Gym Floor Refinishing
Project Information
- Bid Title
- Gym Floor Refinishing
- Issuing Agency
- Oldham County Schools
- Location
- Kentucky
- Published Date
- Nov 19, 2025
- Closing Date
- Dec 1, 2025
- Government Level
- State & Local
- Status
- Closed
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Gym Floor Refinishing
The Oldham County Board of Education will receive sealed bids until 2:30 PM on Monday, December 1, 2025 at the Administrative Offices Annex, 1900 Button Lane, LaGrange, Kentucky 40031 for Gymnasium Floor Refinishing. Specifications may be obtained by clicking the links below or contacting Stu Martin, Plant & Operations Manager, 1900 Button Lane, LaGrange, Kentucky 40031, telephone 502-222-3777 ext. 104.
File Format: PDF
File Format: Word Doc
Form of Proposal Form of Proposal
The Oldham County Board of Education reserves the right to reject any or all bids. - Attachment Preview
-
INVITATION TO BIDANDSPECIFICATIONSFORGYM FLOOR FINISHINGOLDHAM COUNTY BOARD OF EDUCATION1900 BUTTON LANELAGRANGE, KENTUCKY 40031BID DEADLINE: December 1, 2025TIME DEADLINE: 2:30 P.M. E.D.T.BIDS TO THE OFFICE OF: Stu MartinPlant & Operations ManagerOldham County Schools Administration Annex Building1900 Button LaneLaGrange, Kentucky502-222-3777 Ext 107OLDHAM COUNTY BOARD OF EDUCATION6165 WEST HWY. 146CRESTWOOD, KENTUCKY 40014OLDHAM COUNTY BOARD OF EDUCATION1900 BUTTON LANELAGRANGE, KENTUCKY 40031INVITATION TO BIDGYM FLOOR REFINISHINGThe Oldham County Board of Education invites you to bid on Gym Floor Refinishing for the FY26.CONDITIONS OF BIDDINGA. BID DATEBids will be received in the office of the Plant & Operations Manager, Oldham County SchoolsAdministration Annex Building, 1900 Button Lane, Lagrange, Kentucky 40031, Attention:Stu Martin, until 2:30 P.M. E.D.T. through December 1, 2025. All bids must be received bythe time designated above. ANY BID RECEIVED AFTER THIS TIME WILL NOT BECONSIDERED. Bids will be opened in Room 107 of the Administrative Annex.Bids shall specify the total price for the services, along with detail of the charges by School.No immediate decision shall be rendered concerning the proposals submitted. Bids will beevaluated and a contract will be approved for the successful bidder at the December 15, 2025Board Meeting.B. Awarding the ContractNo bid shall be withdrawn for a period of sixty (60) days after scheduled closing time.After the bids have been tabulated and studied, agents and/or company representatives maybe interviewed by the Director of Facilities or Plant & Operations Manager concerning theirbid.The Board will give formal consideration to these bids, after the bid tabulation, at the nextBoard meeting and reserves the right to accept or reject any and all bids. The selectionprocess will be based on the “lowest and/or best bid” basis, including past experience ofbidders in providing services to Kentucky School Districts, the ability to deliver services on apre-determined schedule, the overall quality/scope of work.The Oldham County Board of Education reserves the right to waive defects and informalitiesin proposals, to reject any or all proposals, or to accept any proposal as may deemed to itsinterest and to award by item, combination of items or lot.The Oldham County Board of Education reserves the right to delete or add quantities of gymfloor refinishing based on the bid prices.C. SpecificationsGeneral conditions and specifications are attached.This contract will be for the 2026 fiscal school year with the option to renew at the beginningof each year for four (4) additional years, provided such renewal is mutually agreeable to bothparties. Agreement concerning renewal shall be reached thirty (30) days prior to expirationdate.D. Procedure for Refinishing Gym Floors:1. Remove all soil. Wear non-marking soft-soled “gym” shoes. Check for and remove anywax, gum, or other substances from floor before proceeding.2. Remove/protect all floor covers and devices for electrical boxes, volleyball standards, orother similar equipment to protect finishes from damage during screening or finishing.3. Screen entire floor with medium (120) grit screen until floor is uniformly dull. RemoveALL swirl marks caused by medium screens using 3M Scotch Brite Surface Prep (maroon)pads. Floor area should be uniformly dull. Caution must be taken to screen all edges andcorners using hand equipment if necessary.4. Thoroughly clean floor area by vacuuming dust in all areas, including under bleachers,in doorways, and all areas adjacent to work area.5. Using dampened Turkish towels tightly wrung out, tack floors with cleaning solventprovided by the winning bidder from a list of acceptable products in Group 3 of MapleFloor Manufacturers Association (MFMA). Repeat tacking until floor is