NCDOT Hatteras/Ocracoke Passenger Ferry Dock Replacements in Dare and Hyde Counties
Project Information
- Bid Title
- NCDOT Hatteras/Ocracoke Passenger Ferry Dock Replacements in Dare and Hyde Counties
- Issuing Agency
- Division of Highways
- Location
- North Carolina
- Published Date
- Apr 9, 2026
- Closing Date
- Apr 15, 2026
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
DA00645POCNCDOT Hatteras/Ocracoke Passenger Ferry Dock Replacements in Dare and Hyde Counties
- Attachment Preview
-
JOSH STEINGOVERNORApril 9, 2026STATE OF NORTH CAROLINADEPARTMENT OF TRANSPORTATIONDANIEL H. JOHNSONSECRETARYAddendum No. 1Contract No.: DA00645TIP #: FF-0001AWBS Element: 50801.3.2, 16.71001NCDOT Hatteras/Ocracoke Passenger Ferry Dock Replacements in Dare and Hyde CountiesTo Whom It May Concern:Reference is made to the proposal and plans previously furnished for this project.The following revisions have been made to the proposal and plans:Proposal Page No. 3, “Table of Contents” has been revised to include the new special provision for “TransportationWorker Identification Credentials (TWIC)” Card. Please replace the original proposal page No. 3 “Table ofContents” with the attached revised page No. 3 “Table of Contents”.Proposal Page No. G-37 has been revised to include a new special provision for “Transportation WorkerIdentification Credentials (TWIC) Card”. Please replace the original proposal Page G-37 with the attached revisedPage G-37.In response to questions submitted during the advertisement phase, and to ensure consistent information for allparties, we have listed the inquiries and answers below.Questions from the Pre-Bid meeting:1) Is it a requirement for the Contractor to dewater the Poseidon floating barges; if so, when?Answer: Contractor will be required to inspect and dewater the floating barges prior to relocating to theShipyard.2) The hatches on the existing floating docks are not operable. What options exist for dewatering?Answer: Contractor may propose a method to be approved by Ferry Division prior to implementation.Options include drilling a hole and draining with a hose, forcing hatches open by introducing greatertorque, etc.Mailing Address:NC DEPARTMENT OF TRANSPORTATIONDIVISION ONE113 AIRPORT DRIVE, SUITE 100EDENTON, NC 27932Telephone: (252) 482-1850Fax: (252) 482-8722Customer Service: 1-877-368-4968Website: www.ncdot.govLocation:113 AIRPORT DRIVE, SUITE 100EDENTON, NC 27932DA00645 Addendum #13) How are the floating barges to be relocated to the Mann’s Harbor shipyard?Answer: After dewatering, floating barges may be transported via land or water. The Contractor shalldetermine the means and method for transporting. The proposed method will need to be pre-approved bythe Ferry Division. Note that barges may be broken apart into smaller segments prior to relocating,which must occur prior to use of Shipyard crane (see question 4, below).4) When will laydown and staging areas be available?Answer: All staging areas will become available on September 14, 2026. At Hatteras, the smaller areawithin the access gate can be made available sooner; access and date must be coordinated with the FerryDivision in advance. Note, Contractor will be responsible for repairing any damage to the facilities,including asphalt.5) What are the access and coordination requirements for Silver Lake?Answer: Perimeter fencing is not present at Silver Lake. However, similar to Hatteras, all work willrequire prior coordination with the Ferry Division.6) What are the access and coordination requirements for removing the existing materials from SouthDock?Answer: This is within a secure area; prior coordination with the Ferry Division and a TWIC card will berequired.7) Which items from South Dock, if any, are to be delivered to the Mann’s Harbor Shipyard?Answer: The aluminum railings currently located at South Dock must be disconnected from the existingbarges and delivered to the Shipyard. All other items identified for removal will become the property ofthe Contractor.Submitted Questions:8) Concrete-Related Questions:A. To allow for longer concrete placement window, is it acceptable to use retarder?B. With the distance from the plant for both of these locations, [Supplier] will not be held liable for outof spec concrete related to time or temp… NCDOT is generally good about making concessions ontheseC. It will be challenging placing concrete at the Ocracoke side due to travel time. If concrete cannot beput to sleep is it acceptable to use bagged concrete?Answer to Grouping of Above Three Questions: