities of the City, general contractor or separate subcontractors while allowingsufficient time in Firm’s professional judgement to permit adequate review.• If professional design services or certifications by a design professional related tosystems, materials or equipment are specifically required of the general contractor bythe Contract Documents, Firm shall specify appropriate performance and designcriteria that such service must satisfy.4. Project Completion• Firm shall conduct periodic inspections to assist the City in determining the date ordates of Substantial Completion and the date of final completion.• Firm shall assist the City in requiring the general contractor to forward to the City, forthe City’s review and records, written warranties and related documents required bythe construction documents.• Firm shall review a final Certificate for Payment based upon a final inspectionindicating the work complies with the requirements of the construction documents.ProposalsResponses to this RFQ should be specific and precise with adequate detail to accurately defineyour qualifications for performing the services required. Limit your responses to theinformation requested in each section. Any additional information that you wish to submitshould be included in a separate section marked “Supplemental Information.” Firms interestedin submitting a proposal shall submit the following:● Letter of Intent● Provide a brief history and general overview of the company including headquarters andlocation from which project will be managed.● Team Overview• Identify the project’s key contact person.City of Ferguson | Design Services RFQ for Plaza at 501 | Page 4• Identify key personnel who will be assigned to the project, including their roles,qualifications, and relevant experience.• List any and all subconsultants and their roles.● Approach to the Project• Describe the firm’s planning methodology and your approach to the project.• Outline your process for ensuring cost-effective design, regulatory compliance,and sustainability.• Highlight any innovative design or engineering solutions you have successfullyimplemented in past projects that could benefit this park.● Relevant Experience• Provide descriptions of at least three (3) but no more than five (5)similar projects completed within the last 10 years. For each project,include:• Project name, location, and completion date• Brief description of scope and relevance to the Plaza at 501project.• Client name and contact information (for reference purposes)• Key team members involved and their roles (highlight if theyare proposed for this project)• Project Cost● Local Knowledge and Capacity• Demonstrate your team’s familiarity with Ferguson and the St. Louisarea, including local regulations, environmental conditions, andcommunity dynamics.● Proposed timeline● Any other information you would like to submit that you feel will assist us in theevaluation of your firm’s qualifications.Selection CriteriaThe procurement process for these services will be based upon a Qualifications BasedSelection (QBS) process. The award of a contract will be made to the firm offering a response thatthe City believes best meets its needs. Each respondent will be evaluated on the basis of thefollowing criteria:A) Qualifications and experience of the firm.B) Experience on municipal projects of similar size and complexityC) The firms understanding of the project requirements and the City of Ferguson’sobjectives.D) The firm’s proximity to and familiarity with the area in which the project islocated.If necessary, a short list of firms may be selected for follow-up interviews.The City of Ferguson reserves the right to accept proposals in whole or part, and to reject any andall proposals, and to negotiate separately as necessary to serve the best interests of the City ofFerguson.City of Ferguson | Design Services RFQ for Plaza at 501 | Page 5
- Commodity Codes
-
- NAICS 541310Architectural Services
- NAICS 541330Engineering Services
- NAICS 541511Custom Computer Programming Services
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
26-088 RFQ Design Services - ...
Bid Number: 26-088 Bid Title: 26-088 RFQ Design Services - Henges Wetland Park
St. Charles County
Bid Due: 7/15/2026
RFQ 2026-011 2026-2028 Profes...
RFQ 2026-011 2026-2028 Professional Services Consultant Roster Closes: June 30, 2028 5:00 pm
City of Sedalia
Bid Due: 6/30/2028