WAN Installation
Project Information
- Bid Title
- WAN Installation
- Issuing Agency
- Leon County School District
- Location
- Florida
- Published Date
- Dec 9, 2025
- Closing Date
- Jan 9, 2026
- Government Level
- State & Local
- Status
- Closed
- Ref. #
- 109-2026
- Original Source
- Join to Access Full Details
- Bid Inquiries
- Join to Access Full Details
- Bid Documents
- Join to Access Full Details
- Project Description
-
TYPE Number Name PRE-BID CONFERENCE Questions Due Bids Due Evaluation Team Meeting Negotiation Meetings Documents ITN 109-2026 WAN Installation 12/2/2025
@ 10:00 a.m.12/3/2025
@ 5:00 P.M.1/09/2026
@ 2:00 pm1/14/2026 2/17/2026 - Attachment Preview
-
Addendum #002Invitation to Negotiate (ITN) 109-2026Wide Area Network (WAN) InstallationDate: December 09, 2026Solicitation: ITN 109-2026 Wide Area Network (WAN) InstallationBid Opening: January 09, 2026, at 2:00 P.M. ESTFailure to file a protest within the time prescribed in Section 120.57(3), Florida Statutes, or failure topost the bond or other security required by law within the time allowed for filing a bond shall constitutea waiver of proceedings under Chapter 120, Florida Statutes.This Addendum provides the Board's written answers to the timely written questions received.QuestionAnswer1. Ask for an extension due to the holidays?No2. Exhibit A only shows 1 x 10G but the SOW shows 2x 10G circuits (page 11 current WAN design)?There are 2 10G3. What is the main difference between the Leased LITand Leased Dark Fiber option if managed layer 3routing, switching and power equipment is requiredfor both options?Layer 3 managed services are expected to be includedfor all equipment associated with the proposed design.While the standard approach assumes that all necessaryequipment will be owned, managed, and maintained bythe Awardee, the District is open to consideringalternative solutions that meet service and performancerequirements. Any costs associated with the chosenequipment and service model must be clearlyrepresented as part of the monthly recurring charge.4. For the LDF option can the service provider onlyprovide the Dark Fiber for connectivity between sites Noand end user LIT the fiber with their own equipment?5. For the Leased LIT option can the service providerprovide Layer 2 connectivity and end user provideNoLayer 3 routing capabilities?6. Is a single fiber lateral and entrance cable acceptableto all remote locations that is not deemed a Hub orYesAgg site?QuestionAnswer7. Is it mandatory to provide managed layer 3 routing,switching and power equipment for the LDF option?Yes8. At each location, hub, agg or remote what type ofdevice will the service provider circuit be connecting to Cisco or Meraki OSPF routingand is static routing or dynamic routing required?9. If Leon County Schools main hub site fails, does LeonCounty Schools have a DR location?No10. Who is the service provider for the 2 x 10G Internetcircuits?Lumen11. Are both Internet circuits located at the LeonCounty Schools main hub site?Yes 520 S. Appleyard dr.12. Does Leon County Schools host any applications inAzure or AWS cloud?Yes13. Are the schools that are listed twice require twocircuits and is the demarc for each circuit the same?No 1 Demarc per site14. Is there a threshold to the one-time constructioncharges that would be over the budget of what thedistrict would allow?Per E-Rate rules, the District will accept all proposals thatinclude Special Construction and will award to the mostcost-effective solution.15. On the RFP the bandwidth is listed with scalable asa requirement, but scalable bandwidth is notrequested on your FCC Form 470?16. For sites with two separate schools/BEN’s, is onlyone circuit required, or will each BEN require their owndedicated circuit?o 3955 W Pensacola St Leon County Media Center –BEN 127598 Leon County Virtual School –BEN 16084496o 3397 W Tharpe St Leon County Construction –BEN 16030293 Leon County Facilities Planning– BEN 16030291o 854 Blountstown St Success Academy at GhazviniLearning Center – BEN 35265The 470 minimum bandwidth request of 10 Gbps with amaximum of 100 Gbps.One CircuitThe Leon County Virtual School is ineligible for E-Ratefunding and was listed by mistake. It should not beconsidered as part