RFP ? Construction Services ? Fire Station 1 Addition ? Addendum 1
Project Information
- Bid Title
- RFP ? Construction Services ? Fire Station 1 Addition ? Addendum 1
- Issuing Agency
- Crossville city
- Location
- Tennessee
- Published Date
- Apr 17, 2026
- Closing Date
- Apr 23, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
RFP – Construction Services – Fire Station 1 Addition – Addendum 1
- Attachment Preview
-
ADDENDUM NO. 1REQUEST FOR PROPOSALSFORCONSTRUCTION SERVICESFire Station 1 Addition141 Henry StreetFrom: City of Crossville – Engineering DepartmentDate: 4/17/2026Project No. 10136Re: Addendum No. 1 - FinalThe City of Crossville is requesting proposals for Construction Services forthe design and construction of an Addition to Fire Station 1 at 141 HenryStreet in Crossville, TN. Proposals will be received by the City of Crossvilleat 392 North Main St., Crossville, Tn 38555 at the office of City Clerk until2:00 o'clock P.M., C.D.T., April 23, 2026. All proposals should be properlymarked CITY CLERK/RFP and “RFP – Construction Services –FireStation 1 Addition” on the outside of a sealed envelope. No electronicsubmissions accepted.The Addendum consists of six typed sheets and two attachments.Attachment 1 – Sign In Sheet for Pre-Proposal MeetingAttachment 2 – Agenda for Pre-Proposal MeetingINFORMATION FOR PROPOSERSRFP – Fire Station 1 AdditionQuestions and Answers:04/17/20261. Can Smith and/or ACO Drains be a substitution for Zurn? (MeetingEquivalent Specs.)Substitutions will be allowed if they are equivalent specifications orapproved equal.12. On A-1.0, the wall legend is described as:A) (This wall is around the equipment room) INTERIOR WALL - 6"METAL STUD WALL w/STUDS SPACED @ 16" O.C. w/ (1) LAYER5/8" PLYWOOD EACH SIDE & METAL LINER PANELSB) (This wall is separating the bays.) INTERIOR WALL - METALWALL GIRTS w/METAL LINER PANELS EACH SIDE - EXTEND TOROOF DECKThe question is, on the city's drawings, they call out a 3-hr fire wall atthese places; however, these specs do not align with a 3-hr firewall.Can you advise?Similar Question from another ContractorI wanted to ask you about a conflict I noticed between drawingConcept floor plan and A-1 by Bouton. The equipment and mechroom show either a 3-hr. rated wall on Concept floor plan and on A-1they show a 6” interior stud wall with plywood and metal liner. Whatplan shall we price are walls by?Proposal to be based upon the Concept Plans. The 3-hour Fire BarrierWalls for the Equipment Room is a City of Crossville CodesDepartment Requirement, and is shown on the Concept Plans.Note that the Equipment Room walls are to be a 3-hour Fire BarrierWall and not a 3-hour Fire Wall except for the wall next to theInterconnecting Hallway. It is to be a 3-hour Fire Wall.Contractor/Designer has the option to choose the type of constructionto meet a 3-hour fire barrier wall assembly and it’s UL rating.23. What is the difference between Fire Wall and Fire Barrier Wall?Fire Walls – are walls that extends continuously from the base of thebuilding all the way to the roof. They are designed to remain standingeven if the adjacent structure collapses. To do so, firewalls are builtthicker than normal walls with significant structural stability under fireconditions.Fire Barriers – are interior walls that extend from the floor-to-floor orfloor-to-roof. They are designed to sub-divide portions of the building,and can be supported by structures, such as roofs, columns or floors.All support structures should have a fire-resistant rating no less thanthat of the fire barrier they support.4. What is the firewall UL rating for the horizontal ceiling?Contractor/Designer has the option to choose the type of constructionto meet the 3- hour horizontal assembly for the ceiling and it’s ULrating. Contractor/Designer also has the option to extend the 3-hourfire barrier walls up to the bottom of roof sheathing and eliminate the3-hour horizontal assembly above the Equipment Room.5. Garage Door(s):Should we proceed with insulated or non-insulated glass?1/2" Insulated Tempered GlassIs Low-E glass required?No, the Glazing and the overhead door to have a U factor = 0.45Do the 521 series doors require insulated stiles and rails?YesShould the doors be non-wind loaded or wind loaded?Wind loaded3Are standard 10,000-cycle springs sufficient, or is a higher cyclerating needed?25,000 Cycle6. Is an Oil and Grease separator required for the trench drains insidethe building?No, this is a parking garage for trucks and equipment, and not garagefor working on trucks and equipment.7. I just wanted to verify that the telephone pole and light poles will behandled by the city being it is a part of the demo. Just let me know ifthere is anything on our end we should be including in your bid.It will be part of the city’s demo.8. Does the demo include demo & removal of asphalt?Yes, the city will be responsible for demo of the asphalt.9. Is a field office mandatory?No10. Can you clarify exactly what a 1 hour fire barrier is?IBC Section 706.5 required a 1-hour fire resistance rating for 4 feetat exterior corners where a fire wall intersects an exterior wall. A 1-hourfire-resistance-rated assembly is a building component (wall, floor, orceiling) designed to withstand fire for one hour. Common assembliesinclude 5/8" Type X gypsum board on wood/steel studs or specializedexterior panels, ensuring structural integrity and fire containment.Contractor/Designer has the option to choose the type of constructionto meet the 1- hour fire resistance rating and it’s UL rating.411. Specs call for 30-year minimum warranty on the building metal..isthat a finish (paint) warranty or a weathertightness warranty?Minimum 30- year warranty on Paint and a minimum 20 year onWatertighness on the roof panels.12. Standing Seam Roof profileStanding Seam Roof to match as close as possible the existingstanding seam roof profile and color.13. Proposed BrickThe proposed Brick on the addition to match as close as possible tothe existing brick on the building.14. Site WorkContractor responsible for site grading, erosion control, filling and sitestabilization of the project site after the demo by the city.15. Do you have any specific products you would like to use fromTNEMEC for the epoxy and urethane?Find specs for Epoxy/Urethane -1. Surface Preparation: Shot blast or mechanically abrade surfaceto remove existing coating other contaminants and to provide aprofile in accordance with ICRI Standard CSP 3 minimum.2. Repairs: Fill spalls, areas that need repair and non-movingjoints and cracks with Tnemec 215 Surfacing Epoxy or 237Power-Tread/fumed silica/aggregate blend.3. Primer: Tnemec 237 Power-Tread 8.0 to 10.0 Mils DFT.4. Intermediate Coat: Tnemec 237-Color Power-Tread 6.0 to 8.0Mils DFT.5
- Commodity Codes
-
- NAICS 236220Commercial and Institutional Building Construction
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
PSXE242022 Repair Facility Ex...
Follow PSXE242022 Repair Facility Exterior Lighting Active Contract Opportunity Notice ID W50S98-26-B-A005 Related
DEPT OF DEFENSE
Sparta Readiness Center Re-Ro...
Project: Sparta Readiness Center Re-Roof and Facility Update Sparta Readiness Center Sparta, White
State Government of Tennessee
Bid Due: 7/23/2026