RFQ for Highway 36 and CSAH 17 Tree Clearing
Project Information
- Bid Title
- RFQ for Highway 36 and CSAH 17 Tree Clearing
- Issuing Agency
- Washington County
- Location
- Minnesota
- Published Date
- Feb 20, 2026
- Closing Date
- Mar 13, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Bid Title: RFQ for Highway 36 and CSAH 17 Tree Clearing
Category: Washington County Public Works Status: Open Description: The purpose of this Request for Quotes (RFQ) is for Washington County to secure services for tree removals for the CSAH 17 (Lake Elmo Ave.) and TH 36 Interchange Project.
Publication Date/Time: 2/20/2026 12:00 AM Closing Date/Time: 3/13/2026 3:00 PM Contact Person: Andrew Giesen, Washington County Public Works Project Manager
andrew.giesen@washingtoncountymn.gov.Related Documents: - Attachment Preview
-
Request for Quotes (RFQ) forTree RemovalsRFQ release date: 2/20/2026Submission due date: 3/13/2026North Shop | 11660 Myeron Road North | Stillwater, MN 55082-9537P: 651-430-4300 | F: 651-430-4350 | TTY: 651-430-6246www.washingtoncountymn.govWashington County is an equal opportunity organization and employerTree Removals for CSAH 17 & TH 36 ConstructionTable of Contents1. Introduction ....................................................................................................................................................... 31.1. County Authorized Representative............................................................................................................ 31.2. Schedule..................................................................................................................................................... 32. Scope of Work .................................................................................................................................................... 32.1. Governing Specifications............................................................................................................................ 32.2. Labor Provisions ......................................................................................................................................... 32.3. Attachments............................................................................................................................................... 33. Quote Content ................................................................................................................................................... 33.1. Cover Letter ............................................................................................................................................... 43.2. Responsible Contractor Form .................................................................................................................... 43.3. Cost ............................................................................................................................................................ 43.4. Appendix A – County’s Standard Terms and Conditions ........................................................................... 43.5. Conflict of Interest ..................................................................................................................................... 44. Quote Submittal ................................................................................................................................................. 45. Quote Evaluation and Selection......................................................................................................................... 45.1. Evaluation Committee ............................................................................................................................... 45.2. Evaluation Criteria...................................................................................................................................... 55.3. Final Selection ............................................................................................................................................ 55.4. Conditions of this RFQ ............................................................................................................................... 56. Questions ........................................................................................................................................................... 5Attachment A: Location MapAttachment B: Plan SheetsAttachment C: Division SAttachment D: Responsible Contractor FormAttachment E: Quote Submittal FormAttachment F: State Funded Contracts Special Provisions Division AAttachment G: State Wage RatesPage |2Tree Removals for CSAH 17 & TH 36 Construction1. IntroductionThe purpose of this Request for Quotes (RFQ) is for Washington County to secure services for tree removalsfor the CSAH 17 (Lake Elmo Ave.) and TH 36 Interchange Project, see Attachment B for specific site plans.1.1. County Authorized RepresentativeThe County Authorized Representative for this RFQ is Andrew Giesen, Washington County Public WorksProject Manager, andrew.giesen@washingtoncountymn.gov, 651-430-4336.1.2. ScheduleRFQ Release DateQuestions DueQuotes DueScheduleDue Date2/20/20263/4/20263/13/20262. Scope of WorkThis work shall consist of providing all material, equipment, labor, and cleanup to complete the workidentified per the following: The Contractor shall keep roadways, driveways, and any infrastructure clear ofdebris by utilizing a street sweeper and any other equipment necessary, as deemed necessary by theengineer. This work shall be incidental to the project.2.1. Governing SpecificationsThe 2025 Edition of the Minnesota Department of Transportation “Standard Specifications for Construction”shall govern.2.2. Labor ProvisionsThe State of Minnesota Department of Transportation “State Funded Contracts Special Provisions DivisionA”, shall apply on this Contract except as stated