of your network design.ITN 109-2026 Wide Area Network (WAN) InstallationPage 2 of 4QuestionSecond Change at Ghazvini Learning Center – BEN16031060Answer17. For clarification, will Leon County School Districtconsider utilizing the respondent’s existing masterservice agreement with the School District as aNobaseline?18. Will the State consider the inclusion ofRespondent’s applicable service schedules for theYesservices set forth in the RFP?19. Will Leon County allow negotiation of additionalterms upon an award?No20. May proposers submit exceptions to the RFP’sterms and conditions?21. Layer 3 Managed Services:▪ Please confirm that full Layer 3 routing and networkmanagement is required for all proposed solutions.▪ Will the District retain any control over routingpolicies, or is this fully vendor-managed?NoSee answer to #322. Equipment Ownership & Cost:▪ Does “equipment necessary for the service tofunction” include core routers, switches, and firewalls,or only WAN-specific hardware?▪ Should equipment refresh during the contract termbe included in the monthly recurring cost?WAN specific hardwareYes on equipment refresh23. Fiber Design Options:▪ If proposing Leased Dark Fiber, will the Districtprovide and manage Layer 3 equipment, or is thevendor still responsible for Layer 3 services?▪ Are hybrid solutions (combination of lit and darkfiber) acceptable?See answer to #3Yes to Hybrid24. Bandwidth & Scalability:▪ What is the minimum and target bandwidth per site?▪ Are there future scalability requirements (e.g.,10Gbps or higher)?10Gbps Minimum scalable to 40 Gbps 100 Gbps at Hubsites and Data center25. Service Level Agreements:Section 2.6 PG 14 of the ITNITN 109-2026 Wide Area Network (WAN) InstallationPage 3 of 4Question▪ What uptime guarantees and penalties for non-compliance are required?▪ Are there specific response and repair timerequirements for outages?Answer26. Transition & Cutover:▪ Is there a required timeline for migration from thecurrent network to the new solution?▪ Will there be a dual-running period for testing?27. Security Requirements▪ Are there specific cybersecurity standards (e.g., NIST,CIPA compliance) that must be met?▪ Should the vendor provide firewall and filteringservices as part of Layer 3 management?LCSD requests that all locations be activated by6/30/2026. If unable to meet that deadline, vendorsmust provide a detailed timeline for bringing all sitesonline in their response.Dual network yesCIPA Compliance is not requested on this ITN.No NistNo firewall or filtering services are requested on this ITN.28. Evaluation Criteria▪ How will proposals be scored between lit fiber vs.dark fiber solutions?▪ Is cost weighted more heavily than technicalcapability?Both Dark and Lit Fiber services will be evaluated usingthe criteria provided on ITN pages 22-24Yes, Cost of eligible goods and services is the mostheavily weighted criteria at 35%ITN 109-2026 Wide Area Network (WAN) InstallationPage 4 of 4
- Commodity Codes
-
- NAICS 541512Computer Systems Design Services
- NAICS 541519Other Computer Related Services
* Disclaimer: Government BidHub provides information on bids, RFPs (Requests for Proposals), and RFQs (Requests for Qualifications) solely for convenience and informational purposes. This site is not an official public notice board. For official details, responses, or inquiries, please contact the relevant government agency directly.
Empower Your Bidding Strategy
Unlock Government BidHub's unparalleled access to high-quality, tailored bid information.
- Access an extensive database of bids, including comprehensive local and state opportunities.
- Receive customized alerts for the bids that matter most to your business.
- Explore detailed specifications to ensure precise and competitive submissions.
- Gain a competitive edge with up-to-date information and exclusive opportunities.
See Also
Annual Software Maintenance S...
Advertisement Detail Department of Transportation Agency Decisions Annual Software Maintenance Support for EFBP
State Government of Florida
Bid Due: 10/11/2090
LICENSING AND MAINTENANCE FOR...
Advertisement Detail Department of Transportation Agency Decisions LICENSING AND MAINTENANCE FOR DR. RAYMOND
State Government of Florida
Bid Due: 10/11/2090