Central Wastewater Treatment Plant Final Clarifier 3 Rebuild
Project Information
- Bid Title
- Central Wastewater Treatment Plant Final Clarifier 3 Rebuild
- Issuing Agency
- City of Waco
- Location
- Texas
- Published Date
- Sep 28, 2025
- Closing Date
- Oct 23, 2025
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- RFB 2025-073
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Project: Central Wastewater Treatment Plant Final Clarifier 3 RebuildRef. #: RFB 2025-073Department: Water UtilitiesType: RFBStatus:OpenOpen Date: Sep 26th 2025, 8:00 AM CDTQuestions Due Date: Oct 17th 2025, 5:00 PM CDTContact Information: Christopher Hanchard, ChristopherH@waco.govClose Date: Oct 23rd 2025, 2:00 PM CDT
Project Description: The selected contractor shall provide all labor, equipment, materials, appurtenances, and incidentals necessary to complete the demolition, removal, disposal, and installation work required to fully rebuild the Secondary Clarifier #3 at the Central Wastewater Treatment Plant in accordance with Evoqua specifications. The scope includes removing and replacing worn or damaged mechanical components which include center column, rake arms, nuts, bolts, other hardware, skimmers, gear box, motor, and large lower gear box previous purchased by the City of Waco from Evoqua and ensuring existing electrical and process water plumbing are returned to original functioning status. The contractor must perform all necessary adjustments to ensure the clarifier functions per manufacturer standards, coordinate inspection and startup testing with an Evoqua authorized representative (at the City of Waco’s cost), and ensure the unit passes all functionality tests. All work shall comply with applicable OSHA safety standards, municipal codes, and environmental regulations. At project close-out the contractor shall submit as-built drawings, a completion report, and provide a standard labor warranty. The project requires all site work, labor, equipment, and materials complete and in
place as stated in the RFB, shown on the plans, and specified herein.
General Contractor shall self-perform 51% of this project.
Liquidation Fee is $1,000.00 for each day of delay.
TxDot Qualifications are NOT Required for this project.
- Commodity Codes
-
- NAICS 221320Sewage Treatment Facilities
- NAICS 237110Water and Sewer Line and Related Structures Construction
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Regional Airport Entry Vestib...
Bid Number: RFP 04-26 Bid Title: Regional Airport Entry Vestibule Door Replacement Project
City of Wichita Falls
Bid Due: 7/07/2026
RFQ 2026-12 SH 146 AT 10TH ST...
Bid Number: 2026-12 Bid Title: RFQ 2026-12 SH 146 AT 10TH ST ART
Seabrook city
Bid Due: 7/21/2026