Twin Peaks Promenade [CITYWIDE PLA]
Project Information
- Bid Title
- Twin Peaks Promenade [CITYWIDE PLA]
- Issuing Agency
- City and County of San Francisco
- Location
- California
- Published Date
- Nov 20, 2025
- Closing Date
- Jan 7, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- 0000011188
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
Request for Bids or Qualifications/Proposals
Estimated Cost/Contract Amount:
Approximately $2,200,000.00
Due Date:
01/07/2026
Due Time: 02:30PM
Bid/Proposal Submission Location:
Bids shall be submitted online via ShareFile until 2:30:00 p.m. on January 7, 2026, after which the bid opening will be conducted live online via Microsoft Teams. Contract Administration will email the Microsoft Teams meeting information to all Plan Holders approximately 24 hours prior to Bid opening.
Duration:
186 consecutive calendar days
Project Zip Code:
Advertisement Date:
11/20/2025
Contacts
Contact Type
Contact Name
Contact Email
Project Manager
Keri Ayers
Keri.Ayers@sfgov.org
Contract Compliance Officer
James Chung
James.Chung@sfdpw.org
City’s Contractor Development Program
City’s Contractor Development Program
cdp@imwis.com
Pre-Bid/Pre-Proposal Conference
Location:
A pre-bid meeting will be held on site on Wednesday, December 3, 2025, at 9:00 AM at 501 Twin Peak Boulevard, San Francisco. Meet at the parking area between the two peaks.
Date:
12/03/2025
Time:
09:00AM
Attendance:
Project Scope
Project Description
Scope of Work: The Twin Peaks Promenade Project will transform approximately one-third of a mile of the eastern alignment of Twin Peaks Boulevard—permanently closed to vehicular traffic—into a linear park featuring a multi-use recreational trail. Located within an Environmentally Sensitive Area (ESA) that supports the federally protected Mission Blue Butterfly, the project requires careful protection and restoration of natural habitat during construction. Work includes removal of a portion of existing asphalt pavement and installation of stabilized soil trail paving. Most existing concrete barriers and steel guardrails will be removed. Improvements will include new seating areas with benches, concrete seatwalls, wood plank benches, and ornamental boulders. Trail edges will be defined with gabion walls, Sutter walls, and redwood headers, with split-rail fencing installed to protect sensitive habitat areas. The parking lot will be reconfigured and restriped to include an ADA-accessible p
Project LinksAdvertisements 00000011188 - Legal Notice Bid ResultsAwardsBid Documents DPW Electronic Bid Documents Download SiteInsurance
Insurance Type
Amount
- Attachment Preview
-
ADVERTISEMENT FOR BIDSCITY & COUNTY OF SAN FRANCISCOSAN FRANCISCO PUBLIC WORKSSourcing Event ID No.: 00000111880000011188 - Twin Peaks Promenade [CITYWIDE PLA](PW TWIN PEAKS PROMENADE)Bids shall be submitted online via ShareFile until 2:30:00 p.m. on January 7, 2026, after which the bidopening will be conducted live online via Microsoft Teams. Contract Administration will email the MicrosoftTeams meeting information to all Plan Holders approximately 24 hours prior to Bid Opening. Digital filesof Bid Documents, Plan Holders Lists, and Addenda may be downloaded at no cost from the PublicWorks Electronic Bid Documents Download site at https://bsm.sfdpw.org/ContractAdmin/Login.aspx.Please visit the Contracts, Bids and Payments webpage at https://bidopportunities.apps.sfdpw.org formore information. Notices regarding Addenda and other bid changes will be distributed by email to PlanHolders.Scope of Work: The Twin Peaks Promenade Project will transform approximately one-third of a mile ofthe eastern alignment of Twin Peaks Boulevard—permanently closed to vehicular traffic—into a linearpark featuring a multi-use recreational trail. Located within an Environmentally Sensitive Area (ESA) thatsupports the federally protected Mission Blue Butterfly, the project requires careful protection andrestoration of natural habitat during construction. Work includes removal of a portion of existing asphaltpavement and installation of stabilized soil trail paving. Most existing concrete barriers and steelguardrails will be removed. Improvements will include new seating areas with benches, concreteseatwalls, wood plank benches, and ornamental boulders. Trail edges will be defined with gabion walls,Sutter walls, and redwood headers, with split-rail fencing installed to protect sensitive habitat areas. Theparking lot will be reconfigured and restriped to include an ADA-accessible parking stall and bicycleparking at three locations. Service and emergency vehicle access will be provided at both the north andsouth ends of the promenade with removable bollards. The project also includes erosion controlmeasures, habitat restoration through native