otherwise in the Special Provisions.2.3. Attachments• Attachment A: Location Map• Attachment B: Plan Sheets• Attachment C: Division S• Attachment D: Responsible Contractor Form• Attachment E: Quote Submittal Form• Attachment F: State Funded Contracts Special Provisions Division A• Attachment G: State Wage Rates3. Quote ContentThe following will be considered minimum contents of the quote and must be submitted:Page |3Tree Removals for CSAH 17 & TH 36 Construction3.1. Cover LetterIntroduce the Contractor submitting the quote and state the Contractor’s understanding of the services.Include name, address, telephone number, and email address of the contact person(s), as well as the namesof any others participating in the quote.3.2. Responsible Contractor FormComplete the attached Responsible Contractor Form (Attachment D, D1, and D2)3.3. CostComplete the attached quote submittal form (Attachment E) that is signed by an officer of the Companywho can be accountable for all representatives.3.4. Appendix A – County’s Standard Terms and ConditionsSubmit a signed Appendix A as the Contractor to whom the contract is awarded shall be required to complywith the terms and conditions contained therein.3.5. Conflict of InterestThe Contractor must identify any potential conflict of interest it may have with the County or any otherparty or entity that may be affected by the terms of this RFQ and responsive quotes. The Contractor agreesthat, should any conflict or potential conflict of interest become known, it will immediately notify theCounty of the conflict or potential conflict, and will advise the County whether it will or will not resign fromthe other engagement or representation. Unless waived by the County, a conflict or potential conflict may,in the County's discretion, require withdrawal or rejection of the Contractor’s quote.4. Quote SubmittalAll quotes must include Quote Content set forth in Section 3 and be sent electronically to the CountyAuthorized Representative: Andrew Giesen, Washington County Public Works Project Manager,andrew.giesen@washingtoncountymn.gov by 3:00pm on March 13, 2026. Late submittals will not beconsidered.All quotes, once submitted, become the property of the County. They will not be returned to the Contractor.Submission of a quote indicates acceptance by the Contractor of the conditions contained in this RFQ unlessclearly and specifically noted in the quote submitted and confirmed in the contract between the County andthe selected Contractor.5. Quote Evaluation and SelectionThe County will evaluate the information the Contractor provides and determine which quotes comply withall mandatory submission requirements. Non-compliant quotes will, subject to the express and impliedrights of the County, be disqualified and not evaluated further.5.1. Evaluation CommitteeThe evaluation committee consists of representatives of Washington County.Page |4Tree Removals for CSAH 17 & TH 36 Construction5.2. Evaluation CriteriaThe evaluation criteria includes a pass/fail review to determine if the Contractor is compliant with allrequirements of the RFQ. Passing quotes will then be evaluated on cost.5.3. Final SelectionThe lowest responsive and responsible Contractor will be selected. It is anticipated but not guaranteed thatthe selection of a Contractor will be completed by March 17, 2026. Following notification of the selectedContractor, it is expected a contract will be executed between both parties by March 27, 2026.5.4. Conditions of this RFQ• This RFQ process does not obligate the County to award a contract or complete the services.• The County reserves the right to waive any minor irregularities.• The County reserves the right to reject any or all quotes.• The County reserves the right to request additional information or clarifications from Contractors.• The County reserves the right to interview any, all, or none of the Contractors.• The County reserves the right to enter into a contract with more than one Contractor.• If the RFQ process concludes by withdrawal, cancellation or rejection of all quotes, the Countyreserves the right to issue another RFQ for this service.• The County shall not be liable for any expenses incurred by the Contractor including but not limitedto expenses associated with the preparation and submission of the quote.• Quotes submitted become a matter of public record. All data collected, created, received,maintained, or disseminated for any purposes by the activities of the Contractor because of this RFQis governed by the Minnesota Government Data Practices Act, Minnesota Statutes Chapter 13, asamended, the Minnesota Rules implementing such Act now in force or as adopted, as well asFederal Regulations on data privacy.6. QuestionsTo notify the County of any inconsistency or ambiguity in this RFQ and for all questions pertaining to thisRFQ, all questions and notifications must be sent via e-mail by 3:00pm on March 4, 2026 to the CountyAuthorized Representative: Andrew Giesen, Washington County Public Works Project Manager,andrew.giesen@washingtoncountymn.gov.Only written questions and notifications will receive responses. Washington County reserves the right todisregard questions received after the above deadline. If necessary, an addendum will be issued through thesame communication medium as this RFQ was originally distributed.Page |5
- Commodity Codes
-
- NAICS 237310Highway, Street, and Bridge Construction
- NAICS 238910Site Preparation Contractors
- NAICS 561730Landscaping Services
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Elm Creek Valley Phase 1 - St...
Post Date 06/18/2026 Quest Number 10241333 Category Code Crushed Stone/Rip Rap,Erosion Control/Slope, Bank
WSB
Bid Due: 7/10/2026
Chippewa National Forest, Bla...
Follow Chippewa National Forest, Blackduck Ranger District, Everton Creek Timber Sale Preparation Active
AGRICULTURE, DEPARTMENT OF
Bid Due: 7/16/2026