DEMOLITION OF 1110 WEST SOUTH BOULEVARD
Project Information
- Bid Title
- DEMOLITION OF 1110 WEST SOUTH BOULEVARD
- Issuing Agency
- City of Montgomery
- Location
- Alabama
- Published Date
- Jan 18, 2026
- Closing Date
- Feb 19, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Project ID:
Title: DEMOLITION OF 1110 WEST SOUTH BOULEVARD
Addenda: 0
Release Date: 1/16/2026
Due Date: 2/19/2026
DEMOLITION OF 1110 WEST SOUTH BOULEVARDFollowProcurementProject ID: RAA PROJECT #25-009Release Date: Friday, January 16, 2026ยท Due Date: Thursday, February 19, 2026 10:00amPosted Friday, January 16, 2026 2:55pmAll dates & times in Central TimeDraft Response Events RSVP No Bid31 days, 14 hours, 32 minutesOverview
Post Information
Posted At:Fri, Jan 16, 2026 2:55 PM
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
SummaryThe work consists of the complete demolition and removal of the existing building and all associated site improvements at 1110 West South Boulevard down to the building pad, including but not limited to roofs, canopies, walls, windows, doors, floors, and foundations. All interior components such as ceilings, baseboards, flooring, doors, frames, hardware, and windows shall be removed, along with all plumbing, mechanical, HVAC, sprinkler, and electrical systems, including piping, ductwork, controls, and associated equipment. Utility lines for water, sewer, gas, and fire protection shall be properly disconnected and capped beyond the building pad as indicated in the contract documents. The existing pool shall be filled, compacted to 98% density, and graded to match surrounding terrain for mowing. Remaining site elements designated to stay, including existing fencing, curbs, sidewalks, and drives, shall be protected throughout construction. Temporary erosion and sediment control measures shall be installed and maintained in accordance with Alabama Department of Transportation Standard Specifications Section 665. All work must comply with applicable federal, state, and local codes, and the contractor shall obtain required permits, coordinate with utility companies for service disconnections, and legally dispose of all demolition debris off-site at an approved facility. Hazardous materials, if present, shall be handled per regulatory requirements, including EPA Section 608 refrigerant recovery, and asbestos or lead-containing materials must be removed and disposed of in accordance with environmental regulations.
Timeline
Release Project Date:January 16, 2026Pre-Proposal Meeting (Mandatory):February 12, 2026, 10:00am1110 West South Boulevard, Montgomery, AL 36105Question Submission Deadline:February 13, 2026, 10:00amQuestion Response Deadline:February 16, 2026, 10:00amResponse Submission Deadline:February 19, 2026, 10:00am - Commodity Codes
-
- NAICS 238910Site Preparation Contractors
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.