Hydration controlling admixtures (not retarders), such asSika-440, may be allowable to put the concrete “to sleep” for up to 6 hours. Contractor will be requiredto submit this as part of mix design process post-award. Volumetric trucks are also approved but forClass B only. Bagged mixes are not acceptable for structural applications. Time and temperatureacceptance will be at the discretion of the Engineer.Page 2 of 7DA00645 Addendum #19) Are test piles/ lateral load testing of the fender piles required?Answer: No, these are not required.10) Can a vibratory hammer be used to install piles or will piles be required to be impacted?Answer: In accordance with the Special Provisions, a sufficiently sized vibratory or impact hammer shallbe used to install piles. All pile installations shall be attempted first with a vibratory hammer. The needfor an impact hammer is not anticipated, but it may be required to install piles to the target tip elevation.The special provision requires that the contractor prepare and submit a wave equation analysis and reportthat shall be used to assess the capability of the proposed driving system to install the piles.11) Can you provide information on the King pile to be demolished?Answer: Piles to be demolished are the existing floating dock guide and king piles. Guide piles are 30” indiameter, have tip elevation of -60.5’ NAVD88 and are filled with sand. King piles are 24” in diameter,have a tip elevation of -58.0’ NAVD88 and are filled with sand.12) Ocracoke sheet M-301 calls out railing as wood. Sheet M-502 calls for Aluminum.Answer: Aluminum is the correct material to be used; a revised sheet M-301 will be issued in asubsequent addendum.13) What portion of the steel pipe pile is to be coated?Answer: At a minimum, steel pipe piles shall be coated as follows: Ocracoke - from cutoff elevation to15’-0” MLLW, Hatteras – from cutoff elevation to -17’-0” MLLW.14) Can you provide a supplier for the piles and lumber? My suppliers cannot meet the requirements for .60cca, kiln dried MC-19, nor can they provide Dense/Select piles.Answer: Unfortunately, we are not able to specify suppliers. However, this question was only received bya single bidder.15) Is the top rail aluminum? Dimension on drawing says" 2-5/8" in text but 3" in section. Which one? 2-5/8"is available.Answer: 2-5/8” is the correct dimension for the aluminum top rail. A revised detail will be issued in asubsequent addendum.16) Can we use 2" X 2" rail posts? No readily available top bar for 2-1/2" posts.Answer: Yes, the 2” x 2” rail posts can be used. 2-1/2” posts were specified because they are generallycommercially available and preferred; please note, this question was only received by a single bidder.17) What is the finish for the railings? Powder coated? Mill?Answer: The railing finish shall be baked-on powder coated.18) Ocracoke M-102 Bumper Piles, please confirm lengths are correct.Answer: Lengths for bumper piles (6 total locations) were incorrect and have been updated. Plumb pileshave a length of 64.00’ and batter piles a length of 64.22’.Page 3 of 7DA00645 Addendum #119) Sheet G-002 Steel Pile Note 3. Where can I find Technical Specification Section 31 62 16?Answer: Technical Specification Section 31 62 16 is not applicable to this project. Refer to Ferry SpecialProvisions (Steel Fender Piles) included in contract documents.20) Questions Related to Spoil Site:A. Please specify where the offload/ offshore site is.B. Please specify where the spoil site is (offshore and inshore).Answer to Grouping of Above Two Questions: The upland disposal site for the dredged material is locatedon the north end of Ocracoke. Exhibit 1 has been posted to the project file on the Division 1advertisement page indicates a location map for the disposal site. The specific location within thedisposal site where spoils are to be placed will be determined at the time of dredging due to ongoingdredging operations prior to project; coordination with Ferry Division will be required prior to placement.21) Will special accommodation be available to utilize vehicle ferry for concrete placement days? Can theseoccur at night or off hours?Answer: Ferry Division will accommodate construction vehicle travel based on the published ferryschedule.22) Is dredge material hazardous?Answer: To our knowledge, none of the dredge material is hazardous. NCDOT permitted spoil site doesnot require hazardous material testing.23) Has a soil test of the dredge material been performed to confirm no contaminated soils?Answer: Borings