J041--LOU Refurbish AHU
Project Information
- Bid Title
- J041--LOU Refurbish AHU
- Issuing Agency
- VETERANS AFFAIRS, DEPARTMENT OF
- Location
- Virginia
- Published Date
- Jun 8, 2026
- Closing Date
- Jun 18, 2026
- Government Level
- Federal
- Status
- Closed
- Ref. #
- 36C24926Q0231
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Set Aside
- Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
- Project Description
-
FollowJ041--LOU Refurbish AHUActiveContract OpportunityNotice ID36C24926Q0231Related NoticeDepartment/Ind. AgencyVETERANS AFFAIRS, DEPARTMENT OFSub-tierVETERANS AFFAIRS, DEPARTMENT OFOffice249-NETWORK CONTRACT OFFICE 9 (36C249)General Information View ChangesLooking for contract opportunity help?
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Combined Synopsis/Solicitation (Updated)
- Updated Published Date: Jun 08, 2026 01:58 pm CDT
- Original Published Date: May 27, 2026 07:37 am CDT
- Updated Date Offers Due: Jun 18, 2026 11:00 am CDT
- Original Date Offers Due: Jun 18, 2026 11:00 am CDT
- Inactive Policy: Manual
- Updated Inactive Date: Jul 18, 2026
- Original Inactive Date: Jul 18, 2026
-
Initiative:
- None
Classification View Changes- Original Set Aside: Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
- Product Service Code: J041 - MAINT/REPAIR/REBUILD OF EQUIPMENT- REFRIGERATION, AIR CONDITIONING, AND AIR CIRCULATING EQUIPMENT
-
NAICS Code:
- 238220 - Plumbing, Heating, and Air-Conditioning Contractors
-
Place of Performance:
Robley Rex VA Medical Center Louisville , 40206
Description View ChangesThe purpose of this amendment is to post Questions and Answers to Solicitation 36C24926Q0231 LOU AHU Refurbish
Questions and Answers 36C24926Q0231 LOU AHU Refurbish
Questions - Will a site visit be scheduled for this project?
ANSWER: Yes, we need a site visit for this project.
Please email Adam.Quintel@va.gov and Matthew.Stevens@va.gov to schedule a site visit.
Question: We would like to know if this is a brand new contract OR if there is (was) an incumbent performing these services. If not brand new, could you please provide the current / previous contract number?
ANSWER: This is a new contract
Question (REFERENCE SOW 1.1.1-.1.1.5) It says to replace the DX coil with a new replacement to match the existing.-We need the size and the specification of the existing in order to match this.
ANSWER: This can be obtained during the site visit.
Question (REFERENCE SOW 1.1.1-.1.1.5) It says to replace the Chilled Water coil with a new one to match the existing.- We need the size and the specification of the existing in order to match this.
ANSWER: See #3
Question (REFERENCE SOW 1.2.1-.1.2.9) Define what parts of the AHU are to receive this coating system, is it just the drain pans?
ANSWER: Site visit
Question (REFERENCE SOW 1.2.1-.1.2.9) Is there a specification for the coating system?
ANSWER: Site visit
Question (REFERENCE SOW 1.2.1-.1.2.9) What company has the VA used for specialty coatings at this facility for this equipment? Does the Superintendent need to be directly employed by the Prime Contractor?
ANSWER: site visit
Question: What are the required working hours for this project? Nights, weekends, or normal business hours?
ANSWER: Weekends and nights
Question: Must the Superintendent be on site at all times while work is commencing?
ANSWER: Site visit
Question: Does the SSHO (Site Safety Health Officer) need to be directly employed by the Prime Contractor?
ANSWER: Site visit
Question: Must the SSHO be on site at all times while work is commencing?
ANSWER: Site visit
Question: Can the Superintendent & SSHO be a dual-hatted individual assuming that individual is qualified for both roles?
ANSWER: Site visit
Question: Are there any other mandatory on-site roles required in this contract?
ANSWER: Site visit
Question: When does the VA expect the project to start following the award?
ANSWER: Site visit
Question: Are there any concerns for Asbestos Containing Material or Lead in the areas being worked in?
ANSWER: Site visit
Question: Are there any ICRA requirements for this project?
ANSWER: Site visit
Question: Is this contract Tax Exempt?
ANSWER: Yes
Question: Please confirm that and all Basis of Design items and materials that the VA has satisfied all Buy American Waivers, if applicable, and sole source requirements as needed. Please provide us any Buy American Act Waivers that would be provided under this contract. This is not currently in the plans, documents, or specifications.
ANSWER: Site visit
Question: Will the VA pay for the engineering and design submittals, as well as all applicable deposits required by various manufacturers to put equipment into design and/or production?
ANSWER: Site visit
Question: Is the new VA memorandum on bolts for steam and hot water systems applicable to this project? To our understanding A307 bolts are no longer allowed.