plantings, and installation of wayfinding, interpretive, andtrail map signage.The time allowed for completion is 186 consecutive calendar days. The estimated construction cost isapproximately $2,200,000. For more information, contact the Project Manager Keri Ayers by phone:(415) 885-9252 or email: Keri.Ayers@sfgov.org.On July 1, 2014, the registration program under section 1725.5 of the California Labor Code went intoeffect. The program requires that all contractors and subcontractors who bid or work on a public worksproject register and pay an annual fee to the California Department of Industrial Relations (“DIR”).No contractor or subcontractor may be listed in a bid or awarded a contract for a public works projectunless registered with the DIR as required by Labor Code section 1725.5 [with limited exceptions fromthis requirement for bid purposes only under Labor Code section 1771.1(a)].This Project shall incorporate the required partnering elements for Partnering Level 2. Refer toSection 01 31 33 for more details.Pursuant to San Francisco Administrative Code (“Administrative Code”) Section 6.25 and Chapter 25 ofthe Environment Code, “Clean Construction” is required for the performance of all work.The Specifications include liquidated damages. Contract will be on a Lump Sum Bid Items With UnitPrices basis. Progressive payments will be made.The Contract will be awarded to the lowest responsible responsive bidder.A bid may be rejected if the City determines that any of the bid item prices are materially unbalanced tothe potential detriment of the City.Bid discounts do not apply per Administrative Code Chapter 14B. The LBE Subcontracting ParticipationRequirement and Good Faith Efforts are not required for this contract. Other CMD requirements shallapply. For details, contact James Chung by phone at (415) 554-0640 or by email atJames.Chung@sfgov.org.A pre-bid meeting will be held on site on Wednesday, December 3, 2025, at 9:00 AM at 501 Twin PeakBoulevard, San Francisco. Meet at the parking area between the two peaks.For information on the City’s Contractor Development Program, call (415) 986-3999 or emailcdp@imwis.com.A corporate surety bond or certified check for ten percent (10%) of the amount bid must accompany eachbid. Administrative Code Section 6.22(a) requires all construction greater than $25,000 to includeperformance and payment bonds for 100% of the contract award.Class "A" license is required at time of award.In accordance with Administrative Code Chapter 6, no bid is accepted and no contract in excess ofThreshold is awarded by the City and County of San Francisco Department of Public Works until suchtime as the General Manager of the Recreation and Park Department recommends the contract foraward, and the Recreation and Park Commission then adopts a resolution awarding the Contract.Pursuant to Charter Section 3.105, all contract awards are subject to certification by the Controller as tothe availability of funds.Minimum wage rates for this project must comply with the current General Prevailing Wage as determinedby the State Department of Industrial Relations and the Federal General Prevailing Wage Determinationsof the Secretary of Labor under the Copeland Act. Minimum wage rates other than applicable to GeneralPrevailing Wage must comply with San Francisco Labor and Employment Code Article 111: MinimumCompensation. In addition, the San Francisco Citywide Project Labor Agreement (PLA) became effectiveon July 14, 2020. This Contract is a Covered Project and Bidders are advised that the PLA isincorporated into the contract documents. More information about the PLA can be found at:https://sfgov.org/olse/citywide-project-labor-agreementBidders are hereby advised that the Contractor to whom the Contract is awarded must be certified by theContract Monitoring Division as being in compliance with the Equal Benefits Provisions of Article 131 ofthe San Francisco Labor and Employment Code within two weeks after notification of award.If a bidder objects on any ground to any bid specification or legal requirement imposed by thisAdvertisement for Bids, the bidder shall, no later than the 10th working day prior to the date of BidOpening, provide written notice to the Contract Administration Division, San Francisco Public Works,setting forth with specificity the grounds for the objection.Right reserved to reject any or all bids and waive any minor irregularities.
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Southeast Water Pollution Con...
Bid Details RFP for DB-140 Southeast Water Pollution Control Plant - Secondary Clarifiers
San Francisco Public Utilities Commission
Bid Due: 8/05/2026
Project: TEC Modernization Addition Ref. #: 2026-1683 Type: ITB Status: Open Open Date:
Alameda-Contra Costa Transit District
Bid Due: 7/21/2026