were taken from basin during monopile design project but were not explicitly tested forcontamination. However, testing is not required for dredge spoils on this project.24) What is the vehicle weight limit of the ferry?Answer: If a vehicle is a typical road-legal weight, it can be accommodated on the published vehicleschedule. Ferries can accommodate overweight vehicles if they meet the road-legal requirements ofoverweight vehicles. If vehicles are overweight, additional scheduling accommodation will be required;coordination with Ferry Division will be needed. This is in addition to standard overweight permitsneeded for roadway travel.25) Is it acceptable to take material deliveries i.e. piles, lumber etc. from existing bulkhead?Answer: At Hatteras, materials can be delivered from land to water via the bulkhead. However, atOcracoke, access is more limited; unloading at Silver Lake will need to occur from the parking lotimmediately in front of passenger ferry docking location. Delivery from water to land is also acceptableat both locations with the above consideration for Silver Lake.26) Is there Environmental Permit TOYR for in-water work?Answer: Yes, there are time of year restrictions for in-water work from April 1 through September 30each year. The project schedule has been developed with this in mind, and these restrictions are thereforenot anticipated to impact the project’s availability.Page 4 of 7DA00645 Addendum #127) Nationwide permit in bid documents expired 3/14/26. Has permit been renewed?Answer: Permit is valid through 03/14/2027.28) Can you provide the geotechnical report by Caitlin Engineers to bidders?Answer: Yes; the reports have been posted to the project file on the Division 1 advertisement page.29) Floating Barge Weight Questions:A. What is the bare weight of the Poseidon barge?B. Can the plans/specs and weights for the existing temporary floating dock/barges be provided?The following answer applies to the above-two questions: Please reference the Poseidon plan sheets thathave been posted to the project file on the Division 1 advertisement page.30) Will basin area be closed off to boat traffic during dredging? If not, how is contractor to manage turbiditycurtain and monitoring?Answer: Basin will not be closed to all boat traffic during dredging operations. However, the FerryDivision will coordinate with the contractor to allow for operations to occur and to accomplish projectgoals. Placement and maintenance of turbidity curtains will be coordinated at that time. Note that theproject is occurring outside of peak ferry schedules.31) Please confirm where temporary floating docks are to be taken to? Are these going to be unloaded byNCDOT or the contractor?Answer: Floating docks are to be delivered to the NCDOT Ferry Division Shipyard located at 8550Shipyard Rd, Manns Harbor, NC 27953. The Shipyard will use its existing crane to unload the barges.The barges must be broken apart into smaller segments and dewatered prior to use of the Shipyard crane,which has a maximum capacity of 50 TON.32) The permitted dredge depth and design dredge depth are both 10’ MLLW. Typically, a tolerance isprovided between the max permitted and design depths to accommodate unavoidable inaccuracies in thedredging process. Will the State consider raising the design dredge depth to 9’ MLLW with 1’ ofallowable and payable overdepth.Answer: In accordance with the Special Provisions to facilitate dredging down to the required depth, theContractor may disturb one (1) foot below the required dredging depth provided. Refer to the SpecialProvisions (Dredging) for additional information.33) Is hydraulic dredging acceptable, and if so, can a disposal line be run from the dredge to an approvedoffshore disposal site?Answer: If the Contractor can identify and permit an offshore disposal site within the project timeline,hydraulic dredging would be acceptable and a disposal line could be run with agency approval.Contractor would also be responsible for determining acceptability of material for offshore disposal.Page 5 of 7
- Commodity Codes
-
- NAICS 237990Other Heavy and Civil Engineering Construction
- NAICS 336611Ship Building and Repairing
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Craven County Government Cent...
Bid Title: Craven County Government Center East Category: Craven County Bids Status: Open
Craven County Government
Bid Due: 7/16/2026
Follow ATV- FORT BRAGG Active Contract Opportunity Notice ID W911S226U3555 Related Notice Department/Ind.
DEPT OF DEFENSE
Bid Due: 7/09/2026