ANSWER: Site visit
Question: Tax Exemption: Is this project sales tax-exempt? If so, can the government provide a tax exemption certificate for materials purchased?
ANSWER: See Question 17
Question: Notice to Proceed (NTP): How soon after a contract award is the NTP expected to be issued?
ANSWER: Once the order is awarded, there is no need for a NTP.
Question: Submittal Platform: Will the VA accept the use of Procore software or equivalent as the primary submittal platform?
ANSWER: No, see ADDENDUM to FAR 52.212-1 for submittal information.
Question: Payment for Stored Materials: Will payment applications for materials stored on-site or in a bonded warehouse be approved?
ANSWER: No.
Question: Bid Hold Period: Will the government consider reducing the bid hold period to 90 days due to current inflation risks?
ANSWER: No.
Question: Economic Price Adjustment Clause: Will the government include an Economic Price Adjustment Clause in the contract to address price fluctuations in materials?
ANSWER: No.
Question: SSHO and Superintendent Roles: Can the SSHO, QCM and superintendent positions be fulfilled by the same individual, provided qualifications are met? If not, can the superintendent double as the SSHO?
ANSWER: Site visit
Question: Scheduling Consultant: Is an external scheduling consultant required, or can scheduling duties be handled in-house by a qualified team member?
ANSWER: Site visit
Question: Temporary Facilities: Are contractors required to provide a temporary site office or trailer, or will space be allocated within the existing facility?
ANSWER: Site visit
Question: Parking and Staging: Will there be designated parking and staging area for contractor personnel?
ANSWER: Site visit
Question: How many parking spaces will be provided if there is on-site parking?
ANSWER: Site visit
Question: Site Access and Badging: Will the government provide a detailed badging and access protocol for contractor personnel?
ANSWER: Site visit
Question: Fire Watch: If impairments to fire alarm systems exceed four hours, will the VA provide support for fire watch personnel, or is the contractor solely responsible?
ANSWER: Site visit
Question: Environmental Protection Plan: Are there specific templates or guidelines required for the Environmental Protection Plan, or is a contractor-developed plan sufficient?
ANSWER: Site visit
Question: Infection Control: What are the ICRA requirements? Please confirm modular walls (such as STARC) are allowed for ICRA.
ANSWER: Site visit
Question: As-Built Drawings: Are as-built drawings available for existing conditions, or will the contractor need to verify all dimensions on-site?
ANSWER: Site visit
Question: For AHU 43: What are the exact dimensions and specifications for the existing DX coil and chilled water coil to be replaced?
ANSWER: Site visit
Question: The SOW states refrigeration removal by others, who is handling the refrigeration removal. Will it be completed before contractor mobilization?
ANSWER: Site visit
Question: Beyond AHU 23 are there any coil replacements or major component replacements expected on the other 7 units?
ANSWER: Site visit
Question: What are the working hours? Can this work be performed during regular working hours?
ANSWER: Site visit
Question: How long can each AHU be taken offline? Can more than one unit be repaired at a time?
ANSWER: Site visitAttachments/LinksContact InformationHistoryContracting Office Address- VISN 9 CONSOLIDATED ACQUISITION 3400 LEBANON ROAD
- MURFREESBORO , TN 37129
- USA
Primary Point of Contact- diane.ziegler@va.gov
- diane.ziegler@va.gov
- Phone Number 615-225-6479
Secondary Point of Contact
- Jun 08, 2026 01:58 pm CDTCombined Synopsis/Solicitation (Updated)
- May 27, 2026 07:37 am CDT Combined Synopsis/Solicitation (Original)
- Commodity Codes
-
- FSC JMaintenance, Repair, and Rebuilding of Equipment
- NAICS 238220Plumbing, Heating, and Air-Conditioning Contractors
- Related bids
-
May 27, 2026 [Combined Synopsis/Solicitation (Original)] J041--LOU Refurbish AHUs Jun 11, 2026 [Combined Synopsis/Solicitation (Updated)] J041--LOU Refurbish AHU Jun 16, 2026 [Combined Synopsis/Solicitation (Updated)] J041--36C249-26-AP-1581 Proj. 603-26-905 Refurbish AHUs (Eng.) (VA-26-00042582) Jun 22, 2026 [Combined Synopsis/Solicitation (Updated)] J041--LOU Refurbish AHUs Aug 21, 2026 [Combined Synopsis/Solicitation (Updated)] J041--LOU Refurbish AHUs
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
USNS MEDGAR EVERS (T-AKE 13 )...
Follow USNS MEDGAR EVERS (T-AKE 13 ) ROHDD Active Contract Opportunity Notice ID
DEPT OF DEFENSE
Bid Due: 9/15/2026
Aviation Drive/Valley View Bo...
Title Aviation Drive/Valley View Boulevard Pedestrian Improvements Solicitation Type ITB Status Active Buyer
City of Roanoke
Bid Due: 9/16/2026