dust-free.6. Allow floor to completely dry.7. Inspect floor making sure all areas are uniformly dull. Suspect areas should berescreened and steps 3-6 should be repeated.8. Apply one coat of floor finish with lambs wool applicator.9. Block and place signage at ALL gym entrances and insure all doors are locked prior toleaving for the day. Notify school staff of time frame required, per floor finishmanufacturer, to stay off refinished floor until product has fully cured and traffic can beallowed back on floor.10. Custodial staff at each site shall be instructed and provided written instructions for floorcare and maintenance including floor products to clean and maintain the coefficient offriction on the surface.11. All areas shall be left clean and free of debris. Any spills and trash left in preparationand staging areas shall be thoroughly cleaned and trash disposed of properly.12. Remove all masking and debris. Replace any covers and equipment that may have beenremoved back to its proper location.E. Finish:1. The Oldham County Board of Education may elect to furnish “Hillyard 450 Gym Finish”(or Equal). The winning bidder may be asked to provide pricing, separate from thisproposal, for the above and/or approved equal finish. The finish provided by the winningbidder must be selected from the list of acceptable products in Group 3 of Maple FloorManufacturers Association (MFMA) and comply with specifications provided by Group 3gymnasium finishes. The finish type is included for informational purposes only. All othersupplies and equipment are the responsibility of the contractor.2. No claims for additional time or payment due to finish properties will be considered afterthe bid date.F. Certification and Qualifications of Tradesmen:1. Finishers shall be required to possess skills in the trade to provide a quality finish andbe knowledgeable in the application of floor finishes.2. Bidders will be required upon request to provide documentation of the experience andqualifications of the workers assigned to this project.G. Equipment and Supplies:The winning bidder shall provide all equipment, tools, and supplies required to perform thework. The owner may provide the floor finish or ask the winning bidder to price, separatelyfrom this agreement, an approved floor finish. Cleaning solvent is to be provided by thewinning bidder and is to be an approved cleaning solvent.H. Scheduling of Work:The contractor shall be required to schedule the work according to the schedule preferred byStu Martin, Plant & Operations Manager, 502-222-3777 ext. 107. Depending upon thesummer activity schedule at each school, this may require work to be completed duringevening hours, weekends, or holidays. All work must be completed before the start of school.All High School and Middle School floors shall be started and completed during thedesignated KHSAA “Dead Period” for that year. This is usually late June through early July.I.Payment:Payment will be made lump sum upon final completion and acceptance of the work, uponboard approval.GYM FLOOR REFINISHINGGENERAL CONDITIONS AND SPECIFICATIONSA. Scope of WorkThe Contractor shall furnish all materials, labor, and equipment forScrubbing and re-coating the following gym floors:EVEN YEAR SCHEDULESchoolNorth Oldham High School (Main Gym)North Oldham High School (Auxiliary)Oldham County High School (Bldg. #1)*South Oldham High School (Main Gym)North Oldham Middle SchoolCenterfield ElementaryCrestwood ElementaryGoshen Elementary at HillcrestHarmony ElementaryKenwood Station ElementaryLaGrange Elementary SchoolSquare Feet11,0139,1659,1188,7369,3175,3655,9935,6005,9886,0096,298Total Square Feet82,602ODD YEAR SCHEDULESchoolNorth Oldham High School (Main Gym)Oldham County High School (Bldg. #1)*South Oldham High School (Main Gym)*South Oldham High School (Auditorium)*East Oldham Middle SchoolOldham County Middle SchoolSouth Oldham Middle SchoolBuckner ElementaryLocust Grove ElementarySquare Feet11,0139,1188,7364,1859,9647,1108,0105,4605,830Total Square Feet69,426*Use water-based floor finish**LaGrange Elementary and Camden Station Elementary stage floors get refinished every 6 years.Both are due to be refinished again in 2030.***OCHS’s new gymnasium has an expected completion date of Fall 2026. Square footage will be14,566 SF.
- Commodity Codes
-
- NAICS 238330Flooring Contractors
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Athletic Apparel, Equipment, ...
Bid/RFP Number Bid/RFP Title Posting Date Closing Date/Time 2027-02 Athletic Apparel, Equipment, Uniforms,
Warren County Public Schools
Bid Due: 7/09/2026
Athletic Apparel, Equipment, ...
Bid/RFP Number Bid/RFP Title Posting Date Closing Date/Time 2027-02 R1 Athletic Apparel, Equipment,
Warren County Public Schools
Bid Due: 